COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP) INDIAN RIVER LAGOON SOUTH (IRL-S) C-44 RESERVOIR AND STORMWATER TREATMENT AREA (C-44 RSTA) SEEPAGE MANAGEMENT FEATURE - RELIEF WELLS CONTRACT A, MARTIN COUNTY, FLORIDA

Closed
W912EP26X1B5DFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Indiantown, FL, USA

Set-Aside

NONE

Documents

1

C-44 Seepage Management Exhibits for Sources Sought

PDF, Low priority2 pages · sources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Feb 18, 2026 to Feb 26, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more

This announcement constitutes a Sources Sought Synopsis. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Respondents will not be notified of the results of the evaluation. 


The U.S. Army Corps of Engineers, Jacksonville District is seeking interest from prospective offerors for a potential fiscal year (FY) 2027 award of the aforementioned project.  The purpose of this sources sought is to gauge interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, as the Government must ensure there is adequate competition amongst the potential pool of responsible contractors.  There is no solicitation at this time. This request for capability information does not constitute a request for proposals and submission of any information in response to this notice is purely voluntary.


The proposed project will be a Firm Fixed Price (FFP) contract. The Jacksonville District anticipates the issuance of a Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information in response to said sources sought or any follow-up information requested.


PROJECT DESCRIPTION:


The work is located on approximately 12,000 acres of land in Martin County, Florida directly north of Citrus Boulevard and the C-44 Canal (also known as the St. Lucie Canal), halfway between Lake Okeechobee and the Atlantic Ocean. For purposes of this construction contract, the anticipated location of site activities will occur throughout the current C-44 Reservoir site adjacent to the perimeter canal. The work consists of constructing groundwater pressure relief wells adjacent to the C-44 reservoir site. The wells will be constructed by typical means of water well construction and typical of USACE relief well construction, as prescribed in EM 1110-2-1914 Design, Construction and Maintenance of Relief Wells. The site where the relief wells will be constructed is relatively flat and grass covered with nearby access from existing gravel surfaced roads. There is an existing canal approximately 35 feet from the well locations and the groundwater level varies with reservoir stage and is generally higher than the canal water level. The canal water level varies (normally approximately EL 18.5 ft) and can increase up to 2 ft above normal stage during project operations. The reservoir pool varies and can be expected to be between EL 29.0 ft and EL 36 ft (3 ft to 10 ft pool) during the period of performance.


The work generally consists of:


  • Construction of approximately 126 pre-designed relief wells at the prescribed locations.
  • Documenting the construction, development, and pump testing of all wells.
  • Well construction will require managing borehole wall stability for a variety of subsurface conditions that may consist of surficial clayey and silty sands, very loose uniform fine sands, dense sands having varying degrees of cementation, limestone/sandstone, and sand to cobble size shells. Groundwater conditions are likely to be slightly artesian at the well locations.
  • Construction of surface protection, access, and discharge features for each relief well into the adjacent canal.

SPECIFIC PROJECT CHALLENGES:


The work includes construction of 126 relief wells approximately 60 ft deep. The relief well will have a 10-inch diameter stainless steel riser and high flow screen, constructed in an 18 to 24-inch diameter borehole. The anulus between the borehole and riser will be backfilled with a uniform and non-calcareous filter media commonly used in the water well industry and selected for compatibility with the encountered subsurface materials. Above the screen and filter media, the borehole will be sealed with bentonite and grout. All backfill materials will be placed by tremie method. The work also includes the construction of surface protection, access, and discharge features for each relief well. The surface and protection feature will be approximately 4 ft in diameter and will consist of a standard Florida Department of Transportation Manhole or similar structure. The discharge features will consist of a 12-inch pipe connected to the surface protection and access feature that will terminate at the canal water level within a concrete headwall.  Wells must be tested and accepted no more than 5 days after construction.  Each outfall construction must be completed no more than 14 days after excavation begins. Outfall construction must be completed no more than 60 days after well is completed.


The Estimated Magnitude of construction is between $25,000,000 and $50,000,000.


The anticipated period of performance for this project is 1060 calendar days from receipt of Notice to Proceed (NTP), and commencement of work would begin within 60 calendar days of receipt of the NTP.


The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction.


The Small Business Size Standard for this project is $45.0 million.



Responses to this Sources Sought shall be limited to 10 pages and shall include the following information:


  1. Company/Contractor name, address, point of contact, phone number, Unique Entity ID (UEI), and e-mail address.
  2. Company’s interest in submitting a proposal for the subject requirement when solicitation is issued.
  3. Company’s capability to perform a contract of this magnitude and complexity (include company’s capability to execute comparable work performed within the past 10 years). Company should provide at least 3 examples which, at a minimum, include the following:

  • Brief description of the project
  • Customer name
  • Customer satisfaction
  • Timeliness of performance
  • Dollar value of the completed projects
  • Specify if the project was services or construction

    4. Company shall identify their Small Business classification and Small Business Size.


  • Small Business
  • Small Disadvantage Business
  • 8(a) Small Business
  • HUBZone
  • SDVOSB
  • WOSB

If your firm is a Small Business, be sure you understand the performance of work requirements for your specific socioeconomic category. i.e. SB, 8(a), SDVOSB, WOSB, or HUBZone.


       5. If significant subcontracting or teaming is anticipated in order to deliver technical capability, companies should address the structure of such arrangement include Joint Venture information, if applicable – existing and potential.


       6. Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from the bonding company.


      7. Responses to the following technical questions:


1. Innovation and Value Engineering:


Provide recommendations for any changes to the work or specifications that could enhance economy or accelerate the construction schedule. Describe any innovative construction techniques, materials, or project management approaches the government should consider.


2. Relevant Corporate Experience:


  • Describe projects where you have constructed wells 8-to-12-inch diameter.
  • Specifically detail any such projects completed in central or south Florida.

3. Drilling Methodology and Experience:


  • Describe your firm's experience with reverse circulation (reverse rotary) drilling methods.
  • Propose alternative drilling methods that may be applicable to this project's subsurface conditions and provide your rationale.

4. Schedule and Risk Mitigation:


  • Do you believe that the construction duration is a concern given the number of wells and outfalls in the project.
  • If you foresee schedule-related risks, describe them in detail and propose specific mitigation strategies (e.g., crew allocation, sequential vs. parallel operations, pre-fabrication).

5. Approach to Well Construction:


Explain your proposed approach for managing well construction and development/testing. State whether you anticipate using two or more separate drill rigs/crews and describe the number and roles of each crew.


6. Approach to Outfall System Construction:


Explain your proposed approach for constructing the outfall systems (manhole, pipe, and headwall). State whether you anticipate using two or more separate crews and describe their coordination.


7. Cofferdam and Dewatering Challenges:


Discuss anticipated challenges with cofferdam selection and dewatering for outfall construction, considering:


  • Seasonal weather conditions in Florida.
  • Variable reservoir and seepage canal levels throughout the period of performance.

8. Filter Material Installation:


Design details for some wells include one change in filter pack material and screen, and others may require two changes in filter pack material and screen. Please confirm if you consider this variation impactful to installation quality or production rates and explain why or why not.


9. Anticipated Project-Specific Problems:


Based on the information provided, identify potential problems or risks not covered in other questions (e.g., environmental, logistical, subsurface) and suggest preventative measures.


10. Material Procurement and Lead Times:


Estimate the lead time required for ordering and receiving critical materials, including well screens, risers, and specified filter material, based on current market conditions.


11. Geotechnical Challenges:


Do you have concerns regarding borehole stability or the management of potential artesian conditions during drilling? Describe your proposed methods for addressing these issues.


12. Water Source for Drilling Operations:


The use of water from the adjacent seepage canal for drilling, installation, or development of wells is prohibited. The Government anticipates that installed wells will serve as a water source for subsequent well installations. Please confirm if this approach poses any logistical or operational problems for subsequent well installations.


13. Filter Material Procurement:


Identify your proposed sources for procuring filter pack material compatible with No. 20, No. 40, No. 50, and No. 80 slot screens.


14. Material Logistics:


Describe your proposed methods for the delivery, storage, and handling of filter pack material to prevent contamination and segregation.


All responses to this Sources Sought will be evaluated and used in determining the acquisition strategy.



NOTES:


DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.


Submission Instructions:


Interested parties who consider themselves qualified to perform the work associated with the subject requirement, are invited to submit a response to this Sources Sought Notice no later than 26 February 2026, at 2:00 PM, (EST). All responses under this Sources Sought Notice shall be sent to Ligaya M. Lowe, via email at ligaya.m.lowe@usace.army.mil and Martha G. Sequeira at martha.g.sequeira@usace.army.mil.


Prior Government contract work is not required for submitting a response under this sources sought synopsis. 


You must be registered in the System for Award Management (SAM), in order to be eligible to receive an award from any Government solicitation. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS