This Solicitation opportunity from Department Of Defense was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CONNECTING LINK, RIG

Closed
SPE7L1-26-T-882QFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract pertains to the procurement of 14 connecting links, rig, identified by NSN 3040-01-091-3844, under solicitation SPE7L1-26-T-882Q, with a delivery timeframe of 641 days ADO. The contractor is required to conduct first article testing on one unit of the specified item and submit a detailed test report within 120 calendar days of contract award, with prior written notification to the contracting officer and quality assurance representative at least 14 days before shipment for government final acceptance testing. The government will issue a written approval, conditional approval, or disapproval of the first article within 120 days of receiving the test report. Production lot testing is mandated following first article approval, requiring the contractor to provide a 14-day advance notice prior to presentation of the production lot for sample selection; one unit will be randomly selected for testing unless otherwise specified in the technical data package. The contractor must bear the cost of samples consumed during testing and ensure all units are shipped via traceable means to the Redstone Technical Test Center with specific labeling and documentation, including signed DD Forms, test results, certifications, drawings, and a prepaid return label for sample restoration. All submissions must comply with MIL STD 129 and the supplemental requirements outlined in Procurement Note H03 and E04. Fast Pay is not applicable, and the contractor must confirm current dealer or distributor certification and accreditation. The contracting office is located at the Department of Defense’s Land Supply Chain in San Diego, with Dillon James as the primary point of contact.

General Info

Procure 14 connecting links, perform first article testing, submit report, comply with MIL STD 129, ship to Redstone, no Fast Pay.

NAICS

333613 - Mechanical Power Transmission Equipment Manufacturing

Place of Performance

3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USA

Set-Aside

NONE

Documents

1

Request for Quotations SPE7L1-26-T-882Q

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → LAND SUPPLY CHAIN
Contacts1 person available
OfficeUSA
Office AddressUSA

Full Description

Show more
OF THE SOLICITATION, SELECT
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 3040 / 10913844 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 120 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 120 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
SPE7L1-26-T-882Q
SECTION A
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 180 test plus 60 NSN/Part Number: 3040-01-091-3844 Quantity: 14 EA Purchase Request: 7017601789QTY: 14 Delivery: 641 days ADO

More opportunities from Department Of Defense → LAND SUPPLY CHAIN

Same awarding agency

NAICS: 339991
New
DIBBS
O-RING
Solicitation # SPE7L1-26-T-101U
Solicitation SPE7L1-26-T-101U is issued by the DLA Land and Maritime Land Supply Chain for the procurement of 13 O-rings, identified as critical application items under NSN 5331012670108. Approved sources include Parker-Hannifin Corp (P/N P-84444-13) and Curtiss-Wright Flow Control Corporation (P/N PD41047 Item 13). The contract requires delivery within 194 days after order, with a required delivery date of September 10, 2026, shipped FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The items must adhere to strict material restrictions, specifically prohibiting the use of asbestos as defined in FED-STD-313 and the intentional addition of mercury or mercury-containing compounds. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, requiring the use of medium duty, waterproof, greaseproof, opaque bags per MIL-DTL-117 to prevent UV deterioration. Inspection and acceptance will occur at the destination. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with the Buy American and Balance of Payments Program for quotes above the micro-purchase threshold. The solicitation incorporates various FAR and DFARS clauses regarding equal opportunity, waste reduction, and cybersecurity standards, including NIST SP 800-171. Offerors must submit quotations by February 27, 2026, and provide a complete data package if proposing alternate parts.
Gasket, Packing, and Sealing Device Manufacturing

POSTED

about 17 hours ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS