City of Social Circle Little River Water Pollution Control Plant
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Social Circle is soliciting bids for two major infrastructure projects under solicitation number PE-66276-NONST-2027-000000027. The first contract involves the installation of approximately 3,600 linear feet of ductile iron and PVC sewer lines along with associated manholes, jack and bore operations, rock excavation, site clearing, and comprehensive soil erosion and sediment control measures, with a construction period of 270 consecutive calendar days. The second contract is for the construction of the Little River Water Pollution Control Plant, encompassing a full suite of wastewater treatment facilities including screen and grit structures, two aeration basins, two final clarifiers, tertiary filters, an ultraviolet disinfection unit, sludge and plant pump stations, chemical feed systems, a control building, a digester, and a sludge dewatering building, all equipped with necessary appurtenances; this project allows 480 consecutive calendar days for construction and an additional 60 days for final completion, totaling 540 days. Both projects are located in Georgia and require full compliance with all applicable standards and regulations. Proposals must be submitted by September 17, 2026, with inquiries directed to Alicia Addenbrook at the provided contact information.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances. Time allotted for construction is 480 consecutive calendar days and 540 days for final completion.
Similar Contracts
Same NAICS industry code
