CMP Drainage Pipe Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for CMP Drainage Pipe Installation involves providing specialized installation services for prime contractors on Henry County drainage projects. The scope of work includes the excavation and removal of existing pipes, followed by the installation of 36 inch and 42 inch corrugated metal pipes across three specific locations. The contractor is responsible for managing underground utility location, backfilling, and final site restoration using Graded Aggregate Base. All work must be performed in strict accordance with Georgia Department of Transportation specifications to ensure a fully functional drainage system. The project is categorized under NAICS code 237110 and is associated with the SPLOST agency in Georgia. Interested parties must submit their responses by the deadline of November 25, 2026.

General Info

Subcontract for CMP drainage pipe installation in Henry County, Georgia by November 25, 2026.

Documents

This scope was carved out of 27-22.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

(BID) 27-22,Drainage Improvements at Grove Pointe Subdivision

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → SPLOST
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → SPLOST
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs corrugated metal pipes (CMP) for prime contractors on Henry County drainage projects. Performs excavation, removal of existing pipes, and installation of 36” and 42” CMP. Manages underground utility location, backfilling, and site restoration using Graded Aggregate Base (GAB) as final topping. Work must adhere to Georgia Department of Transportation (GDOT) specifications. Delivers a functional drainage system at three locations.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Georgia → SPLOST

Same awarding agency

NAICS: 237110
New
SLED
(BID) 27-22,Drainage Improvements at Grove Pointe Subdivision
Solicitation # 27-22
Henry County is soliciting bids for drainage improvements at the Grove Pointe Subdivision under solicitation number 27-22. The project requires the contractor to provide all labor, materials, and equipment to install corrugated metal pipes at three specific locations on Grove Pointe Drive and Grove Pointe Way, with total quantities ranging from 60 to 88 linear feet per site. All work must comply with Georgia Department of Transportation specifications, and the contractor is responsible for underground utility location, material handling, and site restoration. A final compaction report from a GDOT pre-qualified firm is required for project acceptance. The contract will be awarded to the lowest responsive and responsible bidder. Evaluation is based on technical experience, financial capacity, business presence, and the ability to meet the delivery schedule. Bidders must submit their proposals via the OpenGov portal by 3:00 PM on November 25, 2026. Required documentation includes a bid bond of at least 5 percent of the total bid, a Covenant of Non-Discrimination, and compliance with the Georgia Security and Immigration Compliance Act. Additionally, there is a five percent subcontracting benchmark for certified M/WBE participants. The successful bidder must execute the contract and provide performance and payment bonds for 100 percent of the contract price within 15 calendar days of notification.
Water and Sewer Line and Related Structures Construction

POSTED

about 18 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS