This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Combined Synopsis / Solicitation for Containment Case B1 Flange Repair Limit Exploration in support of the F108 Engine

Closed
SPE4AX-25-R-F108-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves a sole-source effort by DLA Aviation to support the United States Navy's investigation into cracking issues on the Fan Containment Case B1 flange of the CFM56-7B27 engine series, specifically targeting lugs 70 and 71. The work aims to determine the acceptable repairability limits for these lugs, including the potential removal of material down to or below the flange’s minimum radial height, without validating the removal of the IDG lanyard or redesigning associated brackets. The contractor, CFM International Inc., will analyze the feasibility of such repairs, develop detailed technical data packages outlining hypothetical repair limits, procedures, and inspection methods, and deliver comprehensive documentation including analysis summaries, modeling assumptions, and dimensional tolerances. The scope emphasizes technical analysis, work planning, and the development of a technical data package that defines the repair methods and dimensional constraints. The effort is critical for understanding the limits of repairs to mitigate fatigue-related cracking caused by vibration-induced stresses. The contract stipulates that proprietary data from CFM will be used exclusively for this purpose, and interested non-OEM sources must notify the contracting officer before the solicitation closes. The procurement is scheduled with a response deadline of October 17, 2025, and requires registration in the System for Award Management (SAM) to be eligible for award. The work will be performed in Richmond, Virginia, under the guidance of Keith Allgeier, with the overarching goal of supporting the USN’s maintenance and repair strategies for the engine components.

General Info

DLA amends sole source contract with CFM for Navy and Air Force engine repair support.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

Richmond, VA, 23297, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Sources Sought → Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA Aviation
Contacts1 person available
OfficeRICHMOND, VA, 23237, USA
Office AddressRICHMOND, VA, 23237, USA

Full Description

Show more
This notice serves as DLA Aviation's combined synopsis/solicitation as described in FAR 12.603, in accordance with FAR 5.201 and the approved J&A, for addition of providing support to identify acceptable repairability limits for hole numbers 70 and 71 on the Containment Case B1 Flange for the CFM56-7B27 series of engines (USAF F108) in support of the United States Navy (USN) and provide reports documenting the findings.. Addition to sole source Long Term Contract SPE4AX-25-D-9406 to CFM International Inc. (CFM), Contractor and Government Entity (CAGE) code 58828. This is a FAR part 12 effort being added to the current contract SPE4AX-25-D-9406. B1 Flange support services for the United States Air Force (USAF) are being solicited to be added to contract SPE4AX-25-D-9406, awarded to CFM International Inc. CAGE 58828. Actual requirements for the additional scope will be negotiated and added to the basic contract. Individual requirements are certified as sole source to CFM and synopsized in accordance with FAR 5.201. DLA Aviation will issue a letter solicitation (RFP) to the sole source Original Equipment Manufacturer (OEM). If any non-OEM source is interested in any of the NSNs, please notify the Contracting Officer prior to the combined synopsis/solicitation closing date. A copy of the letter of interest should be forwarded to the Contracting Officer identified herein. The Government may alter the acquisition strategy if it is in the best interest of the Government. In order to receive an award, you must be registered in the System for Award Management (SAM). SAM registration is at https://www.sam.gov. It is anticipated that this requirement will be added as a separate line item to the current sole source CFM COI contract SPE4AX-25-D-9406. The data required to perform the necessary services is CFM's proprietary and confidential commercial intellectual data and cannot be shared or provided by the Government. Only sources able to gather the required performance data will be considered as a qualified source. The scope of work is as follows: The United States Navy (USN) identified cracking in the Fan Containment Case B1 flange, originating at lug number 71, on two separate occasions. The driving mode for these cracks has preliminarily been identified as low-stress, high-cycle fatigue (HCF) likely caused by vibration of the Integrated Drive Generator (IDG) retention lanyard. This vibration would theoretically drive cyclic torsional and shear stresses at B1 flange lug number 71 via the IDG retention lanyard bracket mounted to the containment case at lugs #70 and #71. The USN desires to understand the hypothetical limits and repair procedures associated with transverse cracks propagating between the scallops of lugs #70 and #71 on the Fan Containment case B1 flange. This effort is limited to determining the feasibility and dimensional limits of a hypothetical repair on these 2 lugs, inclusive of removal of the entirety of the material of B1 flange lugs #70 and #71 down to or below the flange minimum radial height in the scallops between lugs. The scope of the effort is not to validate the removal of the IDG lanyard, nor to redesign the lanyard brackets and configuration. The Contractor will be responsible for delivering; Documentation, including a breakdown and timeline of work tasking, for performance of the repair limit development work as outlined in this document. A Technical Data Package (TDP) summarizing: Analyses performed Underlying modeling or analysis assumptions. Test and validation data used if any High level description of modeling or analysis results A Technical Data Package (TDP) inclusive of: Hypothetical Repairability Limits Inclusive of min/max depth, distances, and radii, and their associated dimensional tolerances, relative to reference points and/or planes usable for machining operations and inspection of a hypothetical repaired flange. Calling out both the maximum/minimum recommended and allowable dimensional limits for the hypothetical repair, if they are different. Hypothetical Repair Procedure Inclusive of min/max depth, distances, and radii, and their associated dimensional tolerances, relative to reference points and/or planes usable for machining operations and inspection of a hypothetical repaired flange. Recommended inspection(s), if any, to ensure conformance to part material specifications and component functionality (e.g. local surface hardness, grain size, surface roughness) Requirements of this effort are as follows; 1.Work Planning The Contractor shall provide support and documentation, including a rough order of magnitude (ROM) cost and plan of action and milestones (POAM) for performance of the work as outlined in this document. 2. Technical Analysis The Contractor shall perform analysis to support an assessment of the limiting dimensions of the hypothetical flange repair identified in this project inclusive of, but not limited to, the critical elements of the Modeling and Simulation analysis. 3. Hypothetical Repair Documentation The Contractor shall develop a Technical Data Package (TDP) that defines the methods of implementing and the dimensional constraints of this hypothetical repair.

More opportunities from Department Of Defense → DLA Aviation

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS