Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on August 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Cape Coral

Awarded
H1241State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under solicitation number H1241, the City of Cape Coral has entered into a Sub-Recipient Agreement with the Florida Division of Emergency Management Mitigation Bureau as part of the Hazard Mitigation Grant Program. The project, which runs from June 02, 2025, to May 31, 2028, involves a total match amount of 13,938,757.00 dollars. The primary objective is to secure critical infrastructure by providing backup power to fifty-two sewage lift stations across various zip codes in Cape Coral, Florida, to prevent service loss and sewer overflows during power outages. The scope of work includes the purchase and installation of fifty-two permanent generators, each equipped with an equipment pad, an automatic transfer switch, a diesel supply tank, and necessary electrical connections. To ensure resilience, all installations must be protected against a 500-year flood event, comply with National Flood Insurance Program requirements, and meet ASCE 7 standards for wind protection through rated enclosures and appropriate anchoring. All activities must adhere to National Electrical Code working clearance requirements and remain in strict compliance with all applicable federal, state, and local rules and regulations.

General Info

Cape Coral will install 52 backup generators for sewage stations through May 2028.

Contract Value

$0

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

May 31, 2028

Documents

1
PDF, High priority: read this firstcontract-document
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program (HMGP) project, the Sub-Recipient shall provide backup power to fifty-two (52) sewage lift stations, located within Cape Coral, Florida 33903, 33904, 33909, 33914, 33990, 33991.The HMGP project shall provide protection by purchasing and installing fifty-two (52) permanent generators at fifty-two (52) different lift stations with capacities listed in the table below or the adequate size determined by the vendor and/or an electrical engineer during the bid process to appropriately support the critical infrastructure. The project includes constructing of an equipment pad, installing an automatic transfer switch (ATS), a supply diesel tank, and electrical connections with each generator. Currently, this infrastructure is unprotected without any source of backup power during power outages. An interruption in the electric power supply would result in a loss of service and sewer overflow affecting the community. The project shall decrease the risk of electrical power loss to the lift stations and shall allow the city to maintain the lift station operational during future power outages. The generator(s) shall be protected against a 500-year flood event by implementing specific activities or by locating the generator(s) outside the Special Flood Hazard Area (SFHA), comply with applicable National Flood Insurance Program (NFIP) requirements and shall be protected against wind with a rated enclosure and appropriate anchoring based on its location requirements per ASCE 7 standards. The selected sites shall provide sufficient space to maintain and fuel the generator(s) and shall comply with the National Electrical Code working clearance requirements. Activities shall be completed in strict compliance with Federal, State, and Local applicable Rules and Regulations.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS