Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Mount Dora, Donnelly Street Stabilization, Erosion

Awarded
H1199State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Mount Dora has been awarded a contract through the Executive Office of the Governor for the Donnelly Street Stabilization and Erosion Control Phase II project under the Hazard Mitigation Grant Program. With a total award amount of 1,255,802.16 dollars, the project is scheduled for performance between January 27, 2025, and January 31, 2027. The primary objective is to protect North Donnelly Street, specifically the section between Woodbury Avenue and Old Eustis Road, from subsidence and slippage failure caused by excessive erosion during storm events. The scope of work involves strengthening the embankment by reconstructing it at a 2:1 slope and installing a concrete gravity wall to address significant longitudinal cracking in the roadway. Drainage enhancements include the installation of five flume curb inlets and approximately 100 linear feet of 18-inch PVC piping to prevent water from overtopping the curb. Additional improvements consist of replacing 1,100 linear feet of sidewalk, constructing new curb and gutter, installing handrails, and restoring road pavement. All construction must be designed to withstand a 25-year storm event and comply with all applicable federal, state, and local rules and regulations.

General Info

Mount Dora receives $1,255,802.16 for Donnelly Street erosion control and stabilization through 2027.

Contract Value

$1,255,802.16

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Contract End Date

January 31, 2027

Documents

1
PDF, Low priorityaward
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program project, the Sub-Recipient proposes erosion control improvements to mitigate North Donnelly Street located in Mount Dora, Florida 32757, specifically, between Woodbury Avenue and Old Eustis Road. The HMGP Phase II – Construction scope of work shall protect North Donnelly Street from erosion by strengthening the embankment against a subsidence or slippage failure due to excessive loss of support during storm events. The project shall include the improvement of the eroded sections of the embankment, including the reconstruction of the earthen embankment at a 2:1 slope, and drainage improvements to reduce risk of continued erosion due to water overtopping the curb. Drainage improvements include the construction of 5 flume curb inlets and approximately 100 linear feet of 18-inch Polyvinyl chloride (PVC) piping. Additionally, the project shall include necessary road pavement restoration, replacement of approximately 1,100 linear feet of sidewalk, concrete gravity wall installation, curb and gutter construction, and handrails. Currently, North Donnelly Street presents significant longitudinal cracking on different sections of the road due to the substantial erosion to the embankment. The project shall substantially reduce the risk of failure of the embankment and road. The project shall be constructed to provide protection against a 25-year storm event. Activities shall be completed in strict compliance with Federal, State and Local applicable Rules and Regulations.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS