Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Deltona

Awarded
H1222State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under solicitation number H1222, the City of Deltona has entered into a Hazard Mitigation Grant Program agreement with the Florida Division of Emergency Management to enhance the resilience of the City Hall and Emergency Operations Center located at 2345 Providence Boulevard, Deltona, Florida. The project involves the removal of an existing 350-kW generator and its associated fuel tank and switching gear to make way for a new, larger system. The scope of work includes the installation, connection, and testing of a 900-kW permanent diesel generator system, or a size determined appropriate by an electrical engineer, along with a new concrete pad, a 2,000-gallon diesel fuel tank, and automatic transfer switching gear. This upgrade is designed to expand backup power capabilities from only the 9,000 square foot Emergency Operations Center to the entire 47,000 square foot building, ensuring that offices and rest areas remain operational for emergency personnel during and after severe weather events. The total award for this project is 720,625.00 dollars, with a performance period spanning from September 13, 2023, to January 31, 2028.

General Info

City of Deltona upgrading City Hall generator system for 720,625.00 dollars by 2028.

Contract Value

$720,625

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

January 31, 2028

Documents

1
PDF, Low prioritycontract-document
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program (HMGP) project, the Sub-Recipient shall provide backup power to the City Hall/Emergency Operations Center, located at 2345 Providence Boulevard, Deltona, Florida 32725. The HMGP project shall provide protection to this critical facility by installing, connecting, and testing a 900-kW permanent diesel generator system, or of an adequate size determined by the vendor and/or electrical engineer during the bid process to appropriately support the City Hall/EOC, including a new concrete pad, 2,000-gallon diesel fuel tank, and automatic transfer switching gear in the same location. The project also includes removing the existing 350-kW generator, 1,225-gallon diesel sub-base fuel tank, and switching gear located within the open-air concrete enclosure in the southern portion of the Deltona City Hall property. The City Commission chamber located within Deltona City Hall serves as the Emergency Operations Center (EOC) during a declared emergency. This 9,000 SF EOC houses only the on-shift operations for the group; the remainder of the 47,000 SF building, including offices and conference rooms, serves as off-shift quarters and rest areas for emergency response personnel. However, the existing generator only provides backup power to the EOC. The remainder of the building lacks necessary backup power should electrical outages occur. The proposed replacement generator shall mitigate the power loss and keep the entire Deltona City Hall building operational during and after severe weather events, providing emergency personnel with a safe place to work while on duty and rest while off duty.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS