Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Concrete Sidewalk and Curb Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Sidewalk and Curb Construction involves the removal and installation of concrete sidewalks, curb ramps, and valley gutters for prime contractors on California Department of Transportation highway projects. The scope of work includes sawcutting asphalt concrete pavement, constructing Case G and Case CM curb ramps, and installing steel dowels and number four rebar. All finished surfaces must feature a soft broom finish and a clear curing compound to ensure a completed sidewalk and curb network. To ensure quality standards, the contractor must provide an ACI certified Quality Control Manager holding both Field Testing Technician-Grade I and Lab Testing Technician-Grade II certifications. This opportunity falls under NAICS code 238110, with a response deadline set for December 16, 2026.

General Info

Subcontract for Caltrans concrete sidewalk and curb construction; deadline December 16, 2026.

Documents

This scope was carved out of 04-2Y3014.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and installation of concrete sidewalks, curb ramps, and valley gutters for prime contractors on Caltrans highway projects. Sawcuts A.C. pavement, constructs Case G and Case CM curb ramps, and installs #4 rebar and steel dowels. Applies soft broom finish and clear curing compound. Requires ACI certified Quality Control Manager (Field Testing Technician-Grade I and Lab Testing Technician-Grade II). Delivers completed sidewalk and curb network.

Similar Contracts

Same NAICS industry code

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
Highway, Street, and Bridge Construction

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS