Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Civil Engineering and Trail Design

Active
Grant

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil Engineering and Trail Design involves providing specialized engineering and design services for prime contractors working on CMAP greenway projects. The scope of work includes conducting Phase I engineering, performing site surveys, and developing conceptual alignments to ensure all designs comply with the Regional Greenways and Trails Plan and ON TO 2050 standards. The successful contractor will be responsible for delivering comprehensive engineering reports, detailed blueprints, and construction documents that are ready for permitting. Managed by the Illinois Department of Transportation under NAICS code 541330, this opportunity was posted on October 19, 2026. Interested parties must submit their responses by the deadline of December 18, 2026.

General Info

Civil engineering and trail design services for CMAP greenway projects due December 18, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of TASA-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Transportation Alternatives Program - Metropolitan Planning Organization +200,000 population selected

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Department Of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs engineering and design services for prime contractors on CMAP greenway projects. Conducts Phase I engineering, site surveys, and conceptual alignment to ensure designs align with the Regional Greenways and Trails Plan (RGTP) and ON TO 2050 standards. Delivers engineering reports, blueprints, and permit-ready construction documents.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 8 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
Federal
RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)
Solicitation # FA9101269ANSEL
The Advanced Navigation Simulation Environment Laboratory (ANSEL) project is a solicitation for the design, procurement, and delivery of a state-of-the-art simulation system to modernize Position, Navigation, and Timing (PNT) and Navigation Warfare (NAVWAR) capabilities at the Holloman AFB PNT Simulation Laboratory. Issued under 10 U.S.C. Section 4022 Other Transaction Authority (OTA), the effort focuses on establishing a rigorous verification and validation (V&V) and cyber direct-inject test capability. The system must support extreme dynamic conditions, including 6-DoF trajectory models with speeds up to Mach 20, 50g acceleration, and 200 g/s jerk, while providing phase-coherent, multi-channel RF simulation for mGNSS, alternative RF (XONA/STL), and jamming or spoofing environments. The acquisition is structured around eight milestones, with Base Milestones 1, 2, and 4 requiring Firm-Fixed Pricing and the remaining milestones utilizing Rough Order of Magnitude (ROM) estimates. Key deliverables include a fully integrated Operational Utility Prototype housed in 19-inch racks, comprehensive design documentation, and all technical data delivered with Unlimited Data Rights. Evaluation is a three-step process focusing on compliance, technical capability—specifically in RF phase calibration and signal integrity—and cost realism. Applicants must provide CMMC Level 2 self-certification and adhere to strict Controlled Unclassified Information (CUI) management protocols. Submissions are due by November 12, 2026, via SAM.gov.
FA9101 Aedc Pkp Procrmnt Branch

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
SLED
Request for Qualifications (RFQ) No. 27-001 Design & Engineering Services for Pine Street Extension
Solicitation # 27-001RFQ
The City of Ocoee, Florida, is soliciting qualifications from licensed professional engineering and design firms for the Pine Street Extension project, spanning from Palm Drive to Prosperity Farms Road. The scope of work involves the reconstruction and extension of approximately 0.5 miles of roadway, including the design of stormwater and utility modifications, water and sewer installations, pedestrian crossings, specialized intersection treatments, and street lighting in coordination with Duke Energy. The selected firm will be responsible for deliverables through the 90 percent plans submittal and subsequent response to comments, ensuring the final output is sufficient for permitting, bidding, and construction. Compliance with Florida State law, the Consultants Competitive Negotiations Act, and various local and regional land development codes is required. The selection process is governed by the Consultants Competitive Negotiations Act, where an evaluation committee will recommend the top three ranked firms to the City Commission. The City will then attempt to negotiate an agreement with the top-ranked respondent. Submissions must be uploaded via the OpenGov e-Procurement platform by 2:00 p.m. local time on December 1, 2026. Qualification packages are limited to 50 pages, excluding required forms, and must be submitted separately from the cost proposal. Required documentation includes a variety of certifications, such as non-collusion affidavits, drug-free workplace certifications, and disclosures regarding scrutinized companies and foreign countries of concern. The successful consultant must maintain comprehensive insurance coverage, including a 1,000,000 dollar combined single limit per occurrence for general liability and 1,000,000 dollars for professional liability. All policies must be issued by companies with a Best Rating of A or better and a Financial Size Category of VII or better. The City is exempt from all insurance deductibles, which remain the responsibility of the consultant. Additional requirements include adherence to Florida WaterStar landscaping and irrigation standards and the provision of a detailed project timeline identifying all key milestones.
Development Services

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Illinois → Department Of Transportation

Same awarding agency

NAICS: 237310
New
Grant
Transportation Alternatives Program - Metropolitan Planning Organization +200,000 population selected
Solicitation # TASA-1
The Transportation Alternatives Program (TAP), specifically the TAP-L, is a federally funded capital grant program administered by the Illinois Department of Transportation and the Chicago Metropolitan Agency for Planning (CMAP). This solicitation, identified as TASA-1, seeks to fund bicycle and pedestrian projects that support non-motorized transportation and contribute to the completion of the Northeastern Illinois Greenways and Trails Plan (RGTP). The program has a total funding pool of 44,300,000 dollars, with individual awards ranging from a floor of 1,000,000 dollars to a ceiling of 44,300,000 dollars. An expected five awards will be granted to projects that align with the RGTP, improve the bicycle environment, connect population and employment centers, and promote inclusive growth. Applications must be submitted by December 18, 2026, at 5:00 PM CST. Bicycle facility projects are generally required to be featured in an approved planning document and have commenced phase I engineering, though exemptions are available for hardship communities. Applicants must possess a valid Unique Entity ID (UEI) from sam.gov and adhere to extensive federal and state compliance standards, including the Prevailing Wage Act, the Americans with Disabilities Act, and various environmental regulations such as the Clean Air Act. Cost sharing is required for these awards. Evaluation and ranking are conducted by the CMAQ, CRP, and TAP Project Selection Committee based on strategic alignment and planning status.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS