Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Carolina was posted on September 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Clarifier Drive and Sluice Gate Replacement

Closed
2026-IFB-006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This contract involves the replacement of an existing drive unit within a clarifier, as well as the replacement of a sluice gate located in the splitter box of the clarifier at the Port Royal Island Water Reclamation Facility. The Beaufort-Jasper Water & Sewer Authority (BJWSA), the project owner, has already procured the necessary replacement drive unit, which is stored onsite at the facility. The selected contractor will be responsible for installing this replacement drive, strictly adhering to the latest guidelines provided by the drive’s manufacturer. The opportunity, categorized under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), falls within an estimated contract value range of $50,000 to $150,000. The solicitation was posted on September 30, 2025, with proposals due by October 15, 2025. The work is to be completed in South Carolina, and is managed by BJWSA. The solicitation is open to qualified contractors who can demonstrate experience with the specified scope and regulatory compliance, particularly with the installation of mechanical components in water treatment environments.

General Info

Replace clarifier drive unit and sluice gate at Port Royal Water Facility, BJWSA manages.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Beaufort - Jasper Water & Sewer Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
Replacement of an existing drive unit in clarifier and a sluice gate located in the clarifier’s splitter box at the Port Royal Island Water Reclamation Facility. BJWSA has purchased the replacement drive for clarifier and it is located on site at the Port Royal Water Reclamation Facility. Contractor is responsible for installation of the drive following the manufacturer’s latest manual.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS