Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Citywide Full Trash Capture Device Installation Project

Closed
25-11State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

Documents

2

City of Union City Project 25-11 Notice to Contractors

PDF, High priority: read this firstifb
High

Citywide Full Trash Capture Device Installation Project 25-11 Specification

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Union City
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Sealed proposals for the work shown on the plans entitled:  CITYWIDE FULL TRASH CAPTURE DEVICE INSTALLATION PROJECT, CITY PROJECT NO. 25-11, will be received at the office of the City Clerk of the City of Union City, City Government Building, 34009 Alvarado-Niles Road, Union City, California, until Monday, March 10th, 2025, 2:00PM PST, at which time they will be publicly opened and read in the Council Chambers of said building.  The engineer’s estimate for this project is $310,000. General Work Description:  The project consists of installing United Stormwater connector pipe screen(CPS), or approved equivalent, full trash capture devices onto existing storm drain inlets through the city in the City of Union City, California. The Contractor shall furnish all materials, labor, equipment, tools, and required incidentals for the procurement and installation of CPS full trash capture devices. These full trash capture devices are used for filtration of stormwater runoff including dry weather flows and are installed within a manhole/storm drain inlet and mounted in front of the inlet’s outlet pipe.The successful bidder shall furnish a Payment Bond, a Performance Bond, and a Maintenance Bond.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS