This Solicitation opportunity from Georgia was posted on December 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Coffee Schools Data Center Power
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Coffee County School System is seeking sealed proposals from authorized resellers for the procurement of two 20kW uninterruptible power supplies (UPS) or equivalent units meeting specified requirements. These units must include lithium-ion batteries, internal redundancy (n+1) capability, and come in either 9U or 12U rack-mount form factors. While the battery packs should be expandable to allow for increased offline runtime, no expanded battery pack is required at the time of purchase. The cost should also cover installation, configuration, integrated network management capabilities, and a minimum three-year warranty covering parts and labor for both the UPS systems and batteries. In addition, the proposal must include six APC Power Distribution Units (PDU) rated at 30A or comparable alternatives that feature a vertical form factor with intelligent functions such as outlet-level metering, remote rebooting, integrated network interfaces, and compatibility with IEC C13 and C19 power cords. The solicitation is issued by the Coffee County School System in Georgia, with proposals due by January 21, 2026. The point of contact for this procurement is Logan Evans, who can be reached at the provided email and phone number.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Water and Sewer Pipe and Fitting SupplierOpen now, due in 19 days
- Electronic Component Supply for CCA RepairOpen now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Two (2) APC 20kW Uninterruptible Power Supplies with rack mounting components, management licenses, and installation & configuration, or equivalent uninterruptible power supplies of any brand, as long as it serves the same service and functionality. a. Lithium Ion batteries required b. Internal redundancy (n+1) capability c. 9U or 12U rack-mount form factor d. Battery pack expandable (capability) for the option to increase offline runtime; no expanded battery pack needed in this bid. e. Installation and Configuration to be included in the cost f. Integrated Network Management capability g. Minimum 3-year parts and labor warranty on UPS system and batteries Six (6) APC Power Distribution Units (30A) or equivalent in listed features that follows; Vertical Form Factor; Intelligent features like outlet-level metering, remote rebooting capability, integrated network interface; IEC C13 and C19 Power cord compatibility
More opportunities from Georgia → Coffee County School System
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
