Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

College of the Redwoods Student Housing Replacement Project

Forecast
12-2026-040State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Redwoods Community College District plans to replace two outdated residence halls on its northern campus with a modern student housing and dining complex designed to accommodate 246 students and staff. The new facility will offer 67 apartment-style and semi-suites units, replacing the current 166 beds, and will include shared amenities such as study rooms, social lounges, and laundry facilities. Adjacent to the residence hall, a dedicated one-story dining facility spanning approximately 10,000 square feet will serve both residents and the broader campus community, enhancing access to affordable, on-site meals. The project is grounded in improving student retention and success by delivering safe, community-focused, and affordable housing options. Infrastructure upgrades will encompass new driveways with emergency vehicle access, modernized utility connections, enhanced fire safety systems, and sustainable stormwater management through bioretention areas. Landscaping efforts will prioritize the preservation of existing trees while introducing new plantings and outdoor recreational spaces to encourage student interaction and well-being. The initiative, formally titled the College of the Redwoods Student Housing Replacement Project, is forecasted with a posting date of June 16, 2026, under the California State Community Colleges system, with Julia Morrison, Vice President of Administrative Services, serving as the primary point of contact. The development aims to integrate seamlessly into the campus fabric while supporting long-term operational efficiency and environmental stewardship.

General Info

Replace two old dorms with modern housing for 246 students, plus a 10,000 sq ft dining facility and sustainable campus upgrades.

Agency

California State Community Colleges

Place of Performance

7351 Tompkins Hill Road, Eureka, CA, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia State Community Colleges
Contacts1 person available
OfficeN/A
Organization / Agency
California State Community Colleges
Office AddressN/A
Contacts
Julia MorrisonVice President, Administrative Services

Full Description

Show more
The Redwoods Community College District proposes to replace two aging residence halls on the northern portion of its campus with a new student housing and dining complex. The existing facilities, which currently provide 166 beds and require significant maintenance and seismic upgrades, will be replaced with a modem residence hall designed to accommodate approximately 246 students.and staff. The new building will feature 67 dwelling units in a mix of apartment-style and semi0suite-style configurations, along with shared amenities such as study rooms, social spaces, a student lounge, and laundry facilities. A separate one-story, dining hall and kitchen, totaling approximately 10,000 square feet, will support residential and·campus-wide dining needs. The project is intended to enhance student access, retention, anµ success by providing safe, affordable, and community oriented housing. Beneficiaries include current and prospective students, campus, staff, and the broader College community; Infrastructure improvements will include new driveways with emergency vehicle access, upgraded utility connections, fire safety systems,.and sustainable stormwater management features such as bioretention areas. Landscaping will preserve existing trees where feasible and introduce new plantings and outdoor amenities to promote student interaction and recreation.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall system updates, and interior reconfiguration with new finishes, including epoxy mortar flooring. Critical infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and a complete replacement of electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be awarded based on the lowest price. Bidders must provide pricing for building renovation and paving removal and replacement. Depending on the proposal value, bid, payment, and performance bonds may be required, with bid bonds set at 20 percent of the proposal amount. The contract is subject to the Davis-Bacon Act and Buy American requirements. All invoicing must be processed through Wide Area Workflow, and the contractor is required to maintain a quality control system compliant with FAR 52.246-12.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, and the installation of rubber wall bases and LVP flooring. Additionally, the contractor is responsible for electrical repairs and the replacement of vanities and cabinets. All work must comply with ADA, OSHA, EPA, and NFPA-101 Life Safety Code standards, with Massachusetts state regulations prevailing where more stringent. The total period of performance is 105 days, consisting of 90 days to reach substantial completion and 15 days for final completion. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit their proposals by November 17, 2026. Required submission documents include a detailed cost breakdown for labor, materials, and equipment, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of conformity to local wage rate decisions. The contractor must provide a one-year workmanship guarantee and a 20-year product warranty for LVP flooring.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 6 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS