Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Compton Disposal Trunk Sewer Rehabilitation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Compton Disposal Trunk Sewer Rehabilitation project, managed by the Los Angeles County Sanitation District, involves the critical infrastructure repair of approximately 3,284 feet of existing corroded 24-inch diameter reinforced concrete pipe. The scope of work includes the installation of a cured-in-place pipe liner (CIPP) and the application of a protective coating system to 12 manholes. The project is located within the cities of Compton and Long Beach, specifically spanning a segment that begins west of the intersection of S Temple Ave and E Greenleaf Blvd, continues west on E Greenleaf Blvd and north of S Tartar Ln, and concludes south of the intersection of E Caldwell St and Caldwell St. This project has received a Notice of Exemption under CEQA Guidelines, as it involves the rehabilitation of an existing public facility without expanding its use and is deemed necessary to prevent or mitigate an emergency. While the specific contract value and period of performance are not provided, the project is categorized under NAICS code 237110. Administrative oversight is provided by the Los Angeles County Sanitation Districts, with Patricia Horsley serving as the Environmental Planner and Brianna Mendez handling billing inquiries.

General Info

LACSD will rehabilitate 3,284 feet of sewer pipe and 12 manholes in Compton.

Agency

California → Los Angeles County Sanitation District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A

Full Description

Show more
The project will rehabilitate approximately 3,284 feet of existing corroded 24-inch diameter reinforced concrete pipe (RCP), on the Compton Disposal Trunk Sewer with cured-in-place pipe liner (CIPP) and 12 manholes with a protective coating system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS