Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City of Portola Water Distribution System and Wastewater Collection System Improvements Projects

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Portola Water Distribution System and Wastewater Collection System Improvements Projects aim to modernize aging infrastructure to resolve critical failures in the city's water and wastewater networks. The wastewater system currently suffers from excessive inflow and infiltration, leading to manhole surcharges, spills, and state discharge violations. Simultaneously, the water distribution system is undersized and prone to leaks and breakages, which limits fire flow capacity and poses health risks due to the proximity of waterlines to sewer pipes. The project will replace aging steel and asbestos cement water mains with approximately 4,780 linear feet of 8-inch PVC and 5,050 linear feet of 6-inch PVC piping, along with 12 new fire hydrants, 107 gate valves, and 160 water service reconnections. Wastewater improvements, which may be completed in two phases based on funding, include replacing approximately 21,370 feet of 8-inch piping, 22,950 feet of 4-inch laterals with two-way cleanouts, and various lengths of 10, 12, and 15-inch piping. The scope also involves replacing 36 manholes and rehabilitating 110 others. Most work will occur within public road rights-of-way and utility easements in Portola, California. The project is categorically exempt under CEQA Guidelines and requires compliance with the State's In-Use Off-Road Diesel-Fueled Fleets Regulation. Contractors must also adhere to strict dust control measures, including speed limits on unpaved roads and regular street sweeping to remove silt and mud.

General Info

City of Portola to upgrade water and wastewater systems with pipe replacements, new hydrants, manholes, and valve installations within existing rights-of-way.

Agency

California → City of Portola

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Various, Portola, CA, 96122

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Portola Water and Sewer Improvements

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Portola
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Portola
Office AddressN/A
Contacts

Full Description

Show more
The proposed project addresses improvements to the City’s water and wastewater infrastructure. Due to the age and condition of the City’s wastewater collection system, the City is experiencing excessive amounts of inflow and infiltration (I&I) entering the wastewater system during wet-weather periods. The I&I is causing manholes to surcharge, wastewater spills, and the need for emergency pumping. In turn, the City has received multiple discharge violations from the State Water Resources Control Board. The City’s water distribution system is also old and undersized, causing the City to incur losses due to leaks and frequent breakages. The small size of existing waterlines limits maximum fire flows within parts of the City. In addition, the waterlines are located in close proximity to existing wastewater collection pipelines, potentially creating serious health risks to residents due to potential contamination. Any construction and/or rehabilitation to the City’s sewer infrastructure would most likely damage existing water distribution pipelines. The proposed project would replace aging infrastructure, reduce leaks, and provide improved fire flows for the water system, and replace aging sewer infrastructure to reduce I&I for the wastewater system. Proposed water system improvements include installing ~4,780 linear feet of new 8-inch polyvinyl chloride (PVC) water mains, ~5,050 linear feet of new 6-inch PVC piping, ~12 new fire hydrants, ~107 mainline gate valves, and reconnecting 160 water service connections to the new water mains. The existing pipes would be abandoned in place. Proposed wastewater system improvements include replacing ~1,930 feet of 15-inch piping, ~480 feet of 12-inch piping, ~150 feet of 10-inch piping, ~21,370 feet of 8-inch piping, ~22,950 feet of 4-inch laterals, including two-way cleanouts at property lines, and ~36 manholes and rehabilitate ~110 manholes. Nearly all improvements would occur in existing public road ROWs and public utility easements. Sewer and water laterals would generally be extended to private property lines. Improvements would occur in existing public road ROWs and public utility easements. Sewer and water laterals would generally be extended to private property lines. Minimal vegetation and tree removal may be required to accommodate some of the improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS