Clarksville Water Treatment Plant Expansion

Active
IFB-125931State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Clarksville Water Treatment Plant Expansion, solicitation IFB-125931, is a project managed by Mecklenburg County, Virginia, to increase the facility's capacity from 1 MGD to 2 MGD. The scope of work involves extensive infrastructure upgrades, including the replacement of raw water pumps, the construction of a pulsating sludge blanket flocculating clarifier, and the installation of multimedia filter units. The project also requires the demolition of existing sedimentation basins, chemical feed equipment, and portions of the treatment building, alongside the construction of a new clearwell, an equalization tank, and a sanitary sewer pump station. Additional site requirements include the installation of approximately 5100 linear feet of piping along roadways, various site improvements such as asphalt paving and fence relocation, and the programming of instrumentation and control systems. This solicitation was posted on August 7, 2026, with a response deadline of September 17, 2026. The project falls under NAICS code 237110 and is located in Clarksville, Virginia.

General Info

Expand Clarksville Water Plant from 1 to 2 MGD with new clarifier, filters, clearwell, piping, and automated controls.

Agency

Virginia → Mecklenburg CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Clarksville, VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Mecklenburg County
Contacts1 person available
OfficeN/A
Organization / Agency
Virginia → Mecklenburg County
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The Project includes the following Work: 1. Upgrade to the existing Town of Clarksville Water Treatment Plant to expand capacity from 1 MGD to 2 MGD. 2. Replacement of existing Raw Water Pumps and associated controls. 3. Construction of clarifier basin and installation of equipment associated with pulsating sludge blanket type flocculating clarifier. 4. Demolition of existing flocculation and sedimentation basins. 5. Removal of existing chemical feed equipment and filters. 6. Partial demolition of treatment building. 7. Expansion of existing treatment building and installation of multimedia filter units. 8. Construction of cast-in-place clearwell with finish water and backwash water pumping station above grade. 9. Construction of Equalization Tank, Sanitary Sewer Pump Station, and Forcemain. 10. Miscellaneous site improvements including but not limited to site piping, fence relocation, and asphalt paving. 11. Approximately 5100 LF of piping along roadways. 12. Modifications and programming of instrumentation and control systems.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Technical and environmental services are also required, including surveying, testing and inspections, settlement monitoring, videography, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage their participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis.
Filanc

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the overall commissioning and disinfection of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, DBE, and DVB. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services. Point of contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements encompass drainage improvements, electrical upgrades, instrumentation and controls, piping systems, excavation of cobbles and boulders, welding, disinfection, and surface restoration. This opportunity is designated as a small business set-aside, specifically welcoming SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. James W. Fowler Co. provides support for M/W/DBE subcontractors in securing bonding, insurance, lines of credit, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project also encourages the utilization of apprentices and requires quality control testing.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details