Concrete Repair and Foundation Work

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Repair and Foundation Work involves performing structural foundation and minor concrete repairs for prime contractors on City of Menlo Park reservoir projects located in Woodside, California. The scope of work includes the removal of precast concrete columns and the installation of cast-in-place concrete utilizing epoxy-coated steel reinforcing bars meeting ASTM D3963 standards. All ready-mix concrete must be sourced from Caltrans-approved batch plants, and the contractor is required to submit a concrete mix design and adhere to Special Inspection requirements per the CBC. The final deliverables consist of fully repaired foundations and completed exterior concrete surfaces. The response deadline for this opportunity is December 3, 2026.

General Info

Place of Performance

Woodside, CA, 94062, USA

Set-Aside

NONE

Documents

This scope was carved out of CPW009.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Reservoir No. 2 Roof Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Reservoir No. 2 Roof Replacement Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Menlo Park
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural foundation and minor concrete repairs for prime contractors on City of Menlo Park reservoir projects. Removes precast concrete columns and places cast-in-place concrete with epoxy-coated steel reinforcing bars (ASTM D3963). Uses ready-mix concrete from Caltrans-approved batch plants. Requires concrete mix design submission and Special Inspection per CBC. Delivers repaired foundations and exterior concrete surfaces.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Menlo Park

Same awarding agency

NAICS: 237110
SLED
Reservoir No. 2 Roof Replacement Project
Solicitation # CPW009
The City of Menlo Park has issued solicitation CPW009 for the Reservoir No. 2 Roof Replacement Project located in Woodside, California. The scope of work involves the demolition and removal of the existing wood and membrane roof, steel superstructure, and precast concrete columns, followed by the design and installation of a complete aluminum roof system featuring ladders, walk pads, vents, hatches, and flashing. Additionally, the project includes the installation of a new membrane liner, reservoir cleaning, disinfection, testing, commissioning, site restoration, and minor concrete repairs to the exterior of Reservoir No. 1. The contract will be awarded to the lowest responsive and responsible bidder who meets all requirements, including possessing a valid contractor's license and maintaining a clean contractual history. Bidders must submit proposals via the Planetbids portal by December 3, 2026, and include a bid deposit of 10 percent of the total bid amount. The successful contractor must provide a performance surety bond for 100 percent of the contract bid and a payment bond for expenditures exceeding 25,000 dollars. The project is subject to California Labor Code section 1771.4 prevailing wage requirements and requires a comprehensive safety plan and certificate of insurance. Technical specifications for the geomembrane liner system include strict packaging, rolling, and storage requirements to prevent material damage. Payment is processed monthly via original invoices, with the City aiming to pay within 30 days of receipt of a correct invoice.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS