Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Communications & Security

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 20260925072.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fire Station #44 Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coastside Fire Protection District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs data, telephone, and fire alarm systems for prime contractors on CFPD Fire Station 44 Replacement projects. Installs data network cabling, fire station alerting systems, and fire alarm systems per Divisions 27 and 28. Delivers operational communications and life-safety systems.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
This firm-fixed-price solicitation involves a site-wide upgrade of the LED lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The project scope encompasses all necessary engineering, labor, supervision, equipment, materials, testing, and commissioning required to replace existing fluorescent fixtures, lamps, and ballasts with energy-efficient LED alternatives. The contractor is responsible for the proper disposal or recycling of all removed materials and must provide a minimum two-hour training session for facility maintenance personnel upon completion. Key deliverables include a Quality Control Plan within 15 days of award, a site survey within 30 days, and comprehensive closeout documentation consisting of as-built drawings, warranty information, and a 5% attic stock of materials. The contract is issued as an 8(a) Multiple Award Construction Contract (MACC) task order with an estimated magnitude between $2 million and $2.3 million. The period of performance is set for 180 calendar days following the notice to proceed. Award will be made to the offeror proposing the lowest total evaluated price. All work must comply with OSHA safety standards, the Americans with Disabilities Act, and the Davis-Bacon Act, specifically adhering to the NY20260110 wage determination for Genesee County. Proposals must be submitted in two separate volumes via email, and the contractor is required to utilize the Invoice Processing Platform (IPP) for all electronic payment requests accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
The US Immigration and Customs Enforcement (ICE) is soliciting proposals for a firm-fixed-price task order to provide and install two 40ft steel conex offices for forensic personnel at the St. Thomas HSI Facility in the US Virgin Islands. These high-security units are designed to provide an environmentally controlled and secure setting for handling sensitive evidence and must include air conditioning, electrical outlets, lighting, security windows, a steel door with a Cypher lock, insulation, vinyl flooring, and fire extinguishers. The installation requires placing the units on reinforced concrete slabs and connecting them to the nearest electrical circuit. The project has an estimated magnitude between $250,000 and $300,000, with a period of performance of 364 calendar days from the Notice to Proceed. This is an 8(a) Multiple Award Construction Contract (MACC) set-aside. Offerors are required to conduct a site survey prior to proposal submission and must adhere to strict security protocols, including signing a Non-Disclosure Agreement and completing Cybersecurity Awareness Training. All materials and equipment must comply with the Buy America Act. The award will be made to the contractor proposing the lowest total evaluated price, with evaluation factors including technical approach, safety and quality control, and price. Proposals must be submitted electronically via email by the deadline, and all work must comply with prevailing wage determinations for the Virgin Islands and relevant building codes such as NFPA 70 and the International Building Code.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
This subcontracting opportunity, issued by Management and Training Corporation (MTC) for the Earle C. Clements Job Corps Center in Morganfield, Kentucky, involves the replacement of existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project requires the removal of retired aerial fiber lines and splice boxes and the installation of new 12 strand single mode aerial fiber to provide network connectivity between the building 2436 network closet (MDF) and the building 2443 maintenance office (IDF). The contractor must provide all labor, equipment, and materials, including Belden FS3L0024NS 12 strand OS2 OSP fiber or an equivalent brand, along with necessary supports, ends, and rack-mounted enclosures. The contract is a fixed-price, single lump sum agreement with an estimated value of up to 25,000 dollars. Bids are due by October 5, 2026, and must be submitted via email to the primary point of contact, Angie Mahoney. To be considered, bidders must conduct a mandatory physical site visit, submit a bid bond guarantee, and provide a detailed cost breakout. Award decisions are based on overall best value. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wage rates as specified in Kentucky wage determination KY20250041. Awarded contractors must possess a Unique Entity Identifier (UEI) and provide performance and payment bonds if the bid is 25,000 dollars or greater. The contract incorporates several FAR clauses regarding small business representations, foreign purchase restrictions, and the protection of sensitive government information. Final acceptance of the work is contingent upon acceptable workmanship and the completion of all punch list items as approved by the buyer and government representatives.
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
SLED
LED Lighting Project #FY2027-Phase 03- Mill Creek Elem
Solicitation # PE-55612-NONST-2027-000000037
Bulloch County Schools is soliciting proposals for the LED Lighting Project Phase 03, which involves retrofitting or replacing existing lighting technologies with modern LED solutions at Mill Creek Elementary School in Statesboro, Georgia. Interested contractors must conduct a mandatory site audit to develop a comprehensive Scope of Work that includes a lighting audit, detailed technical specifications for proposed LED solutions, an estimated annual energy savings report, and documentation for workmanship and fixture warranties. The project requires a turnkey, all-inclusive cost proposal that accounts for engineering, design, permitting, labor, insurance, and a 10% contingency allowance. Contractors are also expected to provide assistance in processing available energy rebates. Proposals are evaluated on a 100-point scale based on company data, team personnel expertise, letters of reference from similar institutional projects, and experience with relevant projects completed within the last three years. The award will be granted to the contractor deemed most advantageous to the school district. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract sum from a surety authorized in Georgia. The project timeline requires substantial completion within 90 calendar days of the Notice to Proceed, with a specific 60-day window for implementation. Sealed proposals must be submitted in person or by mail to the Director of Facilities Management no later than November 5, 2026, at 2:00 PM, with a public opening scheduled for 2:10 PM that same day.
Bulloch Board of Education

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Coastside Fire Protection District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS