This Government Contract opportunity from Department Of Defense was posted on August 20, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

COMPREHENSIVE EVERGLADES RESTORATION PLAN, BISCAYNE BAY COASTAL WETLANDS, L-31E FLOW-WAY, CONTRACT 5B (A PHASE I PROJECT): PUMP STATION S-703 AND RECREATIONAL SITES; MIAMI-DADE COUNTY, FLORIDA

Awarded
W912EP21C0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Contract 5B for the Biscayne Bay Coastal Wetlands project in Miami-Dade County, Florida, involves the construction of Pump Station S-703, a spreader system, and two recreational sites. The pump station, featuring a 50 cfs capacity, will move water from the L-31E Canal and C-102 into wetlands via a dissipation basin and earthen canal. Key infrastructure includes a precast concrete control building with remote operation capabilities, manatee protective barriers, and trash racks. The recreational component consists of a shelter with an information kiosk and two tent sites located near Biscayne Bay. Construction requirements are extensive, encompassing the installation of various piles, concrete work, electrical systems, and grading. Due to the local limestone geology and high conductivity, in-water construction utilizing divers will be necessary, and rock buckets may be required for excavation. Blasting is strictly prohibited within construction limits. Power will be provided by FP&L via a new 3-phase overhead line. The contract was awarded based on a Lowest Priced, Technically Acceptable (LPTA) proposal process, evaluating offerors on price, demonstrated experience, and past performance.

General Info

Contract Value

$11,645,579.2

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Miami, FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
The Biscayne Bay Coastal Wetlands (BBCW), Contract 5B covers the construction of Pump Station S-703, a spreader system, and two recreational sites. The S-703 pump station has a capacity of 50 cfs and is located at the intersection of the C-102 and L-31E Canal. S-703 will pump water from the L-31E Canal/C-102 into wetlands, east of the L-31E Levee and north of the C-102, via a dissipation/spreader basin and an earthen spreader canal. The two recreational sites will be located east of the L-31E Levee and north of the C-102, near Biscayne Bay. Work will include construction of a shelter with information kiosk, and two tent sites/pads. The pump station will have manatee protective barriers, trash racks, and dewatering features, complete with stop logs. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, cast-in-place concrete, tremie concrete, flowable fill, control building, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. FP&L will provide 3-Phase, 277/480V service for S-703 by way of a new 3-Phase, OHE powerline to S-703, coming from pump station S-705 to the south, and from the west side of L-31E Canal. Also, in coordination with the South Florida Water Management District (SFWMD), FP&L will relocate the 1-Phase, OHE powerline, serving spillway S-21A, as it is currently in interference with project features. The relocated 1-Phase, OHE powerline will be installed in locations where it will not interfere with construction features/activities. This work will be complete before this contract is awarded. In-water construction utilizing divers will be necessary, because of dewatering difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits. PROPOSAL REQUIREMENTS: AWARD WILL BE MADE TO THE OFFEROR WHO SUBMITS THE LOWEST PRICED, TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL. PROPOSALS WILL BE EVAULATED BASED ON TECHNICAL ACCEPTABILITY (DEMONSTRATED EXPERIENCE AND PAST PERFORMANCE) AND PRICE.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS