COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP) INDIAN RIVER LAGOON SOUTH (IRL-S) C-44 RESERVOIR AND STORMWATER TREATMENT AREA (C-44 RSTA) SEEPAGE MANAGEMENT FEATURE - RELIEF WELLS CONTRACT A, MARTIN COUNTY, FLORIDA

Closed
W912EP26Z1BBRFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 13 hours ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Coloma Canal Tide Gate System
Solicitation # 04.01.026
The City of Sausalito is soliciting bids for the Coloma Canal Tide Gate System project, identified as solicitation 04.01.026. The scope of work involves the installation of a concrete tide gate structure and the installation of tide gates, including clearing and grubbing the canal and providing structural concrete and reinforcement. The project requires the use of 4,000 PSI concrete and epoxy-coated reinforcement steel. The selected contractor is responsible for inspecting, picking up, and delivering the tide gates from the City's Corporation Yard to the jobsite. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. The project must be completed within 84 calendar days from the date of the Notice to Proceed. Bidders must submit sealed bids by 10:00 AM on October 30, 2026, to the Office of the City Clerk in Sausalito, California. Required submissions include bid forms, a noncollusion declaration, proof of DIR registration, workers' compensation certification, and CARB compliance certificates. Financial security requirements include a bid bond of at least 10% of the total bid price, with the successful awardee providing performance and payment bonds for 100% of the construction price. The City will withhold 5% of each progress payment as retention. Compliance with Marin County prevailing wage rates and ADA regulations is mandatory.
City of Sausalito

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Indiantown, FL, USA

Set-Aside

NONE

Documents

4

C-44 Reservoir and Stormwater Treatment Area - Earthwork Specification

PDF, High priority: read this firstspecifications
High

C-44 Reservoir Relief Wells Contract A - Section 33 26 00 Specifications

PDF, High priority: read this firstspecifications
High

IRL-S C-44 Seepage Management Relief Wells Industry Day

PDF, Low priorityindustry-day
Low

W912EP26Z1BBR IRLS C-44 Registration List

PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more

THIS IS AN ANNOUNCEMENT FOR AN UPCOMING VIRTUAL INDUSTRY DAY ONLY.  The U.S. Army Corps of Engineers-Jacksonville District (Corps) will hold a virtual Industry Day for the Comprehensive Everglades Restoration Plan (CERP) Indian River Lagoon South (IRL-S) C-44 Reservoir and Stormwater Treatment Area (C-44 RSTA) Seepage Management Feature - Relief Wells Contract A, Martin County, Florida on Wednesday, 1 April 2026. The Industry Day will consist of Opening Remarks, Technical Presentation, Procurement Strategy, and Small Business Opportunities. All interested Offerors are required to access SAM.gov for future updates. This announcement seeks information from industry and will only be used for preliminary planning purposes.  


NOTE: All interested parties to include prospective prime contractors, subcontractors and suppliers are invited to attend. This is not a solicitation for proposals and no contract shall be awarded from this notice. However, DRAFT SPECIFICATIONS have been provided for reference as attachments under this notice.


Project Description:  


The work is located on approximately 12,000 acres of land in Martin County, Florida directly north of Citrus Boulevard and the C-44 Canal (also known as the St. Lucie Canal), halfway between Lake Okeechobee and the Atlantic Ocean. For purposes of this construction contract, the anticipated location of site activities will occur throughout the current C-44 Reservoir site adjacent to the perimeter canal. The work consists of constructing groundwater pressure relief wells adjacent to the C-44 reservoir site. The wells will be constructed by typical means of water well construction and typical of USACE relief well construction, as prescribed in EM 1110-2-1914 Design, Construction and Maintenance of Relief Wells. The site where the relief wells will be constructed is relatively flat and grass covered with nearby access from existing gravel surfaced roads. There is an existing canal approximately 35 feet from the well locations and the groundwater level varies with reservoir stage and is generally higher than the canal water level. The canal water level varies (normally approximately EL 18.5 ft) and can increase up to 2 ft above normal stage during project operations. The reservoir pool varies and can be expected to be between EL 29.0 ft and EL 36 ft (3 ft to 10 ft pool) during the period of performance.


The work generally consists of:


•    Construction of approximately 126 pre-designed relief wells at the prescribed locations.
•    Documenting the construction, development, and pump testing of all wells.
•    Well construction will require managing borehole wall stability for a variety of subsurface conditions that may consist of surficial clay and silty sands, very loose uniform fine sands, dense sands having varying degrees of cementation, limestone/sandstone, and sand to cobble size shells. Groundwater conditions are likely to be slightly artesian at the well locations.
•    Construction of surface protection, access, and discharge features for each relief well into the adjacent canal.


SPECIFIC PROJECT CHALLENGES:


The work includes construction of 126 relief wells approximately 60 ft deep. The relief well will have a 10-inch diameter stainless steel riser and high flow screen, constructed in an 18 to 24-inch diameter borehole. The anulus between the borehole and riser will be backfilled with a uniform and non-calcareous filter media commonly used in the water well industry and selected for compatibility with the encountered subsurface materials. Above the screen and filter media, the borehole will be sealed with bentonite and grout. All backfill materials will be placed by tremie method. The work also includes the construction of surface protection, access, and discharge features for each relief well. The surface and protection feature will be approximately 4 ft in diameter and will consist of a standard Florida Department of Transportation Manhole or similar structure. The discharge features will consist of a 12-inch pipe connected to the surface protection and access feature that will terminate at the canal water level within a concrete headwall.  Wells must be tested and accepted no more than 5 days after construction.  Each outfall construction must be completed no more than 14 days after excavation begins. Outfall construction must be completed no more than 60 days after well is completed.


The anticipated period of performance for this project is 1060 calendar days from receipt of Notice to Proceed (NTP), and commencement of work would begin within 60 calendar days of receipt of the NTP.


The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction.


The Small Business Size Standard for this project is $45.0 million.


EVENT DETAILS:


Presentation


A presentation will be provided from 9:00 am – 10:00 am, EDT. The presentation will provide detailed information for the upcoming project of the Comprehensive Everglades Restoration Plan (CERP) Indian River Lagoon South (IRL-S) C-44 Reservoir And Stormwater Treatment Area (C-44 RSTA) Seepage Management Feature - Relief Wells Contract A, Martin County, Florida.The focus will be on scope of work, design information, construction considerations, acquisition timeline, and contracting requirements.


Breakout Sessions


The last portion of the Industry Day will be reserved for a series of  30-minute Breakout Sessions where Contractors will be able to meet one on one with the Government. Breakout Sessions will be limited to 30-minute slots available between 10:30AM and 2:00PM. Reservations are required, and slots will be available on First Come, First Served basis. All time slots are only available for those submitting as Prime Contractors. The potential offerors for the will have an opportunity to meet with representatives from the U.S. Army Corps of Engineers, Jacksonville District. 


Please view registration information and details below:


Date/Time: Wednesday, 1 April 2026 at 9:00AM



Presentation: 9:00-10:00AM, EDT



Location: Virtual (via Microsoft Teams)
https://dod.teams.microsoft.us/meet/993404376565?p=dbdKybOTaxwMMf26vK



Meeting ID: 993 404 376 565
Passcode: QW9ox6Rt



Dial in by phone
+1 601-262-2433,197952252# United States, Vicksburg
Find a local number
Phone conference ID: 197 952 252#



Event Registration Details and Instructions to Participants: In order to prepare a list of attendees of individuals participating in this Industry Day, interested parties who consider themselves qualified to perform the above-listed project are invited to submit a capabilities statement on this Special Notice via email to Ligaya Lowe at ligaya.m.lowe@usace.army.mil and Martha Sequeira at martha.g.sequeira@usace.army.mil no later than (NLT) March 30 at 5:00 pm, EDT. Your email’s subject line should be addressed as "Industry Day Registration (Your Company Name) - W912EP26Z1BBR IRLS C-44" to ensure the request is handled in a timely manner.


All interested parties who consider themselves qualified to perform the above-listed project are also invited to request a breakout session with the Government on a first come, first serve basis following the Virtual Industry Day presentation with the following breakout session timeslots as follows:


1030-1100 (1st Breakout Session)


1130-1200 (2nd Breakout Session)


1200-1300 (Lunch Break)


1300-1330   (3rd Breakout Session)


1330-1400 (4th Breakout Session)


Interested parties are highly encouraged to submit any questions via ProjNet. Firm’s response to this Special Notice shall be limited to 10 pages and shall include the following information:


1.  Firm’s name, address, point of contact, phone number, website, and email address.
2.  Firm’s interest in submitting a proposal on the solicitation when advertised.
3.  Firm’s capability to perform a contract of this magnitude and complexity (include firm’s capability to execute comparable work performed within the past 10 years from the date of this Special Notice.  Firm should provide at least two examples which, at a minimum, include the following:


•    Brief description of the project
•    Customer name
•    Timeliness of performance
•    Customer satisfaction
•    Dollar value of the project


4.  Specify type of business, Small Business Category (if any), UEI Information and if you would like to participate as a Prime or Sub-Contractor.


5.  Specify if your company would like to participate in the Breakout Sessions (Note: a response will be provided to you with the reserved time slot)


6.  Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from the bonding company.


7.  Responses to the following technical questions:


1. Innovation and Value Engineering:


Provide recommendations for any changes to the work or specifications that could enhance economy or accelerate the construction schedule. Describe any innovative construction techniques, materials, or project management approaches the government should consider.


2. Relevant Corporate Experience:


Describe projects where you have constructed wells 8-to-12-inch diameter.
Specifically detail any such projects completed in central or south Florida.


3. Drilling Methodology and Experience:


Describe your firm's experience with reverse circulation (reverse rotary) drilling methods.
Propose alternative drilling methods that may be applicable to this project's subsurface conditions and provide your rationale.


4. Schedule and Risk Mitigation:


Do you believe that the construction duration is a concern given the number of wells and outfalls in the project.


If you foresee schedule-related risks, describe them in detail and propose specific mitigation strategies (e.g., crew allocation, sequential vs. parallel operations, pre-fabrication).


5. Approach to Well Construction:


Explain your proposed approach for managing well construction and development/testing. State whether you anticipate using two or more separate drill rigs/crews and describe the number and roles of each crew.


6. Approach to Outfall System Construction:


Explain your proposed approach for constructing the outfall systems (manhole, pipe, and headwall). State whether you anticipate using two or more separate crews and describe their coordination.


7. Cofferdam and Dewatering Challenges:


Discuss anticipated challenges with cofferdam selection and dewatering for outfall construction, considering:


Seasonal weather conditions in Florida.
Variable reservoir and seepage canal levels throughout the period of performance.


8. Filter Material Installation:


Design details for some wells include one change in filter pack material and screen, and others may require two changes in filter pack material and screen. Please confirm if you consider this variation impactful to installation quality or production rates and explain why or why not.


9. Anticipated Project-Specific Problems:


Based on the information provided, identify potential problems or risks not covered in other questions (e.g., environmental, logistical, subsurface) and suggest preventative measures.


10. Material Procurement and Lead Times:


Estimate the lead time required for ordering and receiving critical materials, including well screens, risers, and specified filter material, based on current market conditions.


11. Geotechnical Challenges:


Do you have concerns regarding borehole stability or the management of potential artesian conditions during drilling? Describe your proposed methods for addressing these issues.


12. Water Source for Drilling Operations:


The use of water from the adjacent seepage canal for drilling, installation, or development of wells is prohibited. The Government anticipates that installed wells will serve as a water source for subsequent well installations. Please confirm if this approach poses any logistical or operational problems for subsequent well installations.


13. Filter Material Procurement:


Identify your proposed sources for procuring filter pack material compatible with No. 20, No. 40, No. 50, and No. 80 slot screens.


14. Material Logistics:


Describe your proposed methods for the delivery, storage, and handling of filter pack material to prevent contamination and segregation.


All responses to this Sources Sought will be evaluated and used in determining the acquisition strategy.


PLA-Related Questions:


Executive Order 14063 requires Project Labor Agreements (PLAs) for federal construction projects exceeding $35 million. The Government is seeking additional information regarding the implementation of PLAs for this project. This survey is for planning purposes only and shall not be construed as an obligation on the part of the Government.  The Government does not intend to award a contract on the basis of this market research survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey.  All information will be held in a confidential manner and will only be used for the purposes intended. This portion of the market research effort will help in the Government’s determination of whether a PLA exception applies.


Please consider the following questions in this request:


1. As a qualified contractor for a project of this type, would you be interested in participating in this project? 


2. Would the requirement for a PLA under this project impact your interest in any way? Please identify if you intend to propose on this project subject to a PLA requirement.


3. Will multiple construction Contractors and/or Subcontractors employing workers in multiple crafts or trades be required to complete the anticipated work?


4. Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.


5. Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.


6. Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.


7. Please identify if you intend to propose on this project subject to a PLA requirement.


8. Do you think requiring a PLA will increase contract costs or contribute to cost savings? Why or why not? How?


9. If you have previously been party to a PLA, approximately how long did it take to negotiate the terms of the PLA? Did PLA negotiation delay construction start? If so, by how long?


10. Any other information you think should be considered regarding the use of PLAs for the anticipated project.


NOTES:


DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.



INSTRUCTIONS FOR SUBMITTING QUESTIONS PRIOR TO INDUSTRY DAY:


The Government will address questions after the event. All questions must be submitted through ProjNet. All questions and official/approved answers will be posted on the Sam.gov website. Questions related to this Industry Day presentation can also be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, participants will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. 


All timely questions and official/approved answers will be made available through ProjNet and will also be posted on the Sam.gov website in the form of a report generated from ProjNet. We appreciate your questions and feedback by 5:00 pm, EDT on 30 March 2026  


The Bidder Inquiry Key is: R3V4PZ-5WFPW8


Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:


1. Identify the Agency. This should be marked as USACE.


2. Email. Enter the email address you would like to use for communication.


3. Key. Enter the Bidder Inquiry Key listed above.


4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.


5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.


6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.


Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:


1. For future access to ProjNet, you will not be emailed with any type of password. You will utilize your Secret Question and Secret Answer to log in.


2. Identify the Agency. This should be marked as USACE.


3. Email. Enter the email address you used to register previously in ProjNet.


4. Key. Enter the Bidder Inquiry Key listed above.


5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.


6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.


POINT OF CONTACT (POC):  Questions regarding this event can be directed to Ligaya Lowe at ligaya.m.lowe@usace.army.mil and Martha Sequeira at martha.g.sequeira@usace.army.mil .


ATTACHMENTS: The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event.


THERE IS NO SOLICITATION AT THIS TIME.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS