Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Concrete Sidewalk and Pad Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 26-198.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sidewalk Construction, Derwent Way (Cliveden Avenue to Ridley Place)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → City of Delta
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs concrete walkways and structural pads for prime contractors on City of Delta municipal projects. Places 475 linear meters of 1.5m wide sidewalk and 27 square meters of 100mm thick 32 Mpa concrete pads, including 100mm base course/gravel and scoring per MMCD dwg. C2. Delivers completed concrete sidewalks and pads.

Similar Contracts

Same NAICS industry code

More opportunities from Province of British Columbia → City of Delta

Same awarding agency

NAICS: 238220
New
International
Pool Filter Replacement - Ladner Outdoor Pool
Solicitation # 26-192
The City of Delta is seeking a qualified contractor for a turnkey project to supply, install, and commission a new pool filter at the Ladner Outdoor Pool located in British Columbia. The scope of work involves replacing the existing unit with a vertical sand filter, with a preference for an Astral Vertical Filter, and includes the installation of PVC Sched 80 piping, valves, fittings, and an inline flow meter. The project requires the environmentally approved disposal of old sand and the filter, as well as potential removal and replacement of the roof and roofing substructure to facilitate a vertical drop installation. All roofing work must be performed by an RCABC approved contractor and inspected by an RCABC roofstar inspector. The new system must be seismically restrained and utilize No. 20 silica sand and gravel, though bidders may provide optional pricing for AFG Glass Media. Bids must be submitted in a single PDF file by October 22, 2026, with pricing provided as a firm all-inclusive lump sum in Canadian funds, exclusive of GST. Evaluation factors include pricing, relevant experience, a detailed work plan, and the qualifications of personnel and engineers, who must be registered to practice in British Columbia. Successful bidders and subcontractors must possess at least five years of experience and provide a Delta Business License and a WorkSafeBC clearance letter. The target installation window is from February 14, 2027, to March 31, 2027, with a mandatory completion deadline of March 31, 2027. Payment terms are set at 30 days from the receipt of invoice or satisfactory delivery of services.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
International
Sidewalk Construction, Derwent Way (Cliveden Avenue to Ridley Place)
Solicitation # 26-198
Solicitation 26-198 is a request for proposals from the City of Delta in British Columbia for sidewalk construction on Derwent Way, spanning from Cliveden Avenue to Ridley Place. The scope of work includes the installation of 475 linear meters of 1.5m wide concrete sidewalk with a 100mm base course per MMCD dwg. C2, 27 square meters of 100mm thick 32 Mpa concrete pads, and 65 square meters of Allan Block Retaining Wall. Additional requirements involve the installation of 375 linear meters of root barriers, 19 tonnes of 65mm thick asphalt pavement for driveway restoration, and the installation of one city-supplied bench. Bidders must submit a total tender price excluding GST, which will be paid separately by the City at 5%. Submissions must include a bid bond and all pages of the Tender Form, with prices remaining firm for sixty days following the closing date. Evaluation is based on tender price and bidder capability, requiring at least three references for similar work, preferably including a municipal reference. Furthermore, the contractor must designate a qualified superintendent to be on-site at all times during construction. Force account rates will be mutually agreed upon prior to the Notice to Proceed, generally aligning with the latest Blue Book Equipment Rental Rate Guide.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS