Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Construct Conc barrier & MGS, install striping and signing.

Active
04-1Y0004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation is soliciting bids for the construction of concrete barriers and metal grid systems, along with the installation of pavement striping and traffic signing across designated locations in California. The solicitation, identified by number 04-1Y0004, was posted on July 13, 2026, with a response deadline of August 18, 2026. This effort falls under a state-level procurement and is intended to enhance highway safety and infrastructure compliance throughout the state. All work must be performed within California, and interested parties are encouraged to review the full solicitation through the provided online portal to understand scope specifics, technical requirements, and submission protocols. There is no set-aside designation indicated for this contract, meaning it is open to all qualified bidders regardless of business size or classification.

General Info

California DOT seeks bids for concrete barriers, metal grids, pavement striping, and traffic signing by August 18, 2026.

Agency

California Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(7)

Plans Document for Project 04220004121 with Addendum No. 1

PDFplans

04-1Y0004fw.pdf

PDF

04-1Y0004IH.pdf

PDF

Addendum No. 1 for Project 04-1Y0004 Construction in Solano County

PDFamendment

Contract 04-1Y0004 Bid Forms for Solano County Highway Construction

PDFforms-for-bid

Contract No. 04-1Y0004 Special Provisions and Notice to Bidders for Solano County Highway Construction

PDFnotice-to-bidders

State of California HSIMG-0802(379) Project Plans for Solano County Highway Construction

PDFproject-plans

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construct Conc barrier & MGS, install striping and signing.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Embarcadero West Rail Safety Project – Phase 1 (OVR/Market And Oak)
Solicitation # 20260811025
The City of Oakland is soliciting bids for the Embarcadero West Rail Safety Project – Phase 1 (OVR/Market And Oak), identified by solicitation number 20260811025. This construction project, categorized under NAICS code 237310, focuses on infrastructure improvements at Embarcadero West, Market Street, and Oak Street. The scope of work includes the installation of data communications active infrastructure, such as LAN electronics, structured cabling, and telecommunications racks, as well as civil works involving HDPE pipe, rock surfacing, and landscaping. The project has an estimated value of 23,536,413 dollars and requires the contractor to perform at least 30 percent of the work using its own organization. Bids must be submitted electronically via the iSupplier portal by 2:00 PM on September 3, 2026. The evaluation process is primarily price-focused, likely following a Lowest Price Technically Acceptable approach, though technical compliance regarding material quality and mix designs is required. Key contractual obligations include mandatory registration with the California Department of Industrial Relations, adherence to a 30 percent LBE/SLBE participation goal, and strict insurance requirements, including pollution liability and specific Railroad additional insured endorsements. Performance is subject to rigorous inspection and acceptance criteria, including CCTV inspections and leakage testing for sewer systems, with final acceptance granted by the City Engineer.
City of Oakland

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Sacramento County In Sacramento From 0.1 Mile North Of Fulton Avenue Overcrossing To Auburn Boulevard On-Ramp Overcrossing
Solicitation # 03-0N4504
The contract pertains to construction on State Highway 51 in Sacramento County, California, specifically between 0.1 mile north of the Fulton Avenue overcrossing and the Auburn Boulevard on-ramp overcrossing, designated as Contract No. 03-0N4504 and Project ID 0324000117. The work is governed by the California Department of Transportation’s 2025 Standard Specifications, modified by special provisions that introduce project-specific requirements, including compliance with geotechnical design reports, encroachment permits, and aerially deposited lead data. The project involves the installation of specialized infrastructure such as crash cushions, thermoplastic traffic stripe with enhanced night visibility, and concrete barriers per California-specific standard plan sheets, all to be fabricated and installed according to stringent material and quality standards including ASTM A123, AASHTO hardware specifications, and RWQCB basin plan compliance. Bids must be submitted electronically via Bid Express by 2:00 p.m. on September 9, 2026, and must be accompanied by bid security equal to at least 10 percent of the bid amount. The contract requires payment on a cost-plus-time basis, with strict adherence to prevailing wage laws determined by the California Department of Industrial Relations, and mandates that contractors pay subcontractors within seven days of receiving progress payments. All iron, steel, and manufactured products must originate from U.S. facilities, with specific requirements for non-ferrous metals, plastics, glass, lumber, and fiber optic materials under federal Buy America and 2 CFR standards. The contractor must start work within 180 days of contract approval, coordinate lane closures and traffic control with adjacent projects including 03-0J6204, 03-3J8604, 03-4J6904, and 03-0N7304, and submit electronic and hard-copy documentation including alignment profiles, digital terrain models, cross sections, and material reports. Quality assurance personnel must hold ACI Concrete Field-Testing Technician, Grade 1 certification, and temporary concrete barriers must be sourced from precast plants on Caltrans’ Authorized Facility Audit List. Certified payroll records must be managed through LCPtracker Pro, and payment information submitted through Caltrans’ prompt payment monitoring system. Environmental compliance includes submitting product stage environmental product declarations for hot mix asphalt and concrete, and all work must comply with the California Department of Transportation’s
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details