Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

CONNECTOR, HULL INS

Active
N0010426QFF44Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a Hull Insert Assembly designated as SPECIAL EMPHASIS material (Level I) for use in a critical shipboard system, where failure could result in catastrophic consequences including loss of life or the vessel itself. The item must conform to MIL-DTL-24231/25 with a specific modification requiring an outside diameter of 6.375 inches and must be manufactured from HY-80, Type B material as defined in T9074-BD-GIB-010/0300 Revision 2. Comprehensive quality assurance protocols are mandated, including mandatory First Article Testing, submission and approval of a Process Control Plan and Qualification Plan prior to production, and strict traceability from raw material through final assembly using unique heat-lot or traceability markings. All certifications must be permanently documented with electronic or handwritten signatures and must unqualifiedly affirm compliance with all specifications. Non-destructive testing—including magnetic particle, dye penetrant, and ultrasonic inspections—must be performed according to specific standards, and welding procedures must be qualified under S9074-AQ-GIB-010/248 and T9074-AD-GIB-010/1688, with full qualification data submitted for review before any welding occurs. Consumed weld filler metal requires individual certification and traceability. The contract requires full compliance with ISO-9001 and either ISO-10012 or ANSI-Z540.3 with ISO-17025 for quality systems, with government inspections conducted at source. All material and component certifications must be submitted via Wide Area Work Flow (WAWF) with specific shipping, inspecting, and accepting DODAACs updated to N50286 and N39040, respectively, and notifications sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior electronic acceptance. Delivery of the final product is due no later than 365 days after contract effective date, with strict deadlines for submission of weld procedures, first article test reports, and certification data. The contract operates under Emergency Acquisition Flexibilities and is a DO-rated order under the Defense Priorities and Allocations System. It is a total small business set-aside, subject to Buy American requirements, and includes prohibitions on mercury, unauthorized marking, and unapproved deviations. All subcontractor requirements flow down, and the prime contractor

General Info

Procure HY-80 Type B Hull Insert Assembly per MIL-DTL-24231/25, 6.375" OD, with full traceability, NDT, welding qualification, and ISO compliance under DO priority.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

335931 - Current-Carrying Wiring Device ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|One|0001|30|180|benjamin.t.spangler.civ@us.navy.mil|||60|X|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. Weld procedure and qual data 120 days ADCLT Approval of weld procedures and qual data 60 days after receipt FAT REPORT 180 DAYS AFTER APPROVAL OF PRLT APPROVAL OF FAT REPORT 60 DAYS AFTER RECEIPT PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 6. This solicitation requires First Article Testing. See FAR 52.209-3 First Article Approval - Contractor Testing for more details. 7. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0025| |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=T9074-AD-GIB-010/1688 | | |1 |120713|A| | | DOCUMENT REF DATA=T9074-BD-GIB-010/0300 | | |2 |121218|A| | | 3. REQUIREMENTS 3.1 ;The Hull Insert Assembly must be in accordance with MIL-DTL-24231/25, part number M24231/25-003(MOD), except as amplified or modified herein.; 3.1.1 ;The modification to the hull insert is the outside diameter, "B" dimension, must be 6.375 inches.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Hull Insert, Item 3; Material - ;T9074-BD-GIB-010/0300, Appendix G, Grade HY-80, Type B; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Magnetic Particle Inspection; Item - ;Hull Insert, Item 3, Exterior Surfaces After Machining; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Dye Penetrant Inspection; Item - ;Clad Surfaces; Performance - ;T9074-AD-GIB-010/1688; Acceptance - ;T9074-AD-GIB-010/1688; Test - ;Ultrasonic Inspection; Item - ;HY-80 Starting Material; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;T9074-BD-GIB-010/0300; Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.4 Certification is required for the following as identified further below: - Process Control Plan - Qualification Plan - Qualification Testing (First Article) All manufacturing facilities which have been approved to an earlier revision of this specification are required to meet the recertification requirements of T9074-BD-GIB-010/0300 Revision 2. An updated Process Control Plan incorporating any changes necessary to meet the requirements of T9074-BD-GIB-010/0300 Revision 2 must be submitted. Re-certification of the first article approval of vendor facilities, processes, and manufacturing methods is required every 5 years and must meet all the requirements of T9074-BD-GIB-010/0300. The certification must be current at the delivery date of procured products. 3.4.1 Qualification Testing (First Article Inspection) - See DI-NDTI-80809 (First Article Test Report) - Certification is required for the following test on the items listed below: Test - First Article Inspection Item - ;HY-80 Starting Material; Performance - T9074-BD-GIB-010/0300 Acceptance - T9074-BD-GIB-010/0300 Previous FAT approvals that were based upon previous specifications are not valid for meeting the requirements of T9074-BD-GIB-010/0300 Revision 2, unless otherwise approved by NAVSEA. The Contractor may request the FAT submission requirement be waived by providing the PCO with evidence of NAVSEA approval, provided it meets the requirements of this contract/purchase order. 3.4.2 Process Control Plan - See DI-NDTI-80809 (Process Control Plan) - Certification is required for the following attribute on the items listed below: Attribute - Process Control Plan Item - ;HY-80 Starting Material; Performance - T9074-BD-GIB-010/0300 The PCP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the PCP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.4.3 Qualification Plan - See DI-NDTI-80809 (Qualification Plan) - Certification is required for the following attribute on the items listed below: Attribute - Qualification Plan Item - ;HY-80 Starting Material; Performance - T9074-BD-GIB-010/0300 The QP must be reviewed and approved by NAVSEA prior to initiating First Article Testing. The Contractor may request the QP submission requirement be waived by providing the PCO with evidence of NAVSEA approval. 3.5 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.6 Welding - When welding processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with T9074-AD-GIB-010/1688 by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding. 3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.7.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.9.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.10 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.11 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required in accordance with T9074-AD-GIB-010/1688, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. 3.11.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.11.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC.") 3.11.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendor's responsibility to comply with the requirements of S9074-AQ-GIB-010/248, T9074-AD-GIB-010/1688, and the contract. 3.11.4 Authority for the repair of Special Repairs in castings or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.11.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.11.6 Preparation and retention of weld records is required, as specified by section 5 of T9074-AD-GIB-010/1688. 3.11.7 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.11.8 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.14.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.14.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.14.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.14.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.14.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.17 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.17.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.17.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.17.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;; 3.18 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.18.4 ELECTRONIC SIGNATURES. 3.18.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.18.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.18.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.18.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.18.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.18.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.18.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.18.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.18.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.19 Material Handling - The written material control process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below). 3.19.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.19.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.20.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.22.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.22.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.23 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item made to T9074-BD-GIB-010/0300, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12). 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. The revision of the Process Control Plan used and the date of most recent first article approval or recertification. 5. Actual data of specified chemical and mechanical tests and a record of the final heat treatment (if applicable). 6. Qualitative results of nondestructive tests and other inspections or tests. 7. The melt processes used and the melting source of the material if the Contractor is not the melter. 8. A statement that each lot has been sampled, tested, and inspected in accordance with the specification requirements and that the manufacturer has maintained adequate manufacturing procedures demonstrated in first article testing as listed and maintained as specified in paragraph 4.3.2 of T9074-BD-GIB-010/0300 and quality assurance practices to produce a product that meets the chemical and mechanical property requirements specified throughout the product. 9. A statement that each lot meets all specification requirements. 10. Contractor's or authorized personnel's signature. 3.24 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL - Feb 26 2009 - Clarified testing and certs only apply to pieces listed - Oct 29 2010 - Added Sampling Std for LI In-Process testing - May 28 2009 - Required a Process Control Plan and FAT - Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS - Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE - Dec 17 2011 - Moved Quality Assurance Text location for Readability - Apr 15 2009 - Clarified the sample size for large and small lot sizes - Jan 19 2011 - Added notification of DCMA upon contract award - May 02 2009 - Added Lubricants and Sealants to the C of C - Aug 27 2014 - Took out contractor's phone number requirement - Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section - Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.;; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - See Clause 52.209-3 for submittal timeframes. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 60 Days After Contract Award, forward one copy to the PCO. The review (approval/disapproval) must be within 180 days from date of receipt. (60 days if proof of prior approval is submitted). DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 60 Days After Contract Award, forward one copy to the PCO. The review (approval/disapproval) must be within 180 days from date of receipt. (60 days if proof of prior approval is submitted).

Similar Contracts

Same NAICS industry code

NAICS: 335931
New
DIBBS
Special Purpose Electrical Cable Assembly SupplyThe contract entails the supply of 74 specialized electrical cable assemblies designated by NSN 6150-01-522-1330, manufactured to meet stringent military specifications. These assemblies are critical components intended for defense applications and must comply with all technical and quality standards required by the Department of Defense. The solicitation, posted on July 17, 2026, sets a response deadline of August 16, 2026, providing potential suppliers with a four-week window to submit bids under a subcontract arrangement. The North American Industry Classification System code 335931 identifies the relevant manufacturing sector, underscoring the need for industrial capability in producing electrical wiring and equipment. The contracting activity is managed by the ASC Commodities Division under the Department of Defense, indicating this is a government procurement action aimed at maintaining logistical readiness. While specific performance location and point of contact details are not provided, the order will be executed through the Defense Logistics Agency’s procurement system, accessible via the provided DIBBS link. There is no set-aside designation listed, meaning the contract is open to all qualified vendors without preference based on small business, veteran-owned, or other categories. Full compliance with military-grade tolerances, testing protocols, and delivery timelines is imperative for award consideration.
ASC COMMODITIES DIVISION

POSTED

about 14 hours ago

DEADLINE

in 29 days
View Details
NAICS: 335931
New
Federal
CHARGER,BATTERY,AIRThis solicitation, titled CHARGER,BATTERY,AIR and issued under SPRPA126QUB41 by the Department of Defense through DLA Aviation in Philadelphia, seeks newly manufactured battery chargers for foreign military sales (FMS) customers under non-CLSSA arrangements. The items are owned by foreign nations throughout their lifecycle and will be delivered to a U.S. freight forwarder for shipment directly to the customer country, bypassing the U.S. Department of Defense supply chain entirely. As a result, Item Unique Identification and Valuation requirements are waived, since these parts will never enter DoD inventory or be tracked under DoD systems. All offers must include only newly manufactured components; refurbished, remanufactured, or repaired units are strictly unacceptable. Suppliers must be government-approved sources, and distributors must submit an authorized distributor letter on official letterhead at the time of proposal submission. The parts must be FAA-certified and accompanied by an FAA Form 8130-3 Airworthy Approval Tag. The contract incorporates mandatory clauses regarding warranty, security prohibitions, Buy American provisions, equal opportunity for veterans and workers with disabilities, and compliance with workflow payment and inspection protocols. Delivery instructions follow TAC:P090 and N52 codes, and all proposals must adhere to the deadline of August 17, 2026. No drawings are available, and compliance with integrity of unit pricing, value engineering, and quality standards such as AS/EN/JISQ 9100 or equivalent is required. The solicitation is issued under EAF authority, and critical safety items are subject to DFARS clause 252.209-7010.
Pa DLA Aviation At Philadelphia

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
ASSEMBLY,POWER DISTThis contract pertains to the procurement of an ASSEMBLY, POWER DIST under solicitation SPRMM126QGD39, issued by DLA Mechanicsburg on behalf of the Department of Defense. The requirement mandates manufacturing in strict compliance with specified military standards, including MIL-STD-130 Rev N for marking and MIL-STD-2073 for packaging, with all materials required to meet exact design specifications tied to the CAGE code 53711 and reference number 8601113-116. Any changes to design, material, or part number must be formally approved through a written change order, with substitutions categorized under specific codes indicating interchangeability and impact. The contractor is fully responsible for inspection and quality assurance throughout production, maintaining complete records for 365 days post-delivery, and must ensure all supplies comply with contract requirements even in the absence of explicit inspection clauses. Delivery is governed by a deadline of July 10, 2026, with quotes accepted through July 31, 2026, and must demonstrate validity for at least 60 days. Suppliers must comply with mandatory workflows including electronic submission of invoice and receiving reports via WAWF, and RFID tagging is only applicable if the ship-to location is designated under DFARS 252.211-7006, currently none. Distributors must prove authorization from the original equipment manufacturer, and surplus suppliers must submit valid surplus certificates. All contractual documents are deemed issued upon electronic transmission, and vendors are required to register for EDA on PIEE to access modifications and orders. Non-manufacturers must disclose OEM details and CAGE codes, and all submissions must include contact information for communications. The procurement enforces security protocols, small business compliance, and mandatory certifications, while handling classified or controlled documents requires specific government certifications and directed channels for access.
SPRMM1 DLA Mechanicsburg

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details
NAICS: 335931
New
Federal
CABLE ASSEMBLY,SPECThis contract pertains to the repair of a CABLE ASSEMBLY,SPEC under solicitation N0010426QQC13, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The government requires a Repair Turnaround Time (RTAT) of 730 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system until Government acceptance. All repair work must adhere strictly to the original manufacturer’s specifications, drawings, and approved technical procedures, with compliance verified through Government Source Inspection. The contract mandates adherence to MIL-STD-130 for marking, MIL-STD-2073 for packaging, and prohibits any design, material, or part number substitutions without formal written approval from the contracting officer. The item is classified as a critical safety item, and cybersecurity maturity model certification is required. The contract explicitly states that all freight is FOB Origin and handled by the Navy under the CAV Statement of Work. The contract is issued under a Basic Ordering Agreement (BOA), with its terms incorporated by reference and overriding any conflicting provisions in this solicitation. Payment will be processed via Wide Area Workflow, and the contractor must submit a firm-fixed-price quote including unit and total pricing, RTAT, and confirmation of compliance with Buy American and Small Business Subcontracting Plan requirements. If the item has not been previously purchased by NAVSUP WSS or if pricing has increased substantially, the contractor must provide historical pricing data or comparable invoices. The Government intends to exercise an option for additional quantities within 365 days of award, at the same unit price. Contractors must be authorized distributors of the original manufacturer and provide proof of authorization. Records of all inspections and repairs must be retained for 365 days after final delivery, and any assets determined beyond repair (BR/BER) may qualify for negotiated testing and evaluation fees. The response deadline is August 17, 2026, and submission must include all required certifications, including those related to cybersecurity, security prohibitions, and annual representations.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
POWER SUPPLYThis solicitation seeks a Firm-Fixed Price procurement for a POWER SUPPLY used in the MK 78 Guided Missile Simulator, with the solicitation number N0010425QXC70 and a response deadline of July 31, 2026. The item must comply with MIL-STD-130 for unique identification and marking, and all supplies must be sourced from an authorized distributor or manufacturer, with proof of authorization required to be submitted with the quote. The contract mandates adherence to strict qualification standards, including DFARS 252.211-7003 for Item Unique Identification, and adherence to Buy American Act requirements. All packages must conform to MIL-STD-2073, and delivery is FOB Origin with Government Source Inspection required. The offer must include detailed pricing, delivery lead time, CAGE codes, profit breakdown, and a valid 90-day expiration date. The evaluation will prioritize price as the primary factor, followed by past performance and supplier risk as defined in DFARS 252.204-7024. The contractor is responsible for all quality control, inspection, and recordkeeping, with records required to be maintained for 365 days after final delivery. Any design, material, or part number changes require prior written approval from the Contracting Officer and must be classified under one of six documented change codes. Only electronic submissions via the designated Navy email are accepted, and any documentation provided by the Navy is subject to distribution restrictions as outlined in OPNAVINST 5510.1, including potential NOFORN or export-controlled status. The award will be bilateral, requiring formal contractor acceptance before execution, and no substitutions will be permitted without official authorization. The point of contact for the solicitation is Matthew Takach, with all correspondence directed to the designated Navy email address.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details
NAICS: 335931
New
Federal
CONNECTOR,RECEPTACLThis contract pertains to the procurement of a specialized Receptacle Assembly connector designated as SPECIAL EMPHASIS material (Level I/SUBSAFE) for use in critical shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The item must conform strictly to MIL-DTL-24231, with specific requirements excluding underwater explosion testing and sealing plugs but mandating pressure-proof caps, traceable welding, and compliance with stringent material specifications such as QQ-N-281 for the receptacle body. First Article Testing is required and must be destructive, with one unit delivered to Portsmouth Naval Shipyard for government evaluation—samples are not counted toward the contract quantity. All materials must be traceable from raw stock through final assembly via unique heat-lot or traceability markings, with certifications rigorously documented and electronically signed, prohibiting disclaimers such as “to the best of our knowledge.” Quantitative chemical and mechanical analyses are required, and any process altering material properties necessitates re-certification with a new traceability identifier. Quality assurance is governed by ISO-9001 with supplemental requirements from ISO-10012 and ISO/IEC 17025, or alternatively MIL-I-45208 and MIL-STD-45662, and the contractor must maintain an auditable quality system available for government inspection at all times. Welding and brazing instructions are tightly controlled under S9074 series standards, requiring submitted and approved welding procedures and qualification data prior to any production, with additional oversight for titanium materials and hardfacing. All weld filler metals require certification of origin and conformity, and subcontractor activities carry the same obligations, with the prime contractor responsible for ensuring compliance down the supply chain. Certification documentation, including test reports and compliance certificates, must be submitted via Wide Area Work Flow (WAWF) to Portsmouth Naval Shipyard with designated DODAACs N50286 (ship to) and N39040 (inspect/accept), and no material may be shipped without prior written acceptance. The contract enforces Buy American, small business set-aside, and security exclusion clauses, and requires submission of engineering change proposals for any modifications affecting form, fit, function, or interface. Delivery is bound by a 365-day timeline from contract effective date, with certification data due 20 days prior to each shipment, and inspections must be performed on a zero-defect basis with 100%
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
POWER SUPPLY UNINTEThis contract solicits the manufacture and delivery of a POWER SUPPLY UNINTE under solicitation number SPRMM126QKG30, issued by the Defense Logistics Agency (DLA) Mechanicsburg, with a response deadline of July 27, 2026. The product must conform strictly to NAVSEA drawing 7628734-3 Rev D and match the slide mounting hole configuration of IntelliPower drawing LY10382 Rev A, compatible with specific part numbers from Actron and Jonathan Engineering Solutions. The contractor is required to use the designated CAGE code 0UMT8 and reference number FA10382, and the item must be marked in accordance with MIL-STD-130 Rev N. All changes to design, material, or part number are strictly controlled and require prior written approval from the NAVICP-MECH Contracting Officer, with changes categorized by code and accompanied by supporting documentation. The contractor assumes full responsibility for inspection and quality assurance, maintaining records for 365 days after final delivery, and must utilize an approved quality system that ensures compliance even in the absence of explicit inspection clauses. Delivery and acceptance inspections are to occur at designated facilities to be specified, with final acceptance following packaging inspection. All items must be packaged per MIL-STD-2073, and electronic submission of the Invoice and Receiving Report (COMBO) via WAWF is mandatory. The solicitation requires that only authorized distributors of the original equipment manufacturer may respond, with proof of authorization submitted with the offer. Contractors must comply with cybersecurity certification, Federal Acquisition Supply Chain Security Act prohibitions, and the mandatory use of Workflow Pro's Assist Module. The contract prohibits unauthorized changes to production facilities without written approval and a $250 administrative fee, and prohibits any change that affects small business performance, delivery schedules, or FOB point. The government retains the right to inspect at any time and will not accept defective material even if sampled. All technical documents must be handled under the appropriate distribution statement, and vendors are required to register for PIEE EDA to receive contract notifications. The offer is valid for a period to be determined, and non-manufacturers must disclose the OEM name, CAGE code, and part number.
SPRMM1 DLA Mechanicsburg

POSTED

about 19 hours ago

DEADLINE

in 10 days
View Details
NAICS: 335931
New
Federal
61--HEX RECT ASSY, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of the HEX RECT ASSY under a fixed-price arrangement, with all work required to meet precise technical and quality standards established by MIL-STD-129 for marking and MIL-STD-2073 for packaging. The contractor must adhere strictly to the original manufacturer's specifications, drawings, and approved repair procedures, and any modifications to design, materials, or part numbers require prior written approval from the NAVICP-MECH Contracting Officer, categorized under specific code systems detailing the nature of the change. The item must be free of metallic mercury and any contamination, with strict prohibitions on mercury use unless explicit written authorization is obtained, including detailed justification, protective measures, and mandatory warning plates if approved. The contractor is responsible for all inspections and testing, maintaining complete records for up to 365 days after final delivery, and the Government retains the right to conduct independent inspections. Compliance with Buy American provisions, small business subcontracting requirements, and safeguarding sensitive conventional arms and explosives is mandated, along with adherence to security prohibitions and the mandatory use of Workflow Pro (WFP) for payment and invoicing. The procurement is not set aside for small businesses, and all offers must include either firm-fixed-price or time-and-materials cost estimates for repairs. The contract is issued under Navy procurement system N00104, with deliveries governed by FOB destination terms and all contractual documents deemed issued upon electronic or mailed delivery. The requirement stems from a solicitation issued by the Naval Supply Systems Command Weapon Systems Support, Mechanicsburg, PA, with responses due by August 17, 2026, and all performance activities must align with Department of Defense standards, including the prohibition of foreign national access to classified documents unless explicitly certified.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
DIBBS
Supply of Cartridge Fuses (NSN 5920-01-622-4501)The contract calls for the procurement and delivery of 338 units of cartridge fuses with military-specification compliance, specifically identified by NSN 5920-01-622-4501, adhering to all technical and packaging standards set by the Defense Logistics Agency. These fuses must meet exacting military performance criteria to ensure reliability and interoperability within defense systems, and the supplier is required to fulfill all packaging and labeling directives to support logistics and field deployment. The procurement is structured as a subcontract under the NAICS code 335931 for other electrical equipment and component manufacturing, with performance delivery targeted to the designated location in New Cumberland, Pennsylvania, ZIP code 17070-5002. The solicitation was posted on July 16, 2026, with a mandatory response deadline of July 27, 2026, indicating a tight timeline for interested parties to submit proposals. The contracting activity falls under the Active Devices Division of the Department of Defense, and while no set-aside classification or point of contact is specified, the requirement is publicly accessible via the DIBBS platform. All proposals must fully address technical compliance, delivery scheduling, and packaging specifications to be considered valid, with failure to meet any requirement potentially resulting in disqualification. The contract underscores the importance of precision manufacturing and strict adherence to defense logistics protocols.
ACTIVE DEVICES DIVISION

POSTED

1 day ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 335311
New
Federal
61--CABLE ASSEMBLY,SPECThis contract solicitation, numbered N0010426QNA17, issued by NAVSUP Weapon Systems Support Mech in Mechanicsburg, PA, seeks qualified manufacturers to produce the CABLE ASSEMBLY,SPEC under emergency acquisition flexibilities, with award to be made bilaterally upon contractor acceptance. The requirement is set aside for small businesses with NAICS code 335311 and is subject to the Defense Priorities and Allocations System (DPAS) as a rated order, requiring compliance with the Notice of Priority Rating for National Defense. The contract mandates strict adherence to engineering drawings including 5893729, 5894148 Rev J, and others, with configuration control governed by MIL-STD-973 and all changes requiring formal government approval. Suppliers must possess a government security clearance and authorized access to classified documents under DD Form 254. The cable assemblies must be manufactured to exact specifications, including serialization per NAVWC Newport instructions, physical marking in accordance with MIL-STD-129 and MIL-STD-130, and strict prohibition of mercury contamination, with any intentional inclusion requiring prior written approval and warning labeling. Production requires preproduction testing of two units each of specified cable types per DWG 5894148 Rev J, followed by lot testing and quality conformance inspections, with all results documented using DD Form 1423. A one-year warranty from date of delivery applies, and compliance with ISO 9001 quality systems is mandatory. Contractors must submit Certificates of Compliance and Quality Compliance CDRLs to NUWC Newport, and a post-award conference is recommended. The solicitation includes an option for an additional 365 days of supply quantity post-award, with evaluation based on lowest aggregate total price including the option. Delivery is required to be fulfilled within five working days for CLINs 0001AA and 0001AB, with payment instructions tied to the WIDE AREA WORKFLOW system using Stand-Alone Receiving Reports for material. All submissions must be received by August 17, 2026, and offerors must acknowledge receipt of amendments, with the government retaining rights to inspect at any point during performance to verify conformity.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339940
New
Federal
75--MARKER,TUBE TYPEThe contract pertains to the procurement of a 75–Marker, Tube Type under solicitation N0010426QBZ55, with a response deadline of August 17, 2026, and is managed by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The solicitation invokes a comprehensive set of clauses and technical requirements, including mandatory use of Workflow Pro, adherence to Safety Data Sheets and Globally Harmonized System labeling for hazardous materials, and strict compliance with the Individual Repair Part Ordering Data (IRPOD), which governs technical specifications, quality control, and packaging standards. The IRPOD is binding and must be reviewed by vendors prior to submission, with precedence given to contract amendments, the schedule of supplies, terms and conditions, and then the IRPOD in case of conflicts. Documentation must be obtained from the BPMI e-Commerce portal, and any deviation from specified revisions requires written approval from the Contracting Officer. The contract mandates full compliance with MIL-PRF-23199 packaging standards, particularly regarding heat-sealed envelopes for cleanliness-controlled parts, and prohibits the use of mercury or mercury-containing compounds. Quality assurance is governed entirely by the IRPOD, requiring contractors to maintain complete inspection records available to the Government throughout performance and beyond. Pricing for the quotation is valid for 60 days after the closing date unless otherwise specified, and all contractual documents are considered issued upon electronic transmission via email, fax, or other recognized methods. Technical Data Package (TDP) requirements, including submission of Test and Inspection Reports under DI-QCIC-8872 and Cure Date Certificates under DI-MISC-81318, must be submitted per the contract delivery schedule and only after receiving authorization from the Post Award Contracting Officer. Each submission must correspond to a unique combination of Contract Number, National Stock Number, and Item Nomenclature. The DD Form 1423 governs data delivery, specifying submission timelines, inspection and acceptance codes, distribution restrictions, and price group classifications. Distribution of technical documents is limited per DoDI 5230.24 codes, with certain materials restricted to U.S. Government use only. All commercial product representations and small business certifications are subject to the latest deviation templates effective February 2026, and cybersecurity maturity model certification levels are required under a November 2025 notice. The contract further enforces veteran and disability hiring equity mandates, priority ratings for
Office Supplies (except Paper) Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 811210
New
Federal
59--ELECTRONIC COMPONEN, IN REPAIR/MODIFICATION OFThe U.S. Navy’s Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, intends to award a sole-source contract to WARD LEONARD CT LLC for the repair of two electronic components identified by NSN 7H-5998-013160668-GL and part number 948E332G1, intended for the Sub Engineering Systems. This repair requirement is authorized under 10 U.S.C. 2304(c)(1) and FAR 6.302 due to the exclusive status of the vendor as the Original Equipment Manufacturer, with no other sources capable of performing the repair without access to proprietary data or designs solely held by the contractor. The Government does not own the technical data rights necessary to obtain support from alternate suppliers, making this source the only viable option. Deliverables are to be shipped to W25G1U, W1A8 DLA Distribution in New Cumberland, Pennsylvania, with UID requirements and Buy American Act clauses applicable. The procurement will proceed under FAR Part 15 using negotiated procedures and will not follow commercial item acquisition policies under FAR Part 12. The solicitation, identified as N0010426QYABY, is anticipated to be released on July 31, 2026, with proposals due by August 31, 2026, and an award targeted for September 15, 2026. The contract duration will be one year, and all submissions must be made electronically via the Navy Electronic Commerce Online (NECO) portal; no hard copies or telephone inquiries will be accepted. While the notice initially indicated a Total Small Business Set-Aside, the contract data reflects that this classification is not accurate, and the procurement is not restricted to small businesses. All responsible parties may submit capability statements within 45 days of the synopsis publication for consideration, though no competitive solicitation is planned unless new evidence emerges that contradicts the sole-source justification. Interested vendors must contact Taylor Weidman at taylor.m.weidman2.civ@us.navy.mil to express capability, and all responses will be evaluated solely to determine whether competition is feasible.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336390
New
Federal
ROD,TIEThis contract specifies the procurement of a tie rod designated as SPECIAL EMPHASIS material (Level I) for use in a critical shipboard system, where failure could result in catastrophic consequences including loss of life or the ship itself. All materials must comply with NAVSEA drawing 566-6985426 and conform to ASTM-A193 Grade B7, with stringent requirements for quantitative chemical and mechanical analysis, non-destructive testing via liquid penetrant or magnetic particle inspection, and full traceability from raw material through final assembly. Certification data must be submitted via WAWF to Portsmouth Naval Shipyard (DODAAC N50286) for review and prior acceptance before any shipment, with electronic submissions required for all quality evidence including test reports, weld qualifications, and compliance certificates. Electronic signatures are accepted as legally binding, provided they are uniquely controlled and auditable, and certification statements must be unqualified and positive without disclaimers. The contractor must maintain a quality system per ISO-9001 with calibration controls in accordance with ISO-10012 or ANSI-Z540.3 and is subject to government quality assurance at source, including unannounced audits and inspections by DCMA. All manufacturing, machining, welding, and subcontracting activities must adhere to specified Navy standards such as S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with welding procedures and qualifications submitted for approval prior to implementation. Traceability is mandatory throughout the supply chain, requiring permanent marking of all components with heat-lot identifiers linked to certified test reports, and strict segregation of traceable materials to prevent commingling. Any changes or deviations require formal waiver requests approved by the Contracting Officer and documented in ECDS. Material must be mercury-free, properly packaged per MIL-STD-2073, and submitted with complete documentation including 100% verification of certification data, markings, and acceptance records; delivery is capped at 365 days after contract effective date, and the order is classified as a "DO" rated priority under the Defense Priorities and Allocations System for national defense use.
Other Motor Vehicle Parts Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332991
New
Federal
BEARINGThis contract pertains to the procurement of a specialized bearing designated as SPECIAL EMPHASIS material (Level I), critical to shipboard systems where failure could result in catastrophic consequences including loss of life, ship damage, or system failure. The bearing must strictly conform to Kamatics part number KNR20-CNV-88 and satisfy stringent requirements regarding material composition, mercury-free content, configuration control, and traceability throughout manufacturing and subcontracting processes. All materials must be permanently marked for traceability to Objective Quality Evidence (OQE) in accordance with MIL-STD-792, and any loss of marking during production requires a documented control procedure to prevent commingling or loss of accountability. The contractor must maintain an ISO-9001 quality system with calibration compliance to ISO-10012 or ISO/IEC 17025, or an acceptable alternative per MIL-I-45208 and MIL-STD-45662, subject to Government evaluation and audit at any time during production. Government Quality Assurance representatives will conduct inspections at source, and all subcontractors must be notified of these requirements and include the same inspection clauses in their purchasing documents. Delivery is contingent upon a rigorous certification process: all certification data must be submitted via Wide Area WorkFlow (WAWF) 20 days prior to shipment and receive formal acceptance from Portsmouth Naval Shipyard before any material is shipped. The Certificate of Compliance must be comprehensive, showing traceability of each unit to its OQE, including NSN, manufacturer details, lubricants, cure dates, and explicit affirmation of compliance with all contract requirements—no disclaimers are permitted. Final inspection requires zero-defect acceptance per ANSI/ASQ Z1.4, with 100% verification of all certification documents. Any deviations or waivers—classified as Critical, Major, or Minor—must be submitted electronically to the NAVSUP WSS Contracting Specialist and approved before implementation, with full documentation forwarded with the material. The contract mandates strict adherence to Buy American and Free Trade Agreement provisions, prohibits foreign disclosure of controlled technical data, and requires compliance with all referenced military and industry standards including SS800-AG-MAN-010/P-9290 for non-metallic material toxicity and flammability. The warranty covers one year from the date of last delivery, and the entire procurement operates under DPAS priority rating for national defense.
Ball and Roller Bearing Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 10 days
View Details
NAICS: 332911
New
Federal
48--VALVE,SAFETY RELIEF, IN REPAIR/MODIFICATION OFThe U.S. Government, through NAVSUP Weapon Systems Support in Mechanicsburg, Pennsylvania, intends to procure the repair of a single safety relief valve, NIIN 014870393, part number SW144B02E0067, on a sole source basis from Emerson Automation Solutions, the original equipment manufacturer and only known source capable of performing the repair. No technical data or drawings are available, and the government does not own the rights to any proprietary information required for alternative sourcing. This procurement is authorized under 10 U.S.C. 2304(c)(1) and FAR 6.302, and award is anticipated to be made exclusively to Emerson Automation Solutions unless a compelling alternative is presented. The contract will be valid for one year, with UID requirements and Buy American provisions applicable. Although the notice initially indicates a Total Small Business Set-Aside, the underlying procurement context contradicts this, as the sole source restriction precludes competition. The solicitation will be issued electronically via NECO on or around July 31, 2026, with proposals due by August 21, 2026, and an anticipated award date of September 16, 2026. Interested parties may submit capability statements by email to Taylor Weidman within 15 days of the notice, but no competitive procurement is anticipated unless new commercial item proposals emerge. No hard copies or telephone inquiries will be accepted.
Industrial Valve Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 30 days
View Details
NAICS: 333618
New
Federal
STARTER,ENGINE,AIRThis contract solicitation, identified as N0010426QXB78, seeks a firm-fixed-price repair service for the STARTER, ENGINE, AIR, issued under Emergency Acquisition Flexibilities by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The requirement mandates strict adherence to MIL-STD packaging and Government Source Inspection, with all freight terms FOB Origin. The contractor must be an authorized distributor of the original equipment manufacturer and must provide written authorization from the OEM if not the manufacturer. Compliance with Item Unique Identification (IUID) requirements under DFARS 252.211-7003 and marking per MIL-STD-130 Rev N is mandatory, along with full traceability and documentation of all repair costs, including profit rates, delivery lead time, and a 90-day minimum quote expiration. The contract includes an optional increase of up to 100% of the original quantity, exercisable unilaterally by the government within 365 days of award under FAR 52.217-6, and requires acceptance of this option in the quote. The evaluation will prioritize price as the primary factor, followed by past performance and supplier performance risk under DFARS 252.204-7024. All quotations must be submitted electronically to russell.w.kreider.civ@us.navy.mil by the deadline of August 17, 2026. The contractor is responsible for full inspection and quality assurance throughout the repair process, maintaining records for one year after final delivery, and must not substitute any parts without prior written approval from the Contracting Officer, with any changes classified under specific code designations. The item must be repaired to meet the original design specifications and include coverage for all potential issues such as incomplete, damaged, or missing components. Only repairs are acceptable — test and evaluation quotes will be rejected. All documentation and proprietary information provided by the Navy must be safeguarded according to their designated distribution statements, and the awardee must ensure compliance with all security prohibitions, small business subcontracting obligations, and mandatory use of Workflow Pro and Wide Area Workflow payment instructions.
Other Engine Equipment Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 331420
New
Federal
PIPE,METALLICThis contract, issued under solicitation number N0010426QFF36 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, mandates the supply of metallic pipe meeting stringent military specifications for critical shipboard applications. The material, designated as SPECIAL EMPHASIS Level I, must comply with MIL-P-24691/3 for corrosion-resistant stainless steel seamless pipe of 1-inch nominal size and Schedule 80, with strict requirements for ultrasonic and shear wave testing, chemical and mechanical certification per DI-MISC-81020, and full traceability from heat lot to final product. All items must be seamless, free from mercury contamination, and marked permanently and temporarily per MIL-STD-792 and SAE AMS standards, with traceability numbers directly linked to certified test data. Material must originate from single heats if fewer than five pieces are supplied, and any deviation from specifications requires formal approval via the ECDS system. The contract enforces rigorous quality assurance protocols, including mandatory ISO-9001 and ISO-17025-compliant quality systems, with documented procedures subject to government audit. All certification documentation, including test reports and certificates of compliance, must be submitted via WAWF to Portsmouth Naval Shipyard prior to shipment, with delivery scheduled for 365 days post-certification acceptance. Government inspection occurs at destination, and acceptance is contingent upon 100% verification of traceability markings, certification completeness, and zero-defect sampling per ANSI/ASQ Z1.4 for lot acceptance. The award process is CLIN-specific, allowing for multiple vendors, and prohibits quantity discounts across combined CLINs. The contract includes full Buy American, Small Business Set-Aside, and Warranty provisions, with a 365-day warranty period following acceptance. Contractors must submit engineering change proposals for any configuration changes and adhere to strict documentation, data submission, and security protocols as directed by NAVSEA and Navy directives, with all submissions routed through ECDS and WAWF systems.
Copper Rolling, Drawing, Extruding, and Alloying

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339113
New
Federal
42--FILTER ASSEMBLY,GASThe contract pertains to the procurement of a Gas Filter Assembly under solicitation N0010426QBZ54, issued by NAVSUP Weapon Systems Support Mech, with a response deadline of August 17, 2026. It mandates strict adherence to technical and quality requirements defined in the Individual Repair Part Ordering Data (IRPOD), which is mandatory for vendor review and serves as the primary reference governing compliance. The contract enforces a defined order of precedence for resolving document conflicts, placing contract amendments and schedule specifications above referenced standards, drawings, and technical data. All referenced documents must be used in their entirety at specified revisions, and any deviation or waiver request must include detailed justification, technical data, and approval from the Government Quality Assurance Representative before submission to the Contracting Officer. The supplier is required to maintain a government-acceptable inspection system and retain all inspection records for the duration of performance and beyond. Packaging requirements are governed by MIL-PRF-23199 and related standards, with specific clarifications for the use of MIL-DTL-24466 green poly bags under cleanliness control conditions, while fire-retardant packaging is no longer required. Delivery must be accompanied by a Certificate of Compliance per DI-MISC-81356, issued separately for each unique contract, stock number, and nomenclature combination. The contract prohibits the intentional use of mercury in any component and mandates compliance with cybersecurity maturity model certification, equal opportunity protections for veterans and workers with disabilities, and priority rating for national defense use. Pricing is valid for 60 days after the closing date unless otherwise specified, and all contractual documents are deemed issued upon electronic transmission. Technical data packages and delivery formats are governed by DD Form 1423 requirements, including specific distribution statements and data submission frequencies, with final submissions due at the end of contract performance. The vendor must register with the BPMI e-Commerce portal to access critical technical documents and ensure full compliance with all naval specifications and security protocols.
Surgical Appliance and Supplies Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335313
New
Federal
59--MODULE,SWITCH, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of the MODULE, SWITCH with part number 5M00A69 under solicitation N0010426RYAA7, issued by NAVSUP Weapon Systems Support Mech. The work requires strict adherence to MIL-STD-129 for marking and MIL-STD-2073 for packaging, with all repairs performed in accordance with the contractor’s established technical procedures, drawings, and government-approved directives. The item must meet operational requirements tied to CAGE code 12522 and reference number 5M/0069, and no substitutions or design changes are permitted without prior written approval from the NAVICP-MECH Contracting Officer, with specific codes defining the nature of any allowed modifications. Mercury is strictly prohibited in any form unless explicitly approved, with detailed justification and protective measures required for any approved use, and contamination detection protocols mandate air sampling with a threshold of 0.01 mg/cu meter to ensure compliance. All inspection and testing must follow the original manufacturer’s specifications, and records must be maintained for 365 days after final delivery. The contract mandates compliance with a range of regulatory clauses including Buy American requirements, safeguarding of conventional arms and explosives, security prohibitions, and small business subcontracting obligations, though a set-aside was not deemed applicable. The repair work must be performed under a fixed-price or time and materials pricing structure, with final proposals due by August 17, 2026. Transportation by sea is applicable, and payment instructions follow Wide Area Workflow protocols. All contractual documents are deemed issued upon electronic or mailed delivery, and acceptance of the proposal constitutes a binding agreement. Technical documents referenced must be obtained through official DOD sources, with special handling required for NOFORN and classified materials. The point of contact for inquiries is listed with email and phone details, and performance is expected to meet the rigorous standards of naval submarine and surface ship environments, where contamination or noncompliance could pose serious operational and safety risks.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 326220
New
Federal
HOSE ASSEMBLY,NONMEThis contract pertains to the procurement of a specialized hose assembly designated as Special Emphasis material, intended for use in a critical shipboard system where failure could lead to catastrophic consequences including loss of life or vessel. The item must strictly comply with Aeroquip drawing AE1010480, part number AE1010480-H-0210, and is subject to rigorous material, welding, and testing specifications including SAE AMS-QQ-S-763, SAE AMS 6349, and SAE AMS-S-6758 for component materials. All materials require quantitative chemical and mechanical certification, traceability through heat-lot numbers permanently marked on components, and compliance with MIL-STD-1330 for oxygen cleaning. Testing includes intergranular corrosion testing, proof pressure testing at 10,000 PSI with zero leakage or deformation, and non-destructive evaluation of welds. Certification documentation must be submitted electronically via Wide Area WorkFlow (WAWF) to Portsmouth Naval Shipyard with DODAAC N50286 and must be reviewed and accepted prior to any shipment; shipping without prior acceptance is prohibited. The contract mandates a one-year warranty from date of delivery and requires strict adherence to ISO-9001 quality system standards, with an option to use MIL-I-45208 and MIL-STD-45662 as alternatives. All welding and brazing procedures must be pre-approved with submitted qualification data, and foreign certifications require U.S. unit conversions with signed attestation. The procurement is subject to Buy American Act requirements, defense priorization under DPAS, and mandatory compliance with Navy-specific quality assurance protocols including Government Source Inspection at source. Contractors must have an approved Quality Control Manual and are prohibited from using mercury or mercury compounds. Traceability must be maintained from raw material through all subcontracted operations to final assembly, with each component marked and documented in a manner that allows direct correlation to certified test reports. Electronic signatures are accepted as legally equivalent to handwritten ones under controlled systems, and all certifications must contain unqualified, positive statements of compliance with no disclaimers. Subcontractor oversight is required, with prime contractors responsible for ensuring adherence to all contractual flow-down requirements. Final delivery is due within 365 days of contract effective date, with early or incremental deliveries permitted at no additional cost. All documentation, including engineering change proposals, waivers, and deviations, must be submitted through the Electronic Contractor Data Submission
Rubber and Plastics Hoses and Belting Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details