CONNECTING LINK, RIG
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract requires the supplier to provide one connecting link, rig with NSN 3040-00-320-3352 under solicitation SPE7L2-26-T-0556, with a delivery deadline 761 days after award. First article testing is mandated for two units of this item, and the contractor must submit a detailed test report within 90 calendar days of contract award, providing at least 14 days’ written notice to the Contracting Officer and Quality Assurance Representative before shipping the units for Final Acceptance Testing. The government has 30 days to issue written approval, conditional approval, or disapproval of the first article. Production lot testing follows successful first article approval, requiring the contractor to test randomly selected samples from the full production lot, with the government permitted to witness testing upon 14 days’ advance notice. If any sample fails, the entire lot is rejected, and corrective action must be proposed. The contractor must bear the cost of consumed or destroyed test samples and submit a formal Production Lot Test Report per DI-NDTI-80809B, accompanied by DD Form 1222, DD Form 250/iRAPT, all technical documentation, material certifications, and annotated drawings. Fast Pay is not applicable. The contractor must confirm their current dealer or distributor certification and provide evidence of accreditation. Delivery is to San Diego, California, with procurement governed by FAR 52.209-3 and its Alternate I, and all submissions must comply with Procurement Note H03 (Supplemental First Article Testing Requirements) and Procurement Note E03 (Production Lot Testing).
General Info
Agency
NAICS
Place of Performance
3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 2 UNIT(S) OF LOT/ITEM 3040 / 3203352 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 90 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 30 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E03: Production Lot Testing – Contractor (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. (2) The contractor shall provide written notice to the contracting officer and the QAR of the time and location of the test at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the production lot test so the Government may witness the test. (3) The QAR will select samples at random from the production lot(s) produced. (4) The contractor shall perform all tests on the PLT samples to verify/validate for the QAR that the items meet the contract technical/quality requirements. (5) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (6) Prepare and disseminate the PLT report as follows:
SPE7L2-26-T-0556
SECTION A
(a) Prepare the test report in accordance with data item description DI-NDTI-80809B and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].” (b) Present the contractor’s PLT report to the QAR for review. (c) Include the following documentation with all shipments of PLT Reports: DD Form 1222 and DD Form 250/iRAPT receiving report signed by the QAR; a copy of the contract/order; a copy of all applicable test reports showing actual results and tolerances specified in the technical data package; material and process certifications; process operations and inspection method sheets; copies of drawings used to manufacture the PLT sample with proper marking to restrict public disclosure (if desired) and from Government use other than for NSN/Part Number: 3040-00-320-3352 Quantity: 1 EA Purchase Request: 7017385129QTY: 1 Delivery: 761 days ADO
