Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on April 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Coffin Building Gym Floor Replacement

Closed
PE-56300-RFP-2026-000000024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Purchase and Installation of Carpet at the Frank Wing Building
Solicitation # 6100019757
The City of San Antonio Building and Equipment Services Department is soliciting formal bids under solicitation number 6100019757 for the purchase and installation of various types of carpet at the Frank Wing Building located at 401 S. Frio Street, San Antonio, Texas. The project scope involves replacing flooring across the first and second floors, specifically targeting the director's office, conference rooms, judges' offices, magistrate supervisor's office, directors' lobby, filing multi-purpose room, human resource and time and attendance areas, administrative back hallway offices, and court security areas on the first floor. Second-floor requirements include the court clerk work area, presiding judges' chambers, courtroom, and juvenile courtroom. Applicable materials fall under product category 36010, which includes cotton, synthetic, and wool carpets. The solicitation was issued on October 14, 2026, with a final response deadline of November 20, 2026, at 2:00 p.m. Central Time. Interested vendors were scheduled for a pre-bid conference and site visit on October 21, 2026. To participate and submit a response, offerors must complete the SAePS Vendor Registration. Primary points of contact for this procurement include Genaro De-Leon, Troy Elliott, and Angelica Mata, with Mary Alice Alvarez serving as the Procurement Specialist II.
CITY OF SAN ANTONIO

POSTED

1 day ago

DEADLINE

in 12 days
NAICS: 238330
New
SLED
Replacement of Gym Floor at Elizabeth Shelton School
Solicitation # 2027-12
The City of Shelton is soliciting competitive bids for the replacement of the gymnasium floor at Elizabeth Shelton School, located at 138 Willoughby Road, Shelton, CT. This project requires the contractor to provide all labor, materials, and equipment for the demolition and replacement of the existing floor, including an allowance for floor leveling. Bidders must provide lump sum pricing for the primary scope and include alternates for the abatement of asbestos-containing materials and the installation of an alternative flooring system, such as a pad and pour polyurethane system. The successful contractor must provide manufacturer and workmanship warranties upon completion, and an abatement certification if applicable. Bids must be submitted via the City e-Procurement Portal by December 4, 2026, at 11:00 am. Requirements for submission include a signed and notarized non-collusion affidavit and a completed vendor questionnaire. The project is subject to Connecticut prevailing wage determinations and requires the contractor to provide both performance and payment bonds before commencing work. Additionally, contractors must comply with non-discrimination and affirmative action provisions, make good faith efforts to employ minority business enterprises, and adhere to all applicable federal, state, and local building codes and environmental regulations.
Board of Education

POSTED

2 days ago

DEADLINE

in 26 days
NAICS: 238330
New
SLED
P-26001 RFP for Pour in Place Playground Surface Repairs and Replacement
Solicitation # P-26001
The Chicago Park District is soliciting proposals under RFP P-26001 for the repair and replacement of Pour-In-Place (PIP) playground surfaces across its existing outdoor playgrounds and any future constructions. The selected awardee must provide all necessary labor, equipment, and materials, including TPV top layers and SBR base layers, to perform corrective maintenance, preventive maintenance, and complete surface replacements. The scope includes specific tasks such as re-capping and site restoration, with a strict requirement that the awardee perform at least 25% of the work using its own forces. Performance is subject to specific operational hours from 6:00 a.m. to 4:00 p.m., Monday through Friday, with emergency response times mandated at two hours on weekdays and twenty-four hours on weekends. Proposals are due by November 30, 2026, via the BONFIRE portal and will be evaluated based on experience (30%), implementation plan and capacity (20%), personnel qualifications (20%), and cost reasonableness (20%). To be eligible, firms should have at least five years of experience and a proven reputation for servicing large-volume commercial customers. The contract requires strict adherence to non-discrimination laws, including the Illinois Human Rights Act and the Public Works Employment Discrimination Act. Administrative requirements include submitting itemized invoices in triplicate to the Office of the Comptroller, with payments processed within thirty days in accordance with the Local Government Prompt Payment Act.
Chicago Park District

POSTED

2 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves the complete renovation of the Coffin Building gym floor at the College of Coastal Georgia. The scope of work includes removing the existing flooring down to the bare concrete and installing approximately 10,070 square feet of Aacer MFMA certified flooring system. This system features 21/4" x 3/4" #2 grade or better maple over a custom sleeper system supported by cush pads on top of a 6-mil vapor barrier, designed to fit the existing six-inch slab depression. Additionally, new cove base installation will be done on both ends and affected wall areas. The contract also calls for drum sanding the entire court and applying game lines, painting, and staining treatments to match the existing court’s artwork and color scheme. The solicitation for this project was posted on April 20, 2026, with a response deadline of May 22, 2026. The project is managed by the College of Coastal Georgia, located in Georgia state, and the primary point of contact is Paul Melchor. This solicitation is open to appropriate responders under the SLED organization type. The contract emphasizes adherence to MFMA certification standards for quality and durability in sports flooring installation, ensuring a professional finish consistent with current visual and functional standards of the gymnasium surface.

General Info

Complete renovation of Coffin Building gym floor with MFMA certified maple flooring and finishing.

Agency

College of Coastal Georgia

Place of Performance

GA, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCollege of Coastal Georgia
Contacts1 person available
OfficeN/A
Organization / Agency
College of Coastal Georgia
Office AddressN/A
Contacts

Full Description

Show more
Demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, painting, and staining to match the existing artwork and color scheme.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS