City of Jackson Water Tank Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Jackson Water Tank Replacement Project involves the replacement of the antiquated 1.3-million-gallon Martell Reservoir/Clearwell in Jackson, California, which no longer meets current design standards. The project will install two new 1.3-million-gallon water storage tanks along with new inlet and outlet piping connected to existing fill and distribution lines. While the existing reservoir and water treatment plant equipment will be demolished or salvaged, the existing building will be preserved for non-water system operations, and a new building will be constructed specifically for water system operations near the new tanks. Additional site work includes re-grading the land and access roads to accommodate large vehicles and implementing valve replacements to improve drainage. The project is being managed under CEQA guidelines, with a Mitigated Negative Declaration and Initial Study identifying potential impacts on biological, cultural, paleontological, noise, and tribal cultural resources. Mitigation measures have been established to reduce these impacts to less than significant. The public review period for these environmental documents ran from August 28, 2026, to September 28, 2026. Primary points of contact for the project include Assistant Public Works Superintendent Trevor Haass and consultant Amberly Morgan.

General Info

City of Jackson replaces one reservoir with two tanks and new operations building.

Agency

California → City of Jackson

Place of Performance

Kennedy Mine Road, Jackson, CA, 95642

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Jackson
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Jackson
Office AddressN/A
Contacts
Trevor HaassAssistant Public Works Superintendent
Amberly MorganConsultant

Interested Companies (1)

ECORP ConsultingRedlands, CA

Full Description

Show more
The Project proposes to replace the Martell water storage reservoir (Martell Reservoir/Clearwell). The 1.3-million-gallon Martell Reservoir/Clearwell was built in the 1970s and is antiquated infrastructure that no longer meets current design standards and is in a state of disrepair. The reservoir will be replaced with two (1.3 million gallon) water storage tanks and new inlet and outlet piping will be installed to and from the new tanks and connect to existing fill and distribution pipes. All equipment from the water treatment plant will be demolished or salvaged as part of the Project. The existing building will be protected in place for continued use by the City for non-water system operations. A new building will be constructed for water system operations near the new tanks. The existing reservoir will be demolished to make room for the new tanks. The site will be re-graded to accommodate the new tanks and portions of the access road will be re-graded to improve site access for large vehicles. Grading improvements and valve replacements will be completed to improve site drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction, Inc. is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project, solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. The response deadline for interested subcontractors to provide quotations for labor, materials, and services is December 4, 2026. The scope of work involves comprehensive sewer installation and site development in Virginia. Key technical requirements include the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe in 18 and 24 inch diameters, as well as the construction of standard and doghouse manholes and interior drop assemblies. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, CSO regulator fit out, and the maintenance of flows and bypass during construction. Site work requirements encompass the clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Additionally, the project requires geotechnical instrumentation and monitoring and specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, generator, odor control equipment, and associated mechanical and electrical systems, as well as the demolition of existing pumps and piping. Additional site work includes stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on price, bidder qualifications, and compliance with project requirements. Bidders must provide a bid bond, evidence of authority to sign, and MWBE documentation. The project has a substantial completion timeline of 560 calendar days following the Notice to Proceed. Contract administration is managed by Willis Engineers, and payments are due thirty days after the presentation of an Application for Payment. The work must adhere to strict technical standards, including AWS D1.2 for welding, NEMA standards for motors, and specific packaging and storage requirements for materials.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester, Virginia, has issued solicitation ITB-2026141 for the Jefferson Street Pump Station Replacement. The project involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. The scope also includes the demolition of existing facilities and the relocation of a fuel tank. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, and must be submitted exclusively through the City's e-Procurement Portal. Requirements for bidders include registration in the Commonwealth of Virginia, a bid guarantee of 5 percent of the bid, and the submission of a Quality Management Plan, a Timeliness Tracking Plan, and at least three similar project references. The project is subject to the Davis-Bacon Act, American Iron and Steel requirements, and VDOT 2020 Road and Bridge Specifications. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an Invitation to Bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project seeks quotes from subcontractors and suppliers for various scopes of work, including electrical, paving, pipe supply, and aggregate supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax, with a final response deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Additionally, the prime contractor reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with bond premium reimbursements available up to 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement