Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Construction Cost Estimator

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of RFQ No. SCFD-0334.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Santa Cruz Lifeguard Headquarters Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fire
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Fire
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides professional construction cost estimates for prime contractors on City of California Lifeguard Headquarters repair projects. Analyzes 30% and 100% plan sets to quantify materials and labor using cost estimation software such as RSMeans. Requires a Certified Cost Professional (CCP) or similar industry certification. Delivers a detailed Construction Cost Estimate report and budget updates as design evolves.

Similar Contracts

Same NAICS industry code

More opportunities from California → Fire

Same awarding agency

NAICS: 541310
New
SLED
City of Santa Cruz Lifeguard Headquarters Repairs
Solicitation # RFQ No. SCFD-0334
The City of Santa Cruz is soliciting a Professional Services Agreement under RFQ No. SCFD-0334 for architectural services to repair the Santa Cruz Wharf Lifeguard Building. The primary objective is to implement necessary repairs to ensure the facility is safe and operationally ready. The scope of work is divided into six key tasks: the preparation of 30% and 100% completion level Building Permit Plan Sets and Project Specifications, the provision of a construction cost estimate, bid support, construction support, and the final delivery of As-Built Drawings and Annotated Project Specifications. The project follows a strict timeline, with a Notice to Proceed anticipated for January 1, 2027, and a target Certificate of Occupancy by September 15, 2027. Award selection is based on the best-qualified architect whose fee does not exceed the project budget. The evaluation process involves ranking the top three respondents by qualification regardless of fee, then verifying the highest-ranked firm's fee proposal. Selected architects must comply with AIA, ACEC, ASCE, and NSPE standards, as well as ADA requirements per CBC 11B203.3 and 11B204. Key contractual obligations include maintaining insurance for five years post-completion, adhering to California prevailing wage laws, and ensuring the security of City data. Proposals must be submitted in both hard copy and searchable PDF on a USB drive by December 3, 2026, and must include a sealed fee proposal and a valid California Architects Board license.
Architectural Services

POSTED

about 5 hours ago

DEADLINE

in 29 days
View Details
NAICS: 238110
New
SLED
Install Concrete Pad for Metal Storage Building at Fire Station #63
Solicitation # FIRE-0302
The City of Santa Cruz Fire Department has issued Invitation for Bids FIRE-0302 for the installation of a concrete pad and associated utilities to support a metal storage building at Fire Station 63. The project scope includes the demolition and removal of existing AC material, trenching for electrical and fire sprinkler lines, and the installation of a 35 by 42 by 4 inch concrete pad designed to support fire apparatus weighing approximately 55,000 lbs each. Additionally, the contractor is responsible for removing an existing storm drain inlet connection and installing a new bio-retention area. The project budget is capped at 200,000 dollars, with a mandatory pre-bid meeting scheduled for November 10, 2026, and a bid submittal deadline of November 19, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with local business preferences of 2 percent for City of Santa Cruz businesses and an additional 4 percent for locally owned businesses. The anticipated initial term is six months, with the option for two six-month extensions. Requirements for the successful bidder include providing bid, performance, and payment bonds from California admitted sureties, paying prevailing wages, and maintaining registration with the California Department of Industrial Relations. All work must comply with CAL/OSHA safety standards, the 2022 California Green Building Standards Code, and approved structural calculations valid through the end of 2026.
Poured Concrete Foundation and Structure Contractors

POSTED

5 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS