This Solicitation opportunity from Florida was posted on September 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
City of Marco Island Pressure Washing and Window Cleaning of Exterior Facilities
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Marco Island is seeking a contractor to perform exterior pressure washing and window cleaning at twelve of its general government facilities located throughout Florida. The primary goal is to remove salt water, debris, grime, mildew, and bugs resulting from Hurricane Helene, which can cause deterioration of the buildings. The facilities vary in size, with the largest being City Hall at over 12,000 square feet and others ranging from approximately 850 to 17,466 square feet. The scope of work includes supplying all necessary materials and labor, carefully cleaning exterior surfaces with appropriate pressure levels to prevent damage, and ensuring that all exterior outlets, furniture, and delicate items are protected or removed prior to cleaning. Additionally, the contractor must remove and clean screens on windows, schedule services in coordination with the Fleet and Facilities Coordinator, and perform all work on weekends to avoid disrupting normal operations. Waste removal and site cleanup are also required, with any damages caused during the process to be rectified at the contractor’s expense. The contract, identified under solicitation number 2004750, is valued between $50,000 and $150,000 and is open for responses until October 4, 2024. It is a solicitation issued by the City of Marco Island, part of the Florida state government, with a focus on maintaining the integrity and appearance of public facilities through professional exterior cleaning services. The contractor must ensure safety, proper scheduling, and thorough cleanup at each site, adhering to the specified scope and safety precautions to prevent damage and ensure a tidy, damage-free completion of the work.
General Info
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Joliet Job Corps-Request for Winter ServicesOpen now, due in 3 days
- Rain Gutter and Downspout Cleaning & InspectionOpen now, due in 6 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
It is recommended to visit each location to determine capability and water access before providing a cost estimate.
Scope of work:
• The contractor shall supply all materials and labor to complete the work. • The contractor shall pressure wash the exterior facility to rid it of salt water, debris, grime, mildew, and bugs. • The scope does not include sidewalks, garbage enclosures, or other structures outside of the building. • Windows are to be cleaned to remove dirt, stains, and mineral deposits. • The contractor shall consider different pressures depending on the surface being clean to not damage building structures. • Each site is to have all exterior outlets, furniture, or delicate items protected or moved out of the way of cleaning to prevent damage. • Any or all screens on the exterior facility are to be removed by the contractor prior to pressure washing to prevent damage. Before reinstalling the windows, the contractor is to clean the screens of dried salt water, debris, and dust. • The contractor is to schedule services with the Fleet and Facilities Coordinator before starting, as many facilities are public-facing. • Service is requested to be performed on the weekends only, not to disrupt business operations. • Each site shall always remain tidy and clean. • All waste materials are to be taken from the site and disposed of by the Contractor at each project closeout. • The Contractor (or his subcontractors) will rectify any damage before completing the scope of work at the Contractor’s expense.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
