Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Combined SS and Pre-Solicitation for upgrading an existing Modified Record Fire (MRF) range to a fully Automated Record Fire (ARF)

Closed
W91RUS26R7700Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 3 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Department of Defense is seeking to upgrade an existing Modified Record Fire (MRF) range to a fully Automated Record Fire (ARF) system through a presolicitation notice issued under solicitation number W91RUS26R7700. This effort is targeted at enhancing training capabilities by integrating automation into current fire range infrastructure, improving accuracy, safety, and efficiency during live-fire exercises. The contract is designated as a Sole Source opportunity under the Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside program, meaning only qualified SDVOSB concerns may respond. The North American Industry Classification System code for this effort is 237990, indicating it falls under other heavy and civil engineering construction. The lead organization is the W6QK Acc-Apg Cont Ct Software Sector, a division under the Department of Defense, operating out of Fort Huachuca, Arizona. The solicitation is currently open for industry feedback and responses must be submitted by May 20, 2026, at 7:00 PM Eastern Time. The place of performance has not been specified beyond the agency's location, suggesting the work may occur at or near existing military training ranges, potentially including Fort Huachuca. Nadia Firestone serves as the primary point of contact for inquiries, reachable via email or phone, and interested parties are encouraged to review the full document on the SAM.gov portal. This initiative represents a significant modernization step in Army firing range operations, aiming to transition from manual to automated systems for record fire training programs.

General Info

Upgrade existing Modified Record Fire range to Automated Record Fire system, SDVOSB sole source, due May 2026.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Fort Huachuca, Arizona, AZ

Set-Aside

SDVOSBC

Documents

1

Sources Sought/Pre-Solicitation - Range 13 ARF Upgrade

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg Cont Ct Software Sector
Contacts1 person available
OfficeFORT HUACHUCA, AZ, 85613-5000, USA
Office AddressFORT HUACHUCA, AZ, 85613-5000, USA

Full Description

Show more
Combined Sources Sought and Pre-Solicitation Synopsis for upgrading an existing Modified Record Fire (MRF) range to a fully Automated Record Fire (ARF). Please review attached document.

More opportunities from Department Of Defense → W6QK Acc-Apg Cont Ct Software Sector

Same awarding agency

NAICS: 517111
Federal
Local voice and data circuits and domestic long distance access for the Presidio of Monterey, CA.
Solicitation # W91RUS26QA052
Solicitation W91RUS26QA052 is a Request for Quote for the provision of local exchange access services, analog and digital access transport, and inter/intra-LATA interconnect functions for the Presidio of Monterey, California. The scope includes the delivery of local voice and data circuits, specifically integrating with a Nortel SL1, Option 81 switch in Building 343. Key deliverables include Local Exchange Digital (ISDN PRI) Trunks and Commercial Subscriber Lines with domestic long distance. The acquisition is not set aside for small businesses, though it utilizes NAICS code 517111. The contract will be awarded on an all-or-none basis to a facilities-based incumbent or competitive local exchange carrier certified by the State of California. Evaluation is based on price, technical capability, and past performance from the last three years. The performance period includes an installation and cut-over phase, which must be completed within 120 calendar days following government acceptance of the installation plan, followed by a base year and three option years. The contractor must provide a 24/7 point of contact for service outages and respond to notifications within one hour. Safety requirements include strict adherence to hazardous materials protocols and coordination with the Directorate of Engineering and Housing or Department of Public Works before any excavation or facility modification.
Wired Telecommunications Carriers

POSTED

3 months ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS