Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City Seal Removal, Stabilization, Assessment & Restoration

Active
2026-REQ-008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Ellsworth is soliciting proposals from qualified historic preservation contractors and conservation firms for the phased removal, stabilization, assessment, and restoration of the 91-year-old hand-carved wooden City Hall Seal Pediment. Solicitation 2026-REQ-008, posted on September 23, 2026, with a response deadline of November 27, 2026, requires all work to be performed in accordance with the Secretary of the Interior's Standards for the Treatment of Historic Properties and accepted standards for the preservation of historic wood. The project is managed by the Facilities department, with Roddy Ehrlenbach serving as the primary point of contact. The project is structured in two principal phases, beginning with Phase 1, which focuses on the safe removal of the Seal from the City Hall gable. This initial phase includes pre-removal inspection, the development of a rigging plan, site protection, controlled disassembly, and the identification and mapping of all components. The contractor must transport the Seal to a secure, climate-monitored environment for gradual moisture equilibration and professional condition assessment. A comprehensive Condition and Assessment Report must be produced to provide recommendations and specifications for Phase 2 conservation and restoration. No permanent alterations or repairs are permitted during Phase 1 without written authorization from the City. Final reinstallation must utilize appropriate materials and anchoring systems to ensure long-term preservation.

General Info

Ellsworth seeks contractors to remove, assess, and restore the historic City Hall Seal.

Agency

Maine → FacilitiesView Agency

NAICS

811420 - Reupholstery and Furniture RepairView NAICS

Place of Performance

ME, USA

Set-Aside

NONE

Documents

(1)

City of Ellsworth City Hall Seal Restoration RFP

DOCXrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaine → Facilities
Contacts1 person available
OfficeEllsworth, ME, 04605, USA
Organization / Agency
Maine → Facilities
View Agency Profile
Office AddressEllsworth, ME, 04605, USA
Contacts
Roddy EhrlenbachDirector -- Parks, Recreation & Facilities

Full Description

Show more
The City anticipates that the project will proceed in two principal phases. Phase 1 – Assessment, Documentation, Removal, Stabilization and Temporary Storage Phase 1 includes all work necessary to safely remove the Seal from City Hall, document its condition and components, transport it to an appropriate facility, and stabilize it for professional assessment and conservation planning. Phase 1 shall include, at a minimum: Pre-removal inspection and documentation; Development of a detailed removal and rigging plan; Site preparation and protection; Temporary weather protection of the City Hall gable opening; Controlled disassembly and removal; Identification and mapping of all components; Documentation and preservation of loose or detached fragments; Custom protective crating; Transportation; Climate-monitored storage and controlled drying; Professional condition assessment; Preparation of a comprehensive Condition & Assessment Report; and Recommendations and specifications for Phase 2 conservation and restoration. No permanent alteration, repair, restoration, or reinstallation shall occur under Phase 1 unless specifically authorized in writing by the City and approved through the applicable preservation review process. The source project plan specifically contemplates that the Seal be removed and stabilized first, followed by a second review and approval process based upon the actual condition of the wood once it has been removed and dried.

Similar Contracts

Same NAICS industry code

More opportunities from Maine → Facilities

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS