CLASS-ITEM DESCRIPTION 906-08 Automation; Controls; Instrumentation, Architectural Services 906-30 Fire Protection, Architectural Services 906-44 Heating; Ventilating, Air Conditioning – Architectural Services 906-78 Security Systems – Architectural 906-92 Utilities, Gas, Steam, Electric, Architectural Services 925-07 Air Conditioning, Heating and Ventilating Engineering 925-22 Control Systems Engineering 925-95 Utilities, Gas, Steam, Electric Engineering 961-14 Commissioning of Facilities Service, Functional and Pre-functional SCOPE: Inaccordance with the provisions of Texas Government Code, Chapter 2254,Subchapter A, Professional Services, and Rules and Procedures adopted by theTexas Facilities Commission (TFC), TFC is requesting submittal ofqualifications to provide professional Commissioning services for Project#24-020-2552 the DPS Training Academy Campus Expansion in Florence, Texas, tosupport the successful execution and completion of programming, design,construction and project closeout for the Phase 1 elements detailed in AttachmentF – “TXDPS Program of Requirements (POR) V2 dated 7/23/24”. CONTRACT TERM: Itis the intention of TFC to award a Contract for professional BuildingCommissioning services for the term of the project. Services undertakenpursuant to this RFQ will be required to commence within Ten (10) calendar daysof delivery of a Notice to Proceed. The preliminary/targeted cumulativePre-Construction period is estimated to be 294 calendar days and the cumulativeConstruction period is 651 calendar days. PROJECT DESCRIPTION: Provide professional commissioning servicesduring all phases of the Project from construction documents through thewarranty phase(s) for the Phase 1 elements detailed in Attachment F – “TXDPSProgram of Requirements (POR) V2 dated 7/23/24”. STATEMENT OF WORK1. Theprofessional Commissioning Scope of Service includes, but is not limited to,review of design documents, provision of Commissioning specification toEngineer of Record (EOR), coordination and witnessing of equipment testing,witness, verification and documentation of correctly operating equipment,controls system and life safety systems, review of TAB report, coordinationwith TFC, EOR, and Construction Manager at Risk (CMR) to address issuesidentified during all phases. 2. The PSP will work closely with TFC/OR and collaboratewith A/E, CMR, and contractors during all phases of each Bid Package of theProject, as described in Contract. Promptly communicate with pertinent parties,including topics regarding information needs and responses to needs of otherparties. 3. Provide enhanced commissioning services for pre-design,design, construction, post-construction, and warranty phases necessary and/orreasonably inferable from Attachment F – “TXDPS Program of Requirements (POR)V2 dated 7/23/24” and Attachment D, Professional Services Agreement template. 4. Develop Pre-Design Acceptance Requirements for theProject in accordance with all applicable guidelines and standards. 5. Develop and update commissioning plan throughout project. 6. Develop and update commissioning specifications. 7. Provide design and submittal reviews, commissioningrelated documents to incorporate into the construction documents, installationverification, functional performance testing, and operations and maintenance(O&M) training to ensure the project requirements. 8. Provide input on the overall master schedule wherecommissioning related tasks are to be performed. 9. Develop procedures for an issues log to track allcommissioning related issues, deficiencies, and resolutions. 10. Provide a final commissioning report. Summary of Systems Commissioned Referto Attachment F – “TXDPS Program of Requirements (POR) V2 dated 7/23/24”. Agentshall commission all electrical, mechanical, and building envelope systems forthe entire project for all facilities to include but not limited to thefollowing: A. Wet pipe sprinkler systems B. Fire & smoke detection system C. Alarm systems D. Plumbing systems E. HVAC & ventilation systems F. Package chillers G. Package wastewater treatment plant systems H. Building envelope/enclosure systems I. Central utility plant & water pumping systems J. All electrical systems K. All low voltage systems (fire alarm, data, safety &security) MANDATORYPRE-SUBMITTAL TELECONFERENCES: Themandatory pre-submittal conferences will be held on Tuesday, December 10, 2024at 10:00 AM and Wednesday, December 11, 2024, 2024 at 10:00 AM. Pre-registration is required to participate inthe teleconference. Respondents must have an employee of their firm attendat least one (1) of the two (2) scheduled pre-submittal teleconferences.TFC shall reject submittals submitted by firms that did not attend one of themandatory pre-submittal conferences. TFC is using the eProcurementsystem Bonfire. Respondents mustregister for a Bonfire account (No Charge) to submit a response. Respondents must submit theirresponses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/155775 EVENT DATE Issue RFQ 11/26/2024 Mandatory Pre-Submittal Conference 12/10/2024 Tuesday, 10:00 AM (OR) Mandatory Pre-Submittal Conference 12/11/2024 Wednesday. 10:00 AM Deadline for Submission of Questions 12/18/2024 Deadline for Submission of Qualifications & HSP 1/07/2025 Tuesday @ 3:00 PM Notification to Interview 1/17/2025 If Interviews are NOT required by TFC Award by Commission 2/20/2025 Execute Contract 3/15/2025 If Interviews are required by TFC Interviews of short-listed firms 1/28/2025 Award by Commission 2/20/2025 Execute Contract 3/15/2025 This Request for Qualifications (RFQ)is posted on the Electronic State Business Daily (ESBD) located on the TexasComptroller of Public Accounts’ web page located athttps://www.txsmartbuy.com/esbddetails/view/0003687 This website will have the most currentinformation during the solicitation.