This Solicitation opportunity from Department Of Defense was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONNECTING LINK, RIG
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract solicitation SPE7L3-26-T-136H is for the procurement of seven CONNECTING LINK, RIG units with NSN 3040-01-117-7365 at a total value of $50.00, including pricing for First Article Testing and Production Lot Testing. The delivery is scheduled for 543 days after award with FOB Origin as the delivery and acceptance point, requiring all inspections and final acceptance to occur at the contractor’s facility. First Article Testing is mandatory for Lot/Item 3040/11177365, requiring the contractor to test one unit and submit a detailed test report within 120 calendar days of contract award, with notice provided 14 days prior to shipment for Government verification. Approved first article units must be retained by the contractor as a manufacturing standard until all production is completed and accepted, and disposition must follow DFARS 252.245-7004(d). Production Lot Testing requires the contractor to provide one randomly selected production unit to the Government for testing, with advance notification 14 days prior to presentation. Samples must be shipped to the Redstone Technical Test Center with specific markings, documentation including signed DD Forms 1222 and 250, test results, certifications, and a prepaid return label, with Government testing to be completed within 90 days plus an additional 90 days for review. Packaging must meet MIL-STD-2073-1E and MIL-STD-129, with no preservation materials used and all items marked per IUID standards per MIL-STD-130. The contractor must comply with hazardous material labeling under 29 CFR 1910.1200 and prohibitions on hexavalent chromium and ozone-depleting substances. Compliance with NIST SP 800-171 for cybersecurity, safeguarding covered defense information, and prohibiting certain telecommunications equipment is required. The contract incorporates multiple FAR and DFARS clauses including equal opportunity, anti-trafficking, employment eligibility verification, sustainable products, and whistleblower rights, with several deviations authorized. Invoicing is exclusively through WAWF, and all submissions must be made electronically via DIBBS by the August 10, 2026 deadline. The contractor must maintain current dealer/distributor certification and provide documentation of accreditation, and Fast Pay is not applicable.
General Info
Agency
NAICS
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 3040 / 11177365 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 120 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 120 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E01: Supplemental First Article Exhibit Disposition Contractor Maintained (MAY 2020)
The first article units will be maintained or returned to the contractor to be used as a manufacturing standard. The contractor shall hold the approved first article units at the production facility until all production quantities have been produced and accepted. In the case of indefinite delivery contracts, the contractor shall hold the first article units until final production run has been approved and accepted on the first delivery order. The unit shall be considered a production guide or manufacturing standard if defects are reported on delivered material or problems are encountered during production. When disposing the units, the contractor shall follow DFARS 252.245-7004(d).
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting
SPE7L3-26-T-136H
SECTION A
officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 3040-01-117-7365 Quantity: 7 EA Purchase Request: 7011409086QTY: 7 Delivery: 543 days ADO
More opportunities from Department Of Defense → LAND SUPPLIER OPNS VEHICLE SPT
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
