CLWA Groundwater Containment, Treatment, and Restoration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clarita Valley Water Agency is implementing the Groundwater Containment, Treatment, and Restoration Project in Santa Clarita, California. Addendum 2 of the 2005 Mitigated Negative Declaration focuses on the Saugus 3 and 4 Equipping and V206/V207 Groundwater Treatment Improvements. Key infrastructure modifications include the installation of a new well wastewater discharge pump-to-waste pipeline that parallels an existing 18-inch PVC line and terminates at a new engineered outfall on the Santa Clara River bank, involving limited work within state jurisdictional areas. The project also involves abandoning a small pipeline segment in the Magic Mountain parking lot. Additional technical upgrades include minor site improvements at Wells 206 and 207, featuring new pumps, motors, and variable frequency drive controllers, as well as improvements to ion exchange vessels with provisions for future expansion at Wells S3 and S4. The scope further encompasses permanent equipment for Saugus Wells 3 and 4, the construction of a chloramination facility, and the installation of dual 24-inch pipelines connecting the facility to the existing well site, along with connections to existing 20-inch and 30-inch transmission and distribution pipelines. Design services and purchase orders for these works have been authorized through Resolution SCV-519.

General Info

Agency

California → Santa Clarita Valley Water Agency

Place of Performance

Magic Mountain Parkway and Commerce Center Drive, Santa Clarita, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Clarita Valley Water Agency
Office AddressN/A
Contacts

Full Description

Show more
Addendum #2 evaluates the following modifications: New well wastewater discharge (pump-to-waste) pipeline generally paralleling the existing 18-inch PVC line and terminating at a new engineered outfall on the bank of the Santa Clara River; includes limited bank work at the outfall and short pipeline segment within state jurisdictional area. Minor well site improvements at Wells 206 and 207, including new pumps, motors, and variable frequency drive (VFD) controllers within existing paved areas (labels for Wells 206/207 to be corrected in project figures—Well 207 is the lower-left well; Well 206 is the upper well). Abandon in place a small perpendicular pipeline segment located within the Magic Mountain parking lot (blue line on prior figures). Saugus Wells #3 and #4 permanent equipment; chloramination facility; connections to existing 30-inch and 20-inch transmission/distribution pipelines; and dual 24-inch pipelines between the chloramination facility and existing well site. Minor site improvements for the ion exchange vessels for Wells 206 and 207 with integrated provisions for future ion exchange vessels for Wells S3 and S4.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Additional requirements include traffic control, SWPPP implementation, construction surveys, and preconstruction video services. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

24 minutes ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical infrastructure work for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and ancillary site improvements such as stormwater facilities, fencing, and a generator. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a performance period of 560 calendar days following the Notice to Proceed. Bidders must meet specific socioeconomic goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Required submittals include a signed bid form, bid bond, and evidence of authority to sign. The successful contractor must provide performance and payment bonds per EJCDC standards and proof of insurance. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

24 minutes ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. All subcontractors are strictly required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with Garney reimbursing the bond premium. Quotes, which must include the subcontractor's bond rate and any redlines to standard subcontract forms, are due by November 17, 2026, at 2:00 PM PT, ahead of the November 18, 2026, bid date. Requested supplies and services specifically include lead abatement, rebar, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and access hatches.
Garney Pacific, Inc.

POSTED

24 minutes ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS