Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

City of League City - Landing Blvd. Lift Station Rehab WW1901F

Active
6ac3d9d6f701d3d06244650aState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of League City is seeking a contractor for the Landing Blvd. Lift Station Rehabilitation project. The scope of work involves the comprehensive overhaul of the existing lift station wet well, which includes replacing pumps and discharge piping, installing a new access hatch with a safety grate, and applying a new epoxy coating. Electrical upgrades are required, including the relocation of components and the installation of a SCADA panel, pump control panel, auto-sensory controls, floats, and terminal boxes. Additionally, the project requires filling in the existing dry pump valve box, placing aboveground valves, and providing a quick connect for vacuum trucks. To facilitate these improvements, the contractor must implement a bypass pump system to keep the station operational while out of service. Site improvements include the demolition and replacement of concrete paving, the construction of a new drive approach, and the installation of a sidewalk to connect existing paths from north to south. The project also encompasses site fencing, paving, and the strict implementation of Storm Water Pollution Prevention Measures to ensure environmental compliance. Responses for this solicitation are due by November 3, 2026.

General Info

League City seeks a contractor for Landing Blvd Lift Station rehabilitation by November 3, 2026.

Place of Performance

League City, TX, 77573, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of League City
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of League City
Office AddressN/A

Full Description

Show more
This project consists of the rehabilitation of an existing lift station wet well, including the replacement of pumps and discharge piping; new access hatch with safety grate; electrical components relocation and improvements; installation of SCADA panel, pump control panel, auto-sensory controls, floats and terminal boxes; filling in the existing dry well; improvements to driveway access to the lift station site; site fencing and paving; along with all related subsidiary and incidental components as shown in the Project Plan Set and contract documents. Storm Water Pollution Prevention Measures (SWPPP) shall be implemented throughout the construction to maintain compliance with applicable environmental and permit requirements. This project consists of temporarily taking Landing Blvd. Lift Station out of service and installing a by-pass pump around to enable the lift station to be rehabilitated. A new epoxy coating on the wet well along with filling in the dry pump valve box and placing aboveground valves and quick connect for vacuum truck. Existing concrete paving will be demolished and replaced with new concrete, new concrete drive approach, and new sidewalk to connect existing sidewalk from the north to the existing sidewalk to the south.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS