Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on April 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CONSTRUCTION CONTRACTS - HIGH MAST LIGHTING AT HND

Closed
State & Local
Submission Closed
Solicitation #
FAA LAS C/E - 3110

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Federal
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for the Emergency/Exit Lighting – Mechanical/Electrical Rooms Project located in Minot, North Dakota. The scope of work involves correcting deficiencies identified in the 2026 Facility Survey by installing code-compliant LED emergency and exit light fixtures, specifically in the Main Mechanical/Electrical Room 109 of Building 27 (Single Parent Dormitory) and Building 26 (Female Dormitory). All work must adhere to NFPA 101 Life Safety Code, NFPA 70 National Electrical Code, and applicable state and local electrical codes. The project is designated as a set-aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Bids must be submitted by December 4, 2026, at 4:00pm CST to Leana Leavitt. Required documentation for bid packages includes a current insurance certificate, contractor and trade licenses as required by the state of North Dakota, a detailed itemized quotation on the provided bid sheet, and the identification of any subcontractors. A bond is required if the proposal exceeds $150,000. The contractor must comply with Davis-Bacon Act prevailing wage requirements and coordinate any necessary electrical shutdowns with center personnel. Payment terms are Net 30 following service completion verification and receipt of invoice.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 238210
New
Federal
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to improve the efficiency, safety, and consistency of its transformer maintenance. The project focuses on three primary areas: conducting condition assessments through infrared (IR) thermographic testing, installing standardized external oil sampling devices to allow safe collection without accessing internal compartments, and performing oil testing analysis. Key deliverables include annotated infrared images, written condition assessment reports for each asset, comprehensive standard operating procedures, and on-site training for agency staff. All work must adhere to NETA MTS standards, IEEE guidelines, NFPA 70E safety protocols, and ASTM D923. This is a prevailing wage contract requiring contractors to be registered with the Department of Industrial Relations. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel experience, and a record of at least two similar projects completed within the last five years. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a signed cover letter, a completed proposal questionnaire, and various required forms including a non-collusion statement and workers' compensation certificate.
Inland Empire Utilities Agency

POSTED

about 6 hours ago

DEADLINE

in 25 days
NAICS: 238210
New
Federal
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves engaging a qualified electrical contractor to identify, inventory, test, and certify emergency lighting systems, ensuring they activate instantly and maintain illumination along egress paths in compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The estimated contract value ranges from $25,000 to $100,000, with bids due by December 1, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bidders must conduct a physical site visit and sign an attendance roster prior to submission. For bids of $25,000 or more, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contractor is responsible for providing all labor, materials, and equipment, and must adhere to Davis-Bacon Act wage determinations and federal contractor minimum wage requirements. Key deliverables include a certification of lighting readiness, a one-year guarantee of workmanship, and the integration of recurring maintenance requirements into the operator's Computerized Maintenance Management System (CMMS). Award decisions will be based on overall best value, with MTC serving as the sole judge of responsiveness.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 4 days
NAICS: 238210
New
SLED
Traffic Signal Maintenance, Repair and Minor Construction, County Wide, Job #2027-025
Solicitation # 2027-025
The Montgomery County Engineer in Ohio is soliciting a biennial contract for traffic signal maintenance, repair, and minor construction for Job #2027-025. The scope of work requires the contractor to provide all personnel, equipment, and materials to maintain and repair the county's traffic signal system, including major reconstruction of damaged installations. The contract period runs from February 1, 2027, through January 31, 2029, and requires the contractor to provide 24/7 emergency telephone service with a response time of one hour. The total estimated bid value is $152,516.76, covering estimated regular, overtime, and double-time labor hours, as well as materials and supplies from inventory and specific projects. The contract will be awarded to the lowest and best bidder who conforms to the specified provisions. Eligible contractors must be prequalified by the Ohio Department of Transportation in work types 43 (highway lighting) and 44 (traffic signals - standard). Required submissions include a Unit Price Proposal, a completed Disclosure Policy Form, a notarized Drug-Free Workplace form, and a Non-Collusion Affidavit. Additionally, the contractor must provide a performance bond for the full amount of the contract, a certification of insurance, and a workers' compensation certificate. Final payment is contingent upon the submission of a signed affidavit confirming that all invoices have been paid in full and compliance with Ohio prevailing wage rates. There is no set-aside status for this solicitation.
Montgomery County Engineer

POSTED

about 8 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract entails a federally assisted public works project at Henderson Executive Airport focused on high mast lighting improvements. The scope includes removing two existing high mast poles and lights, installing two new ones, upgrading lights on ten existing poles to LED, and relocating an NV Energy pull box. The project complies with federal regulations including 49 CFR Part 26, which governs participation by Disadvantaged Business Enterprises (DBEs), with a DBE participation goal of 2.5% of the base contract amount. It is also subject to Executive Order 11246 and other federal labor and equal employment opportunity requirements, ensuring nondiscrimination and affirmative action in contract performance. Bidders must meet several conditions including furnishing a bid guarantee and, if awarded, performance and payment bonds covering 100% of the contract price. This contract requires compliance with federal provisions such as Buy American Preference, Davis Bacon wage rates, and drug-free workplace requirements. The Owner retains the right to reject bids from contractors who have defaulted on previous contracts, failed to meet prequalification requirements, or have unresolved labor and material payments. The project encourages participation from all qualified firms regardless of size or ownership, affirming equal opportunity and fair bidding processes in accordance with Title VI of the Civil Rights Act. The contract documents and labor specifications are available for review at the Clark County Department of Aviation in Las Vegas.

General Info

High mast lighting upgrade at Henderson Airport; 2.5% DBE goal; federal labor and nondiscrimination compliance.

Documents

17
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstgeneral-conditions
High
PDF, High priority: read this firstattachment-b
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstattachment-f
High
PDF, High priority: read this firstattachment
High
PDF, High priority: read this firstbid-list-subcontractors
High
PDF, High priority: read this firstbid-bond
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstdesignation-of-subcontractors-list
High
PDF, High priority: read this firstdisclosure-of-ownership
High
OCTET-STREAM, High priority: read this firstq-and-a
High
PDF, Low prioritybidder-list
Low
PDF, Low priorityattachment
Low
OCTET-STREAM

Read all 17 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 8 days
  • Transformer Oil Testing ServicesOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada Government Marketplace
Contacts1 person available
OfficeNV, USA

Full Description

Show more
Public Works Project (PWP)# CL-2026-272 Pre-Bid Meeting is not Mandatory. PROJECT DESCRIPTION This is a federally assisted contract and therefore is subject to 49 CFR Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs. OWNER has established a DBE goal of 2.5% of the Contract amount for the Base bid. NAICS codes applicable to this work are as follows: 238210 - Electrical Contractors and Other Wiring Installation Contractors This project is located at Henderson Executive Airport and includes removing 2 existing high mast poles and lights, adding two high mast poles and lights, replacing existing lights on 10 existing poles with new LED lights, and relocating a NV Energy pull box. The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. It is the policy of the Clark County Department of Aviation (OWNER) to promote the objectives of the United States Department of Transportation (DOT) with respect to the participation of Disadvantaged Business Enterprises (DBEs) in DOT-assisted contracts. This policy has been formulated to comply with 49 CFR Part 26 and Instruction to Bidders, Exhibit D, section A12, Guidance Concerning Good Faith Efforts. Award of the Contract is conditioned on meeting the requirements for good faith efforts as defined in CFR 49 26.53. The DBE goal remains in effect throughout the term of the Contract. The requirements of 49 CFR part 26 apply to this Contract. It is the policy of the OWNER to practice nondiscrimination based on race, color, national origin, sex, or sexual orientation in the award or performance of this contract. The OWNER encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The OWNER, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 200d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The following Federal provisions are incorporated into the contract by reference: 1) Buy American Preference, 2) Foreign Trade Restriction, 3) Davis Bacon, 4) Affirmative Action, 5) Governmentwide Debarment and Suspension, 6) Governmentwide Requirements for Drug-free Workplace. The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor and the State of Nevada. The EEO requirements, labor provisions and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Aviation, Harry Reid International Airport, Contracts Office, 1845 East Russell Road, 3rd Floor, Las Vegas, Nevada, 89119. Each Bidder must supply all the information required by the bid documents and specifications. Each Bidder must furnish a Bid Guarantee equivalent to the appropriate percentage of the Bid Price described in Instructions to Bidders, Article 11.2, of the Contract documents. The "Bid Guarantee" shall consist of a firm commitment such as a Bid Bond, certified check, or other negotiable instrument accompanying a Bid as assurance that the Bidder will, upon acceptance of his Bid, execute such contractual documents as may be required within the time specified. The successful Bidder agrees to furnish a performance bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to secure fulfillment of all the Bidder's obligations under such Contract. The successful Bidder agrees to furnish a payment bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided in the Contract. OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons: Failure to comply with any pre-qualification regulations of OWNER, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding; or - Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with OWNER) at the time OWNER issues the proposal to a prospective Bidder; or - Contractor default under previous contracts with OWNER; or - Unsatisfactory work on previous contracts with OWNER. BOARD OF COMMISSIONERS CLARK COUNTY, NEVADA

More opportunities from Nevada Government Marketplace

Same awarding agency

NAICS: 238220
New
SLED
Lower Library HVAC Replacement Project
Solicitation # 27300079-B
Carson City is soliciting sealed bids for the Lower Library HVAC Replacement Project, a vertical construction project involving the replacement of packaged rooftop HVAC units and associated work at the Carson City lower library, which covers approximately 13,500 square feet. The scope includes the demolition and disposal of eight 5-ton packaged units and one 3-ton cooling unit, with new units requiring a minimum cooling effectiveness of 13.4 SEER2 and heating efficiency of 81% AFUE. The project also requires the integration of existing Eaton controllers into the new units via the Alerton Building Automation System. The engineer's estimate for the project is $344,518. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid amount. Performance is scheduled for the spring of 2027 to minimize building heating and cooling demand, and contractors must access the roof exclusively via temporary scaffolding or ladders. Key requirements include compliance with the 2023 National Electrical Code, SMACNA seismic ratings for curb adapters, and both State and Federal Prevailing Wage Rates. While the project is locally funded and not subject to BABAA requirements, it mandates 100% domestic content for iron, steel, and manufactured goods per various federal guidelines. There are no set-aside goals for DBE or SBE firms, though certified firms are encouraged to bid. Bids must be submitted electronically by December 17, 2026, and must include a bid bond of at least 5% of the base bid.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

3 days ago

DEADLINE

in 20 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS