Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Computing Services Center West Wing Roof Replacement

Closed
2026-08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Gatesville ISD Intermediate Campus Roof Repair
Solicitation # RFP2026-1030
Gatesville Independent School District is soliciting sealed proposals under RFP 2026-1030 for comprehensive roof repairs at the Intermediate campus, with an expanded scope via addendum to include a portion of the High School campus facility. The project requires a qualified contractor to provide all labor, supervision, equipment, and materials for a commercial roofing layover. Key technical specifications include the removal of existing gravel, installation of 2.2 inch ISO board for the main area and 1 inch ISO board for the addendum area, and the application of 60mil GAF-TPO or an equivalent system. The scope also encompasses the installation of ten GAF speedtite drains with 4 inch piping, tapered ISO boards at drains, steel deck system patching for caved-in areas, and the installation of proper flashing and pipe boots according to manufacturer specifications. The contract will be awarded based on a competitive solicitation process rather than low price alone, considering factors outlined in the Texas Education Code. Successful bidders must provide a five-year workmanship warranty, general liability insurance, and a standard manufacturer warranty. Proposers must submit a complete packet including mandatory certifications such as the SB 9 Criminal History Record, House Bill 89 Verification, and Senate Bill 252 Certification. All proposals must be submitted in sealed envelopes by October 30, 2026, at 2:30 p.m., with the final award scheduled for November 16, 2026. Bids must remain firm for 60 days following the award date.
GATESVILLE ISD

POSTED

about 11 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves a complete reroofing project at the Computing Services Center located at 480 University Way on the Southern Oregon University campus in Ashland, Oregon. The scope includes removal and replacement of the existing single ply EPDM membrane and clay tile roofing with a new 60 mil PVC membrane for approximately 9,000 square feet, along with installation of 22-gauge metal roofing covering around 3,400 square feet. All labor, materials, and equipment necessary for the project are included. Bidders must verify all dimensions and quantities onsite before submitting their proposals. This solicitation, titled "Computing Services Center West Wing Roof Replacement," was posted on April 24, 2026, with a response deadline of May 13, 2026. The contracting agency is Southern Oregon University, with the project to be performed in Oregon. No set-aside requirements or NAICS codes are specified, and further details can be accessed through the provided online link. The solicitation aims to ensure the installation of durable, long-lasting roofing materials to maintain the facility's integrity and performance.

General Info

Reroofing Computing Services Center with 60 mil PVC membrane and metal roofing, Southern Oregon University.

Agency

Southern Oregon University

Place of Performance

OR, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouthern Oregon University
ContactsNo contacts available
OfficeOR, USA
Organization / Agency
Southern Oregon University
Office AddressOR, USA
ContactsNo contact information available

Full Description

Show more
This project includes all labor, materials and equipment required to replace the existing single ply EPDM membrane and clay tile roofing with new 60 mil PVC membrane and 22-gauge metal roofing. The Computing Services Center is located 480 University Way on the SOU campus in Ashland, OR. The area-of-work for membrane replacement is approximately 9,000 square feet. The metal roof area is approximately 3,400 square feet. Bidders are required to field verify all dimensions and quantities prior to submitting a bid.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS