Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Concrete Structures and Finishing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Structures and Finishing involves performing concrete forming, placement, and finishing for prime contractors on State of Utah DFCM projects located at Weber State University. The scope of work includes the installation of cast-in-place and precast concrete utilizing Class 4000 concrete and Grade 60 steel reinforcement to deliver completed concrete structures, pads, and restored surfaces. The project requires the use of ACI Certified Finishers to ensure quality standards are met. Interested parties must submit their responses by the deadline of December 22, 2026, for this opportunity categorized under NAICS code 238110.

General Info

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of CS27028.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DFCM Construction - Prequalified Mechanical & Site Civil Stage II - Weber State University - WSU Waterline Replacement, Phase 3 - Project #20417810

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs concrete forming, placement, and finishing for prime contractors on State of Utah DFCM projects at Weber State University. Installs cast-in-place and precast concrete using Class 4000 concrete and Grade 60 steel reinforcement. ACI Certified Finishers required. Delivers finished concrete structures, pads, and restored surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Install Concrete Pad for Metal Storage Building at Fire Station #63
Solicitation # FIRE-0302
The City of Santa Cruz has issued Invitation for Bids IFB No. FIRE-0302 for the installation of a concrete pad and utilities to support a metal storage building at Fire Station 63. The project scope includes the demolition and removal of existing AC material, the installation of a 35 by 42 by 4 inch concrete pad designed to support fire apparatus weighing approximately 55,000 lbs each, and the creation of a new bio-retention area following the removal of an existing storm drain inlet connection. Additionally, the contractor is responsible for a fire sprinkler trench approximately 40 feet long and 30 inches deep. The total project budget is capped at 200,000 dollars, with an estimated contract cost of approximately 177,001.28 dollars. Bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 19, 2026, following a mandatory pre-bid meeting on November 10, 2026. Award will be granted to the lowest responsive and responsible bidder. Required submittals include a completed Bid Form, a Non-Collusion Declaration, and at least three client references for similar projects completed within the last five years. The successful contractor must provide performance and payment bonds from California admitted sureties within ten business days of the award and comply with CAL/OSHA safety standards and prevailing wage requirements. The anticipated contract term is six months, with the possibility of two six-month extensions.
Fire

POSTED

about 10 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238110
New
SLED
Parking Deck Repairs – Downer Place & Galena Boulevard
Solicitation # 26-099
The City of Aurora is soliciting bids for the first year of a five-year comprehensive repair and maintenance program for the parking garages located at 5 E. Downer Place and 43 W. Galena Boulevard. This initial phase focuses primarily on the second levels of both structures and encompasses extensive concrete rehabilitation, including full-depth, partial-depth, vertical, overhead, and scattered repairs. The scope of work also includes replacing damaged connectors, updating joint sealants, and implementing critical waterproofing improvements such as recoating existing membranes, installing new membranes over repaired areas, and performing minor plumbing repairs. To conclude the project, all existing striping, ADA markings, and pedestrian indicators will be repainted. The contract will be awarded to the lowest responsible bidder. Prospective vendors must submit their proposals electronically via OpenGov by the deadline, including a bid deposit of at least 10 percent of the total bid amount, proposed phasing plans, and a preliminary construction schedule. For contracts exceeding 25,000 dollars, bidders must certify participation in US Department of Labor approved apprenticeship and training programs. Awarded contractors are required to provide a performance and payment bond covering 100 percent of the contract sum and must comply with Illinois Local Government Prompt Payment Act terms and prevailing wage laws. Materials must be delivered in original manufacturer packaging and stored in designated areas to ensure quality and durability.
Public Facilities

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 237110
New
SLED
DFCM Construction - Prequalified Mechanical & Site Civil Stage II - Weber State University - WSU Waterline Replacement, Phase 3 - Project #20417810
Solicitation # CS27028
The State of Utah Division of Facilities Construction and Management is soliciting bids for the Weber State University Waterline Replacement, Phase 3, located along 4100 South at the south end of the main campus in Ogden, Utah. This project involves the replacement of culinary water and secondary irrigation mains, including the installation of associated valves, vaults, and hydrant connections, as well as comprehensive surface restoration. The estimated construction cost for the project is $1,400,000.00. This is a low bid procurement where eligibility is strictly limited to contractors who have been prequalified under a Stage I Prequalification and are currently on the DFCM Prequalified Contractors list. Bids must be submitted via the U3P website by December 22, 2026, and must include a bid bond for 5% of the bid amount using the AIA Document A310 - 2010 form. Technical requirements include the use of ACI certified finishers for concrete work, adherence to ADA grade and slope standards, and a one-year warranty for vegetation establishment. Materials such as seed, fertilizer, and blankets must be delivered in original packaging with specific manufacturer certifications. Project acceptance is managed by the Resident Engineer and the Engineer, with specific quality standards for concrete and gradation based on UDOT requirements. The contractor is required to maintain a stable project team and provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS