Construction, George Snyder Trail

Closed
LA06FAIRFAXCITY:97554State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

Documents

68

Appendix A - General Terms and Conditions

PDF, High priority: read this firstspecifications
High

City of Fairfax George T. Snyder Trail Construction Bid Set and Plans

PDF, High priority: read this first69 pages · rfp
High

City of Fairfax Standard Bid Bond for IFB Contract Guarantee

PDF, High priority: read this first2 pages · other
High

CMAQ-5B01 (764) - GTS Trail Adv Plans Addendum-1

PDF, High priority: read this firstspecifications
High

cq107-000130-00 Drug-Free Workplace Guidelines

DOCX, High priority: read this firstspecifications
High

Form FHWA-1273: Required Contract Provisions Federal-Aid Construction Contracts

PDF, High priority: read this firstcontract-document
High

George T. Snyder Trail Construction Plans - City of Fairfax Public Works

PDF, High priority: read this first91 pages · contract-document
High

George T. Snyder Trail Construction Project - City of Fairfax Public Works

PDF, High priority: read this first152 pages · contract-document
High

George T. Snyder Trail Construction Project Plans - City of Fairfax, VA

PDF, High priority: read this first43 pages · contract-document
High

George T. Snyder Trail Construction Project Plans - City of Fairfax, VA

PDF, High priority: read this first50 pages · contract-document
High

IFB 97554 Addendum #1 - Construction, George T. Snyder Trail

PDF, High priority: read this firstamendment
High

IFB 97554 Addendum #2 - Construction, George T. Snyder Trail

PDF, High priority: read this firstamendment
High

IFB 97554 Bid Quotation Sheet - George T. Snyder Trail

XLSX, High priority: read this firstifb
High

IFB 97554 - Construction, George T. Snyder Trail

PDF, High priority: read this firstifb
High

IFB 97554 - George T. Snyder Trail Bid Quotation Sheet

XLSX, High priority: read this firstifb
High

Part Five PW Standards and Specifications

PDF, High priority: read this firstspecifications
High

Section 103.02 Award of Contract Guidelines for Federally Funded Projects

DOCX, High priority: read this first1 page · amendment
High

SP0F0-000100-00 Predetermined Minimum Wage Rates

DOCX, High priority: read this firstwage-determination
High

SP0F0-000130-02 FHWA-1273 Required Contract Provisions

DOCX, High priority: read this firstspecifications
High

SP0F0-000150-01: Affirmative Action and EEO Special Provision

DOCX, High priority: read this firstspecifications
High

SP100-000051-00: Changed Conditions for Local Assistance Projects

DOCX, High priority: read this firstspecifications
High

SP102-000510-02 Use of Domestic Material

DOCX, High priority: read this firstspecifications
High

SP107-000120-00: Electronic Submission of Payrolls and DBE Subcontractor Payment

DOCX, High priority: read this firstspecifications
High

SP107-001510-04 - VDOT Special Provision for DBE Requirements

DOCX, High priority: read this firstspecifications
High

SP107-003000-01 - BABA Requirements for Construction Materials

DOCX, High priority: read this firstspecifications
High

SP109-000100-05 Asphalt Material Price Adjustment

DOCX, High priority: read this firstspecifications
High

SQ105-000611-01: Special Provision Section 105.06 Subcontracting

DOCX, High priority: read this firstspecifications
High

SQ107-001300-00 Prevailing Wage Rates Special Provision

DOCX, High priority: read this firstspecial-provision
High

SS109-002020-01: VDOT 2020 Road and Bridge Supplemental Specifications

DOCX, High priority: read this firstspecifications
High

SS211-002020-03: VDOT Section 211 Asphalt Concrete

DOCX, High priority: read this firstspecifications
High

SS220-002020-01: Section 220 Concrete Curing Materials

DOCX, High priority: read this firstspecifications
High

SS223-002020-02 Section 223 Steel Reinforcement Amendment

DOCX, High priority: read this firstamendment
High

SS234-002020-01: Section 234 Glass Beads and Retroreflective Optics

DOCX, High priority: read this firstspecifications
High

SS235-002020-01 Section 235 - Retroreflectors

DOCX, High priority: read this firstspecifications
High

SS246-002020-02: VDOT Section 246 Pavement Marking

DOCX, High priority: read this firstspecifications
High

SS248-002020-02: VDOT Stone Matrix Asphalt Concrete Specifications

DOCX, High priority: read this firstspecifications
High

SS308-002020-01 - Section 308 Subbase Course

DOCX, High priority: read this firstspecifications
High

SS309-002020-01: Section 309 Aggregate Base Course

DOCX, High priority: read this firstspecifications
High

SS315-002020-04 - Section 315 Asphalt Concrete Placement

DOCX, High priority: read this firstspecifications
High

SS317-002020-01: VDOT Stone Matrix Asphalt Concrete Placement

DOCX, High priority: read this firstspecifications
High

SS318-002020-01: VDOT Pavement Interlayers Supplemental Specifications

DOCX, High priority: read this firstspecifications
High

SS319-002020-02: Thin Hot Mix Asphalt Concrete Overlay

DOCX, High priority: read this firstspecifications
High

SS407-002020-02 - VDOT Road and Bridge Supplemental Specifications

DOCX, High priority: read this firstspecifications
High

SS411-002020-01 - Section 411 Protective Coating of Metal in Structures

DOCX, High priority: read this firstspecifications
High

SS512-002020-03 - Section 512 Maintaining Traffic

DOCX, High priority: read this firstspecifications
High

SS704-002020-02: VDOT Section 704 Pavement Markings and Markers

DOCX, High priority: read this firstspecifications
High

Stafford Drive Stream Restoration Construction Documents

PDF, High priority: read this firstspecifications
High

UPC 112816 - Part Eight Supplementary Conditions

PDF, High priority: read this firstspecifications
High

VA20250116 - Davis-Bacon Wage Determination (Virginia)

PDF, High priority: read this firstwage-determination
High

VA20250116 - Wage Determination for Highway Construction (Virginia)

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Oct 1, 2025 to Oct 8, 2025.

Deadline changed

Response deadline changed from Oct 8, 2025 to Oct 9, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → City of Fairfax Economic Development Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of George T. Snyder Trail (GTS Trail) from Rte. 123 (Chain Bridge Road) to US 50 (Fairfax Blvd.) (UPC112816). The GTS Trail will run along the southern side of Accotink Creek and east/west between Rte. 123 and US 50 at Draper Drive. GTS Trail is federally funded through the I-66 Outside the Beltway Concessionaire and has been developed in accordance with Virginia Department of Transportation (VDOT) policies and procedures, Federal Highway Administration (FHWA) guidelines, and VDOT’s Local Assistance Program (LAP). A prebid conference is scheduled for 9/16/2025 @ 2:00 pm (see IFB cover page).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS