Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Florida was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Port Orange

Awarded
H1301State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under solicitation number H1301, the Executive Office of the Governor of Florida and the Florida Division of Emergency Management have awarded a grant of 160,473.60 dollars to the City of Port Orange for a Hazard Mitigation Grant Program project. The project focuses on the mitigation reconstruction of a flood-prone property located at 21 Cypress In The Wood, Port Orange, Florida. This initiative was prompted by a Substantial Damage Determination following Hurricane Ian, as a structural assessment found the existing 1,248 square foot manufactured home built in 1977 to be ineligible for lifting and unsafe for occupancy. The scope of work involves the demolition of the existing structure and the installation of a new manufactured home elevated on concrete piers. To mitigate future risks from tidal surge and rainfall runoff, the new dwelling, including all equipment and utilities, must be elevated to a minimum Design Flood Elevation of 29.4 feet NAVD88, which is 2 feet above the Base Flood Elevation for Zone AE. The project includes the construction of accessible ramps for mobility devices, proper disposal of debris and hazardous materials, and full site restoration to ensure the residence is safe for human habitation. The performance period for this agreement runs from October 3, 2023, through January 31, 2028.

General Info

Florida grants Port Orange $160,473.60 to reconstruct a flood-prone home after Hurricane Ian.

Contract Value

$160,473.6

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

1
PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Executive Office Of The Governor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
As a Hazard Mitigation Grant Program project, the Sub-Recipient proposes mitigation reconstruction of property located at 21 Cypress In The Wood, Port Orange, Florida 32129. The HMGP proposed project scope of work for mitigation reconstruction of this flood-prone property shall include demolition of the existing structure, installation of a new manufactured home, and elevation of the new dwelling to a minimum of 2 feet above the Base Flood Elevation (BFE + 2'). According to the FIRM, the property is within Zone AE which has a Base Flood Elevation of 27.4 feet NAVD88. The new dwelling shall be elevated on concrete piers to a proposed minimum Design Flood Elevation of 29.4 feet NAVD88 consistent with the Freeboard Value Approach. Equipment and utilities shall also be elevated to the required height. Appropriate means of access shall be constructed including ramps where needed to allow the homeowner to navigate the elevated structure using assisted mobility devices. Debris and hazardous materials shall be properly disposed, the site shall be restored, and the new residence shall be made safe for human habitation with utilities and equipment reconnected. The property bordered by the Atlantic Ocean, the Halifax River, and smaller waterways-continues to be at risk of inundation due to tidal surge and rainfall runoff. A structural assessment of the existing residence concluded that the wood frame, manufactured unit built in 1977 on a concrete pier foundation with a total living area of 1,248 square feet is ineligible for lifting and a danger to occupancy due to past storm damage. The extent of structural damage caused by Hurricane Ian prompted the city to issue a Substantial Damage Determination. The project shall prevent future structural damage and eliminate substantial repair and displacement costs.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS