Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Civil/Trenching and Conduit Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil/Trenching and Conduit Work involves providing specialized excavation and installation services for City of Piqua substation projects. The selected contractor will be responsible for digging trenches and installing 2 inch and 4 inch PVC conduits in strict accordance with the provided Conduit Plan and Trench Details. The scope of work includes the use of excavators and trenching equipment, as well as the necessary backfilling and site restoration to deliver completed conduit runs. Safety and compliance are central to the agreement, with a mandatory requirement to adhere to all OSHA trenching regulations. This project falls under NAICS code 237990 and is managed through the City of Piqua in Ohio. Interested parties must submit their responses by the deadline of October 28, 2026.

General Info

Subcontract for City of Piqua substation trenching and conduit installation by October 28, 2026.

Documents

This scope was carved out of 24-17.9B.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

24-17.9B

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Piqua
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Piqua
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, trenching, and installation of PVC conduits for prime contractors on City of Piqua substation projects. Digs trenches and installs 2” and 4” PVC conduits per the Conduit Plan and Trench Details, including backfilling and site restoration. Uses excavators and trenching equipment. Adheres to OSHA trenching requirements. Delivers completed conduit runs and trenches.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 9 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 14 hours ago

DEADLINE

N/A
View Details

More opportunities from Ohio → City of Piqua

Same awarding agency

NAICS: 238110
New
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted in duplicate using the provided forms, accompanied by a bid bond or certified check for 10 percent of the total bid amount. The contract is governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Award selection will be based on the lowest and best bid, considering price, relative merits, and subcontractor qualifications. Contractors must comply with State of Ohio Prevailing Wage laws and provide a Drug Free Workplace Compliance Affidavit and ADA Compliance Certification. Performance and payment bonds equal to the contract price are required upon award. Technical requirements specify strict tolerances for pier center location, elevation, verticality, and anchor bolt alignment, with structures prohibited from erection until piers reach 75 percent of their design compressive strength. Payment is structured with 90 percent due upon delivery of equipment and the final 10 percent due upon system acceptance and energization.
Poured Concrete Foundation and Structure Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 332312
New
SLED
24-17.9C
Solicitation # 24-17.9C
Project 24-17.9C is a solicitation issued by the City of Piqua, Ohio, for the fabrication and furnishing of steel structures for the 69kV The Site Substation and the Washington Road 69kV Transmission Line. With an engineer's estimate of $680,000, the scope of work includes the delivery of a complete and operable system featuring deadend H-frame structures, Vee switch structures, bus supports, metering structures, station service transformer structures, grounding platforms, and various self-supporting steel poles ranging from 50 to 80 feet. All work must adhere to the National Electric Safety Code and specific technical load requirements for vertical, transverse, and longitudinal forces. Bidders must be actively engaged in the fabrication of such items and provide evidence of financial and performance capability. Submission requirements include a bid bond of 10% of the total bid amount, a contractor's qualification statement, and certifications for ADA and Drug-Free Workplace compliance. The successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Deliveries must be made to the job site, with structural steel shipped in a single lot or within 24 hours, and are subject to a performance penalty of $500 per calendar day for delays beyond the certified delivery date. Quality assurance involves manufacturer testing of bolts per ASTM A325 and visual inspection by AWS QC1 certified welding inspectors.
Fabricated Structural Metal Manufacturing

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 335314
New
SLED
24-17.9A
Solicitation # 24-17.9A
Project 24-17.9A is a solicitation by the City of Piqua, Ohio, for the design, fabrication, testing, and delivery of critical infrastructure for the 69/12.47 kV Site Substation. The scope of work is divided into two primary bid items: a prefabricated modular steel or concrete control building measuring 25'-4" x 14'-6" and four complete control and relaying panels, consisting of three protective relay panels and one communications panel. The engineer's estimate for the project is $425,000. Bids must be submitted in duplicate via Bid Express, email, or hard copy, and must include a bid bond or certified check for 10% of the total bid amount. The successful bidder will be required to provide a performance-payment bond for 100% of the contract value. The contract mandates strict adherence to technical standards, including IEEE C37.90 and the NESC National Electric Safety Code. Key deliverables include a Factory Acceptance Test (FAT) involving point-to-point wiring verification and functional logic tests prior to shipment. Equipment must be delivered to the job site in open-top conveyances, with a penalty of $500 per calendar day for late delivery. Payment is structured with 90% of the contract price due upon undamaged delivery and the remaining 10% payable upon satisfactory energizing and system acceptance. Compliance requirements include adhering to prevailing wage stipulations, the Americans with Disabilities Act, and Drug-Free Workplace certifications.
Relay and Industrial Control Manufacturing

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS