This Solicitation opportunity from Department Of The Interior was posted on April 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Z--CON Qrts Renovation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The solicitation seeks licensed contractors to provide Design/Build Services for the renovation and modernization of government-furnished staff quarters located in Mariano Lake, Crownpoint, and Pueblo Pintado. The project entails refurbishing these quarters to correct code deficiencies, ensuring compliance with current building codes, and upgrading associated interior and exterior utility systems. Contractors must supply supervision, labor, equipment, materials, insurance, and transportation to successfully complete the major repair and improvement tasks outlined in the Statement of Work. This project is managed by the Bureau of Indian Education under the Department of the Interior, specifically through the School Operations office located in Albuquerque, New Mexico, with the primary place of performance in Crownpoint, NM. The solicitation process requires submission of a Price Schedule, a Response to Evaluation Factors, and a Bid Bond to be considered for contract award. Questions regarding the solicitation are to be submitted by a set deadline via a designated Question Log. The contract documentation includes various required forms such as performance and payment bonds, bid bonds, and statements acknowledging subcontractor compliance with labor standards and safety policies. The project enforces adherence to federal, tribal, and state safety and building codes as outlined by the Bureau of Indian Affairs, ensuring rigorous standards for health, safety, and environmental quality. Performance tracking will be conducted through established Department of the Interior progress schedules and reports, and contractor past performance will be evaluated using standardized questionnaires rating various aspects of contract execution. The strategy of issuing a single comprehensive solicitation aims to promote efficient resource use and project success through clear performance guarantees and compliance requirements.
General Info
Place of Performance
Set-Aside
Documents
15AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- General Construction & Interior RenovationsOpen now, due in 21 days
- GH2011 Kitchen and Bathrooms RefurbishmentOpen now, due in 14 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice title changed. Set-aside added: Indian Small Business Economic Enterprise (ISBEE) Set-Aside (specific to Department of Interior and Indian Health Services). The notice description changed.
Deadline has passed
Organization & Contact Information
Full Description
1. To remove from sam.gov this requirement will be completed set aside at the agency level Agency Construction Multiple Award Contract (CMAC) and is not an open bid. No outside bid other than CMAC holders will be accepted.
2. To remove the Statement of work (the attached is the wrong SOW) posted on sam.gov
All other terms and conditions to remain the same.
__________________________________________________________________________________________________________________________________________
This solicitation is an open solicitation. Information is provided for the following Quarters Renovation Project: for Mariano Lake, Crownpoint, and Pueblo Pintado Quarters.
Bureau of Indian Education (BIE) intends to solicit licensed Contractors to provide Design/Build Services to renovate and refurbish (modernize) and bring into compliance with current building codes (correct code deficiencies) government-furnished staff quarters and upgrade associated utility systems located within the building interior/exterior. The Contractor shall furnish supervision, labor, and equipment, materials, insurance, and transportation to provide Design/Build Services to complete major repair and improvement project specified under the Statement of Work (SOW) herein. By issuing a single solicitation for this project. This strategy allows us to award contracts, ensuring project success and efficient use of resources.
Solicitation will close on April 23, 2065, at 12:00 p.m. Mountain Daylight Time (MDT).
Deadline for questions will be Wednesday, April 2, 2025, at COB. Please use the Question log attached to submit your questions to •••••@•••••.•••Sign up to see this detail. No questions will be accepted after this date and time.
All Solicitation Response packages shall include Price Schedule (Volume 1), the Response to Evaluation Factors (Volume II) and Bid bond to be considered for award.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
