City of Jackson Water Tank Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Jackson Water Tank Replacement Project involves replacing the antiquated 1.3-million-gallon Martell Reservoir/Clearwell with two new 1.3-million-gallon water storage tanks. The scope of work includes installing new inlet and outlet piping to connect with existing fill and distribution systems, demolishing the old reservoir, and constructing a new building for water system operations. While the existing building will be preserved for non-water system operations, all related water treatment plant equipment will be demolished or salvaged. To support the new infrastructure, the project includes site re-grading to accommodate the tanks and improve access roads for large vehicles. Additionally, valve replacements and grading improvements will be implemented to enhance site drainage. This project is managed by the City of Jackson in California, with primary coordination handled by the Assistant Public Works Superintendent and an external consultant.

General Info

City of Jackson replaces one reservoir with two tanks and new operations building.

Agency

California → City of Jackson

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Kennedy Mine Road, Jackson, CA, 95642

Set-Aside

NONE

Documents

(4)

ISMND-NOI(Stamped-Filed)

PDF

Jackson Water Tank Replacement_Draft_8_7_26

PDF

20260417-Summary_Form_Flattened

PDF

20210820-NOC_flattened

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Jackson
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Jackson
Office AddressN/A
Contacts
Trevor HaassAssistant Public Works Superintendent
Amberly MorganConsultant

Interested Companies (1)

Show more
ECORP Consulting
Rocklin, CA

Full Description

Show more
The Project proposes to replace the Martell water storage reservoir (Martell Reservoir/Clearwell). The 1.3-million-gallon Martell Reservoir/Clearwell was built in the 1970s and is antiquated infrastructure that no longer meets current design standards and is in a state of disrepair. The reservoir will be replaced with two (1.3 million gallon) water storage tanks and new inlet and outlet piping will be installed to and from the new tanks and connect to existing fill and distribution pipes. All equipment from the water treatment plant will be demolished or salvaged as part of the Project. The existing building will be protected in place for continued use by the City for non-water system operations. A new building will be constructed for water system operations near the new tanks. The existing reservoir will be demolished to make room for the new tanks. The site will be re-graded to accommodate the new tanks and portions of the access road will be re-graded to improve site access for large vehicles. Grading improvements and valve replacements will be completed to improve site drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins with diameters of 54 and 145.5 inches. Additional structural requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The technical execution of the project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details