This Solicitation opportunity from Virginia was posted on October 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Comptons Subsidence Phase II
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Compton Subsidence – Phase II Project in Tazewell County, Virginia, managed by the Virginia Department of Energy. Its primary scope involves replacing an existing retaining wall located behind the Compton Residence, with the removed materials being transported to a designated disposal area. Additionally, the project includes installing a trench drain and performing minor grading to facilitate higher water flows through crossings, thereby improving site drainage and stability. The work is scheduled for completion within 75 calendar days following the issuance of the Notice to Proceed, with a mandatory pre-bid conference set for October 30, 2025, and bid submissions due by November 12, 2025. The project’s estimated value ranges from $50,000 to $150,000, and it requires adherence to detailed technical specifications, safety protocols, and quality control measures outlined in the project documents. The project documentation encompasses comprehensive engineering plans, technical specifications, bid schedules, and special conditions that guide the execution of the work. The plans include detailed drawings and layouts for retaining walls, drainage systems, site grading, and related infrastructure, ensuring precise construction practices. The bid schedules specify quantities and pricing for various tasks such as site preparation, material procurement, excavation, and demolition, with payment based on actual field verification. Bidders are required to submit a bid bond for amounts exceeding $100,000. Overall, the project aims to address subsidence concerns by restoring and improving site stability and drainage, adhering to strict technical and safety standards, and completing the work efficiently within the specified timeframe.
General Info
Place of Performance
VA, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 43 days
- 26_1123 – Hanska-MNOpen now, due in 3 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Virginia Department of Energy
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
