Colton High School Baseball and Softball Field Lighting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Colton Joint Unified School District is undertaking a lighting improvement project at Colton High School to install new field lighting on the varsity baseball and varsity and junior varsity softball fields, while replacing the existing lighting on the junior varsity baseball field. The project will involve the installation of 21 steel poles and 134 luminaires, all designed to meet California Interscholastic Federation lighting standards and to minimize skyglow, light spill, and glare affecting nearby residential areas. The upgrades are intended to support extended evening use of the fields due to the district’s later school start time, without expanding enrollment or programs. Construction is scheduled for the third quarter of 2025 and will be conducted in phases to reduce disruption to school operations and community events. All work has been reviewed and approved by the Division of the State Architect to ensure compliance with state facility and environmental regulations. The project qualifies for categorical exemptions under CEQA Sections 15304 and 15314, and supporting documentation including a Notice of Exemption, CDFW No Effect Determination, and a certified environmental fee exemption are required components of the filing process. A $50 county documentary handling fee was paid, but no federal contract clauses or FAR provisions apply as this is not a federally funded procurement. Payment for contracted work will be handled manually by the district through cash, check, or credit at their facilities office, with no electronic invoicing system specified. The lead contact for the project is Owen Chang, Director of Facilities and Energy Management, and the work will be performed at Colton High School’s athletic fields located at 777 West Valley Boulevard in Colton, California. Although the contract value is not disclosed and formal solicitation or evaluation criteria are absent, the scope is clearly defined around lighting equipment installation and environmental compliance, with acceptance of work to occur on-site upon completion.

General Info

Install 134 luminaires and 21 poles at Colton High School fields to meet CALIFORNIA standards, reduce light pollution, support evening use.

Agency

California → Colton Joint Unified School District

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Rancho Ave and Valley Blvd, Colton, CA, 92324

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Colton High School Field Lighting Project 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Colton Joint Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Colton Joint Unified School District
Office AddressN/A
Contacts
Owen ChangDirector of Facilities and Energy Management

Full Description

Show more
The Colton Joint Unified School District plans to install new field lighting at Colton High School's varsity baseball and varsity and junior varsity (jv) softball fields and replace existing lighting at the JV baseball field, totaling 21 steel poles with 134 luminaires. These improvements will meet California Interscholastic Federation lighting standards and include features to eliminate skyglow and reduce light spill and glare near residences. The lighting will support existing school and community use without expanding programs or enrollment, accommodating later evening activities due to a later school start time. Construction, approved by the Division of the State Architect, is scheduled in the third quarter of 202 and will be phased to minimize disruption to school operations. The proposed improvements would benefit the school and community

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # main-grounding-electrode
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the US Department of Labor, is soliciting a single lump sum contract for a licensed electrical contractor to inspect and repair grounding systems at multiple campus buildings in Laurel, Maryland. The scope of work includes the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as the Administration Building. Specific technical requirements include installing #2/0 awg conductors from underground copper water pipes, connecting to 16x2 inch ground bars, installing two 8-foot ground rods with 6-foot separation, and routing conductors in 3/4 inch EMT conduit. All work must comply with NEC 2023, 250, EPA and OSHA regulations, and Maryland state codes. Proposals are due by September 3, 2026, and must be submitted on company letterhead to Purchasing Manager Audrey Davis. Bids will be evaluated based on price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Required submission documents include a detailed cost breakdown, a valid Maryland contractor's license, insurance certificates, a W9, and a completed vendor questionnaire. The selected contractor must start work within 14 days of the Notice to Proceed and provide a one-year workmanship guarantee. Payment terms are Net 30, and the contract is set aside for various small business categories.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the US Department of Labor, is soliciting a single lump sum contract for electrical panelboard repairs and labeling in Maryland. The scope of work focuses on ensuring compliance with NEC 2023 standards across several campus buildings, including Elm Hall, Birch Hall, the Vocational building, Willow, and Mahogany. Key tasks include providing non-handwritten circuit directories, reinstalling a panel cover in the welcome center mechanical room, and performing specific fire alarm control panel identification at the Oak Dormitory using UL listed red mark labels. The performance period is scheduled from May 11, 2026, through December 31, 2026. This solicitation is set aside for various small business categories and requires bidders to attend a mandatory bid conference to be considered. Proposals are due by September 3, 2026, and must be submitted on company letterhead with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Maryland Contractor's License. Award decisions will be based on best value, weighing technical quality and experience against price. Contractors must adhere to EPA and OSHA regulations, provide comprehensive general and automobile liability insurance, and comply with Service Contract Labor Standards for wage determinations. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
Electrical Repair Services
Solicitation # Electrical Services 8-2026
The Management and Training Corporation, acting for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to provide various electrical repair services at the Centennial Job Corps Center in Nampa, Idaho. This opportunity is set aside for small businesses, including disadvantaged, women-owned, HUBZone, and veteran-owned entities. Bids must be submitted via email to Sandra Clore by August 31, 2026, at 3:00pm MST. A pre-bid meeting is scheduled for August 21, 2026, at 10am MST. The scope of work includes all electrical services detailed in the Construction Bid Package, requiring the contractor to handle all incidental work, acquire necessary building permits, and provide a one-year written guarantee of workmanship. Bidders must provide a detailed cost breakout on company letterhead covering materials, labor, equipment, and overhead. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is subject to Construction Wage Rate Requirements, and the contractor must submit weekly certified payroll. Payment will be made via progress payments using AIA G702 and G703 forms, contingent upon the submission of a Schedule of Values and the acceptance of delivered services. Additionally, the contractor must adhere to strict Department of Labor security and privacy guidelines, including mandatory annual records management training and liability for data breaches. Final closeout requires the submission of two complete operation and maintenance manuals and all applicable manufacturer warranties.