Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Replacement Program FY 2025-26

Closed
9945-1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
New
Federal
Replace Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA010
The US Army is requesting quotes for the replacement of exterior cipher locks and the retrofit of exit hardware at Building 768, Schofield Barracks, in Honolulu, Hawaii. This project involves the removal of obsolete hardware and the installation of 17 DoD-approved standalone electronic 10-PIN pushbutton cipher locks, heavy-duty vertical rod panic exit hardware, and high-security Small Format Interchangeable Cores (SFIC). The scope includes specialized conversion trim for both standard and bullet-resistant door assemblies, ensuring all installations meet DoD physical security requirements and NFPA 101 Life Safety egress regulations. Key deliverables include the fully operational hardware, master override and control keys, DPW key custody documentation, programming guides, and a two-year warranty on workmanship and hardware. This solicitation is a total set-aside for Women-Owned Small Businesses under NAICS 432710. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to provide detailed technical specifications, a compliance crosswalk, and proof that installation personnel are GSA-certified and manufacturer-authorized. The period of performance is 30 calendar days from the date of award, with shipping terms set as FOB Destination. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Quotations are due by November 24, 2026, and must include a firm-fixed-price proposal and a comprehensive technical approach.
0413 Aq Hq Contract Augmented

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves a comprehensive concrete replacement and related infrastructure improvement program for the City of Newport Beach, California, with a project budget ranging from $500,000 to $2,000,000. The scope of work includes a wide array of tasks such as distributing door hanger notifications, installing traffic control and "No Parking" signs, and posting tree removal signs. It also encompasses saw cutting and removing existing concrete sidewalks, parkways, driveways, access ramps, cross gutters, curbs, and gutters, followed by constructing new concrete elements using pumping methods if necessary. The work further involves tree root removal, grading, clearing, and grubbing, as well as removing and reconstructing curb inlet decks with new hardware and adjusting manhole covers to grade. Additional responsibilities include tree removal, stump grinding, regrading, resodding parkway landscaping, patching concrete curb and gutter areas, pumping concrete for park improvements, and restoring damaged public and private improvements such as bricks, walls, turf, plants, and irrigation lines. The contractor must also restore survey markers, paint curb faces and tops where applicable, install matching grass turf, and replace utility boxes, valves, and cleanouts that are displaced or damaged. Providing temporary access during construction and completing other incidental tasks as specified in the contract documents are also required. The project is scheduled for solicitation posting on September 25, 2025, with responses due by October 21, 2025, and is managed by Daniel Jordan, reachable via email or phone.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Industrial Piping and Valve SupplyOpen now, due in 13 days
  • Proprietary Door Parts SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newport Beach
Contacts1 person available
OfficeN/A

Full Description

Show more
The work necessary for the completion of this contract consists of the following: Distributing door hanger notifications Placing “No Parking” signs and traffic control Posting tree removal signs Saw cutting and removing concrete sidewalks, parkways, driveways, accessramps, cross gutters, curbs and gutters Constructing new concrete sidewalks, parkways, driveways, access ramps, crossgutters, curbs and gutters (utilizing pump if necessary) Removing, shaving or pruning tree roots, grading, clearing and grubbing Removing existing curb inlet decks and constructing new curb inlet decks withnew hardware (includes adjusting manhole cover to grade) Removing trees, grinding stumps, root removal, regrading and resodding ofparkway landscaping as necessary Patching areas of concrete curb and gutter and sidewalk Pumping concrete for improvements in park areas Restoring public and private improvements including damaged bricks, walls, turf,grass, plants, and irrigation lines Restoring survey markers damaged or displaced by the work Painting curb face and tops red where applicable Installing grass turf as necessary to match existing grass turf Removing and replacing utility boxes, valves, and cleanouts damaged ordisplaced by the work Providing temporary access during construction And other incidental items to complete work in place as required by the ContactDocuments

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS