Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Collaborative Design-Build Services for the Merced to Madera Civil Works Project

Active
20260701003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California High-Speed Rail Authority is soliciting collaborative design-build services for the construction of approximately 30.3 miles of new high-speed rail guideway extending from Merced to Madera County, with the primary place of performance located in Atwater, California. This project involves extensive civil works including embankments, major bridge structures over waterways and roadways, drainage systems, animal crossings, irrigation facility upgrades, and roadway reconstructions, organized into North, Wye, and South segments with both single-track and double-track configurations. The contractor is responsible for technical and programmatic integration with other interface contractors, though the scope explicitly excludes trackwork, station construction, geotechnical investigations, utility relocations, right-of-way acquisition, and systems design. The procurement follows a Progressive Design-Build delivery model with a Pre-Proposal Collaboration Agreement (PPCA) phase, during which shortlisted offerors will be compensated for collaborative planning efforts. The estimated project value is $2.4 billion, and the contract is not structured under a Lowest Price Technically Acceptable approach, but rather on a best-value trade-off basis, evaluating technical merit alongside cost. Offerors must submit three volumes of proposals—General, Financial, and Technical—in both hard copy and digital PDF formats, adhering to strict packaging, labeling, and formatting standards, including a 5-page executive summary limit in the Technical Volume and 3-page resumes per Key Personnel, which are exempt from page count restrictions. Mandatory components include full disclosure of Organizational Conflicts of Interest, submission of Key Personnel qualifications with verified references, and commitments to Small Business, Disadvantaged Business Enterprise, and DVBE participation goals. The contractor must assign experienced, California-licensed Professional Engineers as Key Personnel, with strict protocols for any personnel changes requiring prior approval. Bonding requirements anticipate a 50% performance bond and 100% payment bond, and all proposal materials become the property of the Authority and subject to public records laws. The solicitation emphasizes collaboration, risk management, constructability improvements, and adherence to community benefits agreements and federal workforce development requirements, including OSHA compliance and Equal Employment Opportunity mandates. Proposals are due by September 29, 2026, and must be submitted via a secure, Authority-issued cloud portal following prior coordination with the Designated Point of Contact.

General Info

Design-build civil works for 30.3-mile high-speed rail guideway between Merced and Madera, excluding track and stations.

Agency

California High-Speed Rail AuthorityView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

City of Atwater, CA, 95301, USA

Set-Aside

NONE

Documents

(1)

RFQ HSR26-16 for Merced to Madera Civil Works Collaborative Design-Build Services

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High-Speed Rail Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California High-Speed Rail Authority
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #HSR26-16: The project involves the design and construction of approximately 30.3 miles of new high-speed rail guideway from Merced to Madera County. The work includes extensive embankment, major bridge structures over waterways and roadways, roadway reconstructions, drainage improvements, animal crossings, and irrigation facilities. The project is divided into North, Wye, and South segments, comprising both single-track and double-track guideway. The contractor will be responsible for technical and programmatic integration with interfacing contractors. The scope excludes trackwork, stations, geotechnical investigations, utility relocations, right-of-way acquisition, and systems work.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging gravel, sand, silt, and clay to a depth of -12 feet Mean Lower Low Water with a one-foot overdepth, including hauling and ocean disposal. Additionally, the project requires revetted mole repairs involving clearing and grubbing, CRM wall repair, vegetation removal, and the installation of new or reworked stone to fill voids. The performance period is 200 calendar days from the notice to proceed. This is a firm fixed price solicitation under NAICS code 237990, set aside for various small business categories including SDB, WOSB, HUBZone, and SDVOSB. Bids must be submitted in sealed envelopes by September 30, 2026, as electronic submissions are not permitted. A bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, is required. Award is subject to pass/fail gates regarding compliance and completeness, with special consideration for labor surplus area concerns in the event of tie bids. Quality control is strictly managed through the USACE National Dredging Quality Management Program and requires a full-time on-site Quality Control Manager.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California High-Speed Rail Authority

Same awarding agency