Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

CNC Lathe

Awarded
W519TC26PA012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is for the procurement of a Nakamura-Tome WT300MMY-F014 CNC Turning Center with Live Tooling for the Department of Defense. The machine must feature dual 25 HP A2-8 spindles with 4-inch bar capacity, two 24-station BMT 65 turrets with direct drive motors, and a Fanuc F32iB CNC controller. Key technical specifications include positioning accuracy of less than .0002 inch, full closed-loop control for X, Y, and Z axes, and a maximum footprint of 18 by 18 feet. The agreement includes an extensive array of WTO rotary tools, ER collets, and specialized adapters, along with an LNS TurboChip conveyor and bar feeder. The contractor is responsible for overseeing equipment assembly, installation, startup, and performance testing. Additionally, the contractor must provide on-site orientation training and ensure all calibration and verification are completed prior to government acceptance.

General Info

Contract Value

$864,099

NAICS

333517 - Machine Tool Manufacturing

Place of Performance

McAlester, OK, 74501, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts1 person available
OfficeROCK ISLAND, IL, 61299-0000, USA
Office AddressROCK ISLAND, IL, 61299-0000, USA
Contacts

Full Description

Show more

LATHE
The only commercially available Turning Center with Live Tooling found to have all the Primary
and Secondary Requirements described below combined into one machine is the Nakamura – Tome 
WT300MMY-F014.


Primary Requirements for the CNC Turning Center with Live Tooling:
•  Tools driven by direct drive motors built into the turrets
•  25 HP A2-8 Spindle on both Right and Left
•  4” (102mm) Bar capacity on both spindles
•  Fully closed loop control for X, Y & Z axes on both turrets having direct scale (magnetic) 
feedback.



•
•  Fit within the maximum available area of 18 ft - 0 inches x 18 ft - 0 inches
•  Positioning accuracy of less than .0002 inch
•  Airbag Collision Protection (Nakamura Only)


Secondary Requirements for the CNC Turning Center With Live Tooling:



•  Basic Machine
o  2-turret specification (BMT 65)
•  Control
o  Human Machine Interface (HMI) Operating Terminal with 19.0" touch control display screen and 
Power failure Package.
o  Fanuc F32iB CNC controller software
o  Dual USB Ports
o  Maintenance + Alarm Trouble Shooting
o  Remote service capability
o  Machine data connector
o  Production package - high speed canned cycles
o  Ethernet
•  Screen Text
o  Screen display English
o  Language on operating system screen: English
o  Language on NC Screen: English
o  Language on PC Screen: English
•  Spindle
o  Left Spindle (Main Spindle)
■  Through-spindle hole dia. 102 mm
■  Bar stock machining capacity dia. 4”
■  Maximum spindle speed 2500 rev/ min
■  Output 30 min continuous 15/18 kW
■  Continuous Torque Rating (133 lb/ft)
■  12” Chuck for left spindle (main spindle)
■   Left spindle hollow cylinder set for 12-inch hollow chuck for bar diameter 4.0 in.
■  Full C-axis (CF-Control)
■  C-Axis Clamp Braking Torque (188 lb/ft)


■  Polar Coordinate Interpolation
■  Cylindrical Interpolation


o  Right Spindle (Sub Spindle)
■  Through-spindle hole dia. 102 mm
■  Bar stock machining capacity dia. 4”
■  Maximum spindle speed 2500 rev/ min
■  Output 30 min continuous 15/18 kW
■  Continuous Torque Rating (133 lb/ft)
■  12” Chuck for right spindle (sub spindle)
■   Left spindle hollow cylinder set for 12-inch hollow chuck for bar diameter 4.0 in.
■  Full C-axis (CF-Control)
■  C-Axis Clamp Braking Torque (188 lb/ft)
■  Polar Coordinate Interpolation
■  Cylindrical Interpolation


•  Turrets
o  Turret 1:
■  24 station BMT 65
■  12 Station Live Tool
■  Servo Drive Index
■  Y axis
■   Rotating Tool Spindle Speed 3600 rev/ min
■   Rotating tool 5.5/3.7 Kw – 7.5 HP
o  Turret 2:
■  24 station BMT 65
■  12 Station Live Tool
■  Servo Drive Index
■   Rotating Tool Spindle Speed 3600 rev/ min
■   Rotating Tool 5.5/3.7 Kw – 7.5 HP


•  Coolant Supply / Chip Removal
o  Water-Soluble coolant
o  Chip conveyor (right discharge)
■  Filtration Accuracy: 50 um approximately 90%
■  Carrying Amount
✓  Long Chip: 794 L/h
✓  Short Chip: 13 L/h
o  High pressure coolant system for two turret specifications
■  Chip Blaster F2-60
■  One pump for each turret (24 HP)
■  92.5 Gallon Tank
•  Measuring / Monitoring
o  Manual in-machine tool pre-setter (removable type, Left Spindle and Right Spindle)
o  Full closed loop control for X axis (turret 1) direct scale feedback, resolution 0.01 um
o  Full closed loop control for X axis (turret 2) direct scale feedback, resolution 0.01 um


o  Full closed loop control for Z axis (turret 1) direct scale feedback, resolution 0.01 um
o  Full closed loop control for Z axis (turret 2) direct scale feedback, resolution 0.01 um
o  Manual Machine tool presetter (Left Spindle side)
o  Manual Machine tool presetter (Right Spindle side)
•  Automation
o  Signal lamp 4 colors (red, yellow, green, blue)
o  1/F for exchanging control signals between the machine and peripheral equipment using 
EtherNet/IP
o  Interface for Bar feeder (EtherNet/lP Interface) with terminal block for power supply
•  Power Requirements
o  220 volts, 3 phase, 72 KVA
•  Control
o  High Speed Canned Cycle
o  Optional Block Skip (soft key type 2-9)
o  X axis movement direction compliant with ISO standard
•  Construction
o  Bar feeder
o  Spindle Liners 1pc for 1.00" RS
o  Coolant collector extension
•  Tools driven by direct drive motors built into the turrets
•  Fit within the maximum available areas of 18 ft - 0 in x 18 ft - 0 in
•  Positioning accuracy of less than .0002 inch
•  Special Construction
o Bar Feeder


Additional Parts / Products:


LNS TurboChip Conveyor Hinge Belt Type. Right Discharge LNS Quick Load Servo 105+ Barfeeder. ¼” to 
4-1/8”
LNS Quick Load Servo Barfeeder Installation
Steel Spindle Liners for Main Spindle 3/8” – 4” 91/4” Increments Qty 13) Steel Spindle Liners for 
Second Spindle 3/8” – 4” 91/4” Increments Qty 13) Samchully JB-M312 First Spindle
Samchully JB-M312 Second Spindle
High Pressure Coolant both turrets and spindle flush Chip Blaster F2-60


WTO Rotary Tools:



48-107658-HP - O.D. Cutting Holder - (4 ea.) 48-107660 – Combination Tool Holder - (4 ea.) 
48-100204 – Cut-off Holder - (2 ea.)
48-102279R – Cut-off Holder Right - (2 ea.) 48-102279l – Cut-off Holder Left - (2 ea.)
420132020 – Straight Drill/Milling Unit, ER32 QF, IC-EC - (4 ea.) 420132019-65 – Straight 
Drill/Milling Unit, ER32 QF, EC - (4 ea.) 420532026-65 – Face Mill/ Drill Unit, ER32 QF, IC-EC - (4 
ea.) 420532025-65 – Face Mill/ Drill Unit, ER32 QF, EC - (4 ea.)


410120030-65 – Straight Offset Drill/Milling Unit, ER32, EC - (4 ea.)
420532043-65 – Right Angle Drill/Milling Unit, Both Sides, ER32 QF, EC - (4 ea.) 410120031-65 – 
Straight Offset Drill/Milling Unit, ER32, IC-EC - (4 ea.) 410113002-65 – Straight Offset 
Drill/Milling Unit, ER20, EC - (4 ea.)
410120023-65 – Straight Offset Drill/Milling Unit, ER32, EC - (4 ea.) 410113003-65 – Straight 
Offset Drill/Milling Unit, ER20, IC-EC - (4 ea.) 420225014-65 – Right Angle Drill/Milling Unit, 
ER25, EC - (4 ea.) 420525015-65 – Right Angle Drill/Milling Unit, ER25 QF, IC-EC - (4 ea.) 
420532031-65 – Face Drill/Milling Unit, ER32 QF, EC - (4 ea.) 420532032-65 – Face Drill/Milling 
Unit, ER32 QF, IC-EC - (4 ea.) 411010000-65 – Adjustable Angle Drill/Milling Unit, ER16, EC - (2 
ea.)
411010001-65 – Adjustable Angle Drill/Milling Unit, ER16, IC-EC - (2 ea.) 411007001-65 – Adjustable 
Angle Drill/Milling Unit, ER11, EC - (2 ea.) 411007000-65 – Adjustable Angle Drill/Milling Unit, 
ER11, EC - (2 ea.) 411500001-65 – Offset Slitting Saw Unit, Type 14-2 - (2 ea.)
414532003-65 – Broaching Unit, TN765050 - (1 ea.)


Reduction Sleeve 1-1/2” (2 Sets)


2400150038 – 3/8”
2400150050 – 1/2”
2400150063 – 5/8”
2400150075 – 3/4”
2400150088 – 7/8”
2400150100 – 1.0”
2400150125 – 1-1/4”


ER 11 Collets (2 Sets)


190011000 – (.276-.020)


ER 16 Collets (2 Sets)



190016000 – (.394 -.020)


ER 20 Collets (2 Sets)


190020000 – (.512-.039)


ER 25 Collets (2 Sets)


190025000 – (.630-.039)


ER 32 Collets (2 Sets)



190032000 – (.787-.079)


ER 11 Collets Sealed (2 Sets)


191011013 – (.125)
191011019 – (.188)


191011025 – (.25)


ER 16 Collets Sealed (2 Sets)


191016013 – (.125)
191016019 – (.188)
191016025 – (.25)
191016031 – (.313)
191016038 – (.375)


ER 25 Collets Sealed (2 Sets)


191016013 – (.125)
191016019 – (.188)
191016025 – (.25)
191016031 – (.313)
191016038 – (.375)
191016044 – (.438)
191016050 – (.5)
191016056 – (.563)
191016063 – (.625)


ER 32 Collets Sealed (2 Sets)


191032013 – (.125)
191032019 – (.188)
191032025 – (.25)
191032031 – (.313)
191032038 – (.375)
191032044 – (.438)
191032050 – (.5)
191032056 – (.563)
191032063 – (.625)
191032075 – (.75)


Interchangeable Milling Arbors (2 Sets)


160015142 – (.625)
160019142 – (.75)
160023142 – (.875)
160025142 – (.1.0)


ER 25 QF Collet Chuck Adapter (2 Sets)


320025010 – (ER16)
320025013 – (ER20)
320025016 – (ER25)
ER 25 QF Collet Chuck Adapter Short (2 Sets)



320025010-07 – (ER16)


320025013-09 – (ER20)


ER 25 QF Collet Chuck Adapter Long (2 Sets)


320025007-40 – (ER11)
320025010-50 – (ER16)


ER 25 QF Weldon/Whistle Notch Shank Adapter (2 Sets)


3201250250 – (.25)
3201250312 – (.313)
3201250375 – (.375)
3201250500 – (.5)
3201250625 – (.625)
3201250750 – (.75)


ER 25 QF Combination Mill Adapter (2 Sets)



3202250750 – (.075)
3202251000 – (.1.0)
ER 25 QF Blank (5 ea.)



329025000


ER 25 QF Protection Cover (10 ea.)


337025000


ER 25 QF Master Gauge (1 ea.)


339125000


ER 32 QF Collet Chuck Adapter (2 Sets)



320032013 – (ER20)
320032016 – (ER25)
320032020 – (ER32)


ER 32 QF Collet Chuck Adapter Short (2 Sets)


320032013-07 – (ER20)
320032016-07 – (ER25)


ER 32 QF Collet Chuck Adapter Long (2 Sets)


320032007-50 – (ER11)
320032010-60 – (ER16)


ER 32 QF Weldon/Whistle Notch Shank Adapter (2 Sets)



3201320250 – (.25)
3201320312 – (.313)
3201320375 – (.375)
3201320500 – (.5)
3201320625 – (.625)
3201320750 – (.75)


ER 32 QF Combination Mill Adapter (2 Sets)


3202320750 – (.075)
3202321000 – (1.0)
3202321250 – (1.25)



ER 32 QF Blank (5 ea.)



329032000


ER 32 QF Protection Cover (10 ea.)


337032000


ER 32 QF Master Gauge (1 ea.)


339132000
One Hand Wrenches/Sets



0067732000 (5 ea.)
0067725001 (5 ea.)


00675000958 (5 ea.)
00675000591 (5 ea.)
00675000515 (5 ea.)
00675000902 (5 ea.)
00675000914 (5 ea.)
00675000448 (5 ea.)


Installation: Contractor shall provide personnel to oversee equipment assembly, installation, 
startup and test prior to equipment acceptance and commissioning.


Calibration/ Setup: Contractor personnel shall perform all calibration, verification and 
performance testing of the equipment after installation and demonstration of proper operation prior 
to Government customer providing acceptance.


Training: Contractor shall provide on-site orientation training for this equipment.


NOTES


•  FANUC Brand Drives and Control are a must to coincide with current programming and minimize 
training.
•  WTO live Tooling is the current brand we use in the shop.
 

Similar Contracts

Same NAICS industry code

NAICS: 333517
New
Federal
GTI VibePro Modernization Service
Solicitation # 80NSSC26943499Q
NASA Shared Services Center is seeking capability statements for GTI VibePro Modernization Services FY26 to align VibePro software with NASA information technology security requirements. The project is divided into two primary phases: Phase 1 focuses on Identity and Security Modernization by replacing legacy SiteMinder and LDAP authentication with an OAuth2/OIDC identity framework for web and iPad applications, while Phase 2 involves Java and Framework Modernization to bring the back-end application up to current technology standards. Key deliverables include a tested web application, updated iPad source code, an AWS Cognito proof-of-concept environment, and a final production build for the NASA deployment pipeline. The government intends to award a sole source contract to Setco Sales Co under the authority of FAR 12.102(a), as they have been determined to be the sole provider of these services. This procurement follows FAR Part 12 for commercial items and services, utilizing NAICS code 333517. Performance is slated for the NASA Marshall Space Flight Center in Huntsville, Alabama, with a period of performance of four weeks after receipt of order. Interested organizations must submit capability statements by 11:00 a.m. CST on October 23, 2026, for the purpose of determining if the procurement will be conducted on a competitive basis. Price quotes will not be accepted or reviewed at this time.
NASA Shared Services Center

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 541380
New
Federal
Granite Surface Plate Calibration and lapping - updated Docs
Solicitation # W519TC27QA007
Solicitation W519TC27QA007, issued by the Army Contracting Command - Rock Island, seeks an ISO 17025 accredited vendor to provide annual inspection, calibration, and lapping/repair of granite surface plates at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. This Firm Fixed Price contract consists of a base year running from February 2, 2027, to February 1, 2028, with four subsequent one-year option periods. All work must adhere to ASME B89.3.7 for flatness and ANSI Z-540-1 standards traceable to NIST. Key deliverables include the application of calibration stickers to each plate and the submission of a Service Acceptance Report within three business days of completion. To be considered, vendors must submit their proposals by November 9, 2026, including proposed fixed prices for all periods, documentation of technical capability, and a signed concurrence of the Scope of Work. Personnel requiring installation access must complete AT Level I awareness training and comply with strict security mandates, including CAC requirements and iWATCH briefings. Award evaluation is based on price and technical capability. Contract administration will be managed through the Wide Area WorkFlow system for invoicing, and performance will be monitored via a 100 percent inspection surveillance method as outlined in the Quality Assurance Surveillance Plan.
Testing Laboratories and Services

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541612
New
Federal
DRAFT RFPs – Human Resource Solutions, GEN VI IDIQ Contracts
Solicitation # W519TC-26-R-AHRS
The Army Contracting Command - Rock Island is seeking industry feedback on draft Requests for Proposals for the Sixth Generation (GEN VI) Human Resource Solutions multiple-award IDIQ contract suites. This procurement is divided into two primary components: Personnel Lifecycle Support (PLS) and Recruiting Management Administrative Support (RMAS). The PLS suite has a total estimated cumulative ceiling value of approximately 6.09 billion dollars, while the RMAS suite is estimated at approximately 1.52 billion dollars. Both contracts are structured as 10-year IDIQs, consisting of a five-year base period and a five-year option period. This is a 100 percent small business set-aside, with a minimum of 10 awards reserved specifically for small business offerors. The scope of work involves providing enterprise-level human resource knowledge-based services, training, manpower forecasting, and administrative support for the Department of Defense and other federal agencies. Evaluation for the base IDIQ awards will be based on acceptability factors, specifically Technical capability and Past Performance, with Corporate Experience being the most significant technical subfactor. Price will not be evaluated for the initial IDIQ award but will be used for subsequent task order awards. Proposals must be submitted electronically via the PIEE suite, and awardees will be required to maintain specific security clearances and adhere to strict quality control and reporting standards.
Human Resources Consulting Services

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS