Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Concrete and Pedestrian Infrastructure

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete and Pedestrian Infrastructure involves providing installation services for curbs, sidewalks, and ADA-compliant ramps for prime contractors on projects managed by the City of Rochester Bureau of Architecture and Engineering. The scope of work includes the removal and replacement of existing infrastructure, the installation of non-compliant curb ramps, and the construction of raised crosswalks, bump outs, and curb extensions using concrete and formwork. All deliverables must strictly adhere to ADA compliance standards. The opportunity was posted on November 18, 2026, with a response deadline of December 14, 2026. The project falls under NAICS code 238110 and is managed by the City of Rochester in New York. There is no specified set-aside status for this contract.

General Info

Concrete and pedestrian infrastructure installation for City of Rochester ADA compliant projects.

Documents

This scope was carved out of 2140934.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

North Clinton Avenue Milling and Resurfacing Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom North Clinton Avenue Milling and Resurfacing Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → City of Rochester
ContactsNo contacts available
OfficeN/A
Organization / AgencyNew York → City of Rochester
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs curbs, sidewalks, and ADA-compliant ramps for prime contractors on City of Rochester Bureau of Architecture & Engineering projects. Removes and replaces existing curbs and sidewalks, installs non-compliant curb ramps, and constructs curb extensions, bump outs, and raised crosswalks using concrete and formwork. Must adhere to ADA compliance standards. Delivers installed curbs, sidewalks, and accessible ramps.

Similar Contracts

Same NAICS industry code

More opportunities from New York → City of Rochester

Same awarding agency

NAICS: 237310
New
SLED
North Clinton Avenue Milling and Resurfacing Project
Solicitation # 2140934
The North Clinton Avenue Milling and Resurfacing Project is a solicitation issued by the City of Rochester, New York, under solicitation number 2140934. The project focuses on roadway, pedestrian, and utility reconstruction to enhance safety, accessibility, and multi-modal operations within the northeast quadrant of Rochester. The scope of work includes milling and resurfacing the roadway, full-depth pavement reconstruction in deteriorated areas, and the removal and replacement of non-compliant curb ramps, sidewalks, and curbs. Additionally, the project involves the construction of a protected cycle track, dedicated bicycle lanes, and curb extensions, including a significant extension at School No. 9. Pedestrian and transit improvements include the installation of mid-block and raised crosswalks, Rectangular Rapid Flashing Beacons, upgraded traffic signals, and new street lighting from Marietta Street to Upper Falls Boulevard. The project also features bus stop landing pads with seating, bicycle racks, and new street trees. Utility work consists of modifying the drainage system, constructing new drainage basins, and adjusting manholes, valves, and pull boxes. The contract includes a two-year guarantee inspection, with the agreement term extending three months beyond the completion of that inspection. There are no set-aside requirements or MWBE/DBE goals for this procurement. Proposals are due by December 14, 2026, to Phoenix Howell at the Bureau of Architecture and Engineering.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 25 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS