Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Conditional Use Permit No. 25-10 (Bar E Dairy)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Conditional Use Permit No. 25-10 authorizes the Bar E Dairy facility, located at 6740 Corona Ave in Kingsburg, California, to construct a vermifiltration system designed to improve process water quality for reuse, storage, and land application. The project scope includes the installation of seven wastewater processing beds totaling 151,480 square feet, two wastewater lift stations, one earthen berm in an existing retention pond, a 30,296 square foot material processing area, and a 111,400 square foot manure storage area. Additionally, the facility will replace existing equipment with a wastewater process pit, two mechanical separators, three concrete push walls, one additional lift station, and a 21,645 square foot concrete slab for manure handling. The project was approved by the Kings County Community Development Agency on August 24, 2026, following a Mitigated Negative Declaration process under the California Environmental Quality Act. Key compliance requirements include the submission of a Hazardous Materials Business Plan to the Kings County Environmental Health Services Division prior to construction and adherence to a human remains protocol. The applicant is also required to maintain records of compliance, including inspection reports and employee training logs, and must ensure stormwater BMP devices are maintained per manufacturer specifications. Environmental filing fees totaling 3,117.75 dollars were processed through the Kings County Assessor/Clerk/Recorder.

General Info

Permit 25-10 authorizes Bar E Dairy to build a vermifiltration wastewater system in Kingsburg.

Agency

California → Kings County

Place of Performance

Corona Ave. & 7th Ave., CA, 93631

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kings County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Kings County
Office AddressN/A
Contacts

Interested Companies (1)

4-CreeksVisalia, CA

Full Description

Show more
The applicant is proposing to construct a vermifiltration system to produce higher quality process water for reuse, storage, and land application on an existing dairy. The proposed system will include: one (1) earthen berm in an existing wastewater retention pond, two (2) wastewater lift stations, and seven (7) wastewater processing beds with a total area of 151,480 sq. ft, a 30,296 sq. ft. material processing area, and a 111,400 sq. ft. manure storage area. The dairy facility is also replacing existing equipment with the construction and installation of one (1) wastewater process pit, two (2) mechanical separators, three (3) concrete push walls, one (1) wastewater lift station, and a 21,645 sq. ft. concrete slab for manure handling. The project site is located at 6740 Corona Ave., Kingsburg, Assessor’s Parcel Numbers 002-070-068 and 091.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS