Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Collective Storm Drainage Improvement Project - Series AJ

Active
FY27-ITBCon-19State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Collective Storm Drainage Improvement Project Series AJ is an Invitation to Bid issued by the City of Charlotte Storm Water Services for comprehensive infrastructure improvements across four primary locations: 2033 Teddington Drive, 10513 Moss Mill Lane, 2316 Kilborne Drive, and 435 Norwood Drive. With an estimated project cost of 1,036,942 dollars, the scope of work includes the installation of various reinforced concrete pipe culverts, cured in place pipe liners, and masonry drainage structures. Additional requirements involve comprehensive grading, asphalt milling and surfacing, the installation of concrete valley gutters and sidewalks, and utility work including watermain lowering and sanitary sewer pipe replacement. Environmental restoration efforts such as riparian seeding, live stakes, and erosion control matting are also required. The solicitation was posted on October 28, 2026, with a response deadline of December 3, 2026. Award is based on the total base bid provided via an electronic bid form. A key contractual requirement is a Small Business Enterprise goal of 10.00 percent; bidders failing to meet this goal at the time of bid opening are granted 24 hours to submit a finalized CBI Utilization Form. Performance standards include adherence to NCDOT specifications for manhole frames and CLDS standards for concrete valley gutters. All bids must be submitted in accordance with the instructions provided in the invitation to bid, as submissions through the Bonfire procurement portal are not permitted for construction bids.

General Info

City of Charlotte bid for storm drainage infrastructure improvements across four locations.

Documents

3
PDF, High priority: read this firstitb
High
XLSX, High priority: read this firstbid-schedule
High
PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → City Of Charlotte
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Katherine Osborne

Full Description

Show more
Collective Storm Drainage Improvement Project Series AJ will include 4 separate projects with this series. 2033 Teddington drive will include 120 LF of 18" RCP and 143 LF of 24" RCP. Teddington Drive will also include lowering a 2" watermain and replacement for 8" sanitary sewer pipe. 10513 Moss Mill Lane will include 93 LF of 60" CIPP, 30 LF of 15" CIPP, and 94 LF of 30" CIPP. This project will also include 200 LF of channel/bank grading. 2316 Kilborne Drive will include 60 LF of 24" RCP and 28 LF of 24" CIPP. 435 Norwood Drive will include 81 LF of 24" Class IV RCP, 41 LF of 30" Class IV RCP, and 56 LF of 45"x29" elliptical RCP. The estimated cost of the project is $1,036,942.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The primary point of contact for this solicitation is John Connelly. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping in various diameters, the construction of standard and doghouse manholes, and the creation of launch and receiving shafts for 24-inch trenchless crossings. Additional requirements include the installation of an outfall and CSO regulator fit out, as well as site preparation involving the clearing and grubbing of 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must adhere to specific operational and compliance standards, including the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP) and the provision of geotechnical instrumentation and monitoring. Due to the nature of the project site, railroad insurance is a mandatory requirement. The bid schedule also accounts for mobilization, maintenance of flows and bypass, and the abandonment of existing pipes and manholes.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the complete mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site improvements such as fencing and grading. The project has an estimated value of 16,690,000 dollars and includes a 200,000 dollar contingency allowance. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to submission requirements, including the provision of MWBE Good Faith Efforts and Table A documents. The project is governed by EJCDC standard forms, specifically the C-700 General Conditions and C-800 Supplementary Conditions. Performance and payment bonds, as well as proof of insurance, are required. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, with a payment process where applications for payment are reviewed within 10 days and become due 30 days after presentation to the owner. Work must adhere to rigorous industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details

More opportunities from North Carolina → City Of Charlotte

Same awarding agency

NAICS: 812332
New
SLED
Citywide Uniform Rental and Laundering Services
Solicitation # 269-2027-026
The City of Charlotte is soliciting proposals for citywide uniform rental and laundering services to support approximately 1,886 employees across various departments, including Aviation, CATS, CDOT, SWS, and Water. The selected vendor will provide a comprehensive range of apparel, including standard maintenance uniforms, lab coats, coveralls, and specialized gear such as high-visibility and flame-resistant garments (Categories 1, 2, and 3). Additional deliverables include the provision of shop rags and floor mats, with a requirement to replace uniforms every two years to address normal wear and tear. Services include weekly deliveries by 7 AM on Tuesdays to CATS facilities, the supply of dirty and repair bins at each location, and the application of heat-sealed or screen-printed emblems. The procurement process emphasizes best value, evaluating candidates based on qualifications, proposed solutions, cost-effectiveness, SBE inclusion efforts, and acceptance of contract terms. Compliance requirements are stringent, incorporating Federal Acquisition Regulations (FAR), FTA contracting terms, and Buy America mandates for manufactured products. Vendors must adhere to strict delivery timelines, providing initial issues one week before the contract start and fulfilling new employee orders within one to four weeks depending on sizing. Administrative requirements include detailed invoicing with purchase order numbers, certification against discrimination and debarment, and the submission of proposals via the City's e-Procurement portal by November 19, 2026.
Industrial Launderers

POSTED

about 14 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238990
New
SLED
CATS BUS STOP IMPROVEMENTS: AMENITY ASSEMBLY AND INSTALLATION
Solicitation # 269-2027-2193
The City of Charlotte is soliciting proposals for solicitation number 269-2027-2193 to secure qualified contractors for the assembly and installation of bus stop amenities across the Charlotte Area Transit System (CATS) network. This multi-phase capital program aims to enhance the safety, accessibility, and customer experience of bus stops within the City of Charlotte and throughout Mecklenburg County, including various surrounding municipalities. The selected contractor will be responsible for the labor, supervision, equipment, transportation, and traffic control necessary to assemble, deliver, install, modify, repair, or replace CATS-furnished amenities, such as solar lighting components. Notably, the construction of concrete bus stop pads and initial site preparation are excluded from the scope of work and will be handled by CATS or a separate designated entity. The contract is based on a three-year term with firm fixed pricing. Proposals are evaluated on a best-value basis, weighted by price effectiveness and value (35 points), qualifications and experience (25 points), method of approach (20 points), and schedule (20 points). Awardees must be registered in the City's vendor system and maintain insurance from North Carolina-qualified insurers with an A.M. Best rating of at least A-. Key operational requirements include the ability to perform installation work within seven days of a task order approval and the submission of a comprehensive Quality Assurance/Quality Control plan. Proposals must be submitted via the City's Procurement Portal by December 16, 2026, and must not exceed ten single-sided pages.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS